Building PermitType: RESIDENTIAL BLDG Subtype: ADDITION I Status: ISSUED
Parcel No: 00573300000300 Site Address: 8023 215TH PL SW EDMONDS,WA 98026-7460
Subdivision: 003736, 005733, 005415 Lot: 0
Fire Sprinklers: Lot Area: 8505 sf Zoning: RS-8
Valuation: $300,000.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: JOSEPH- ADDITION/REMODEL M INCL P SEP
Applied: 1/6/2023
Issued:1/18/2024
Final:
Expiration Date: 1/12/2025
Issued by: NED
I WA State Contractor L & I #: HUDSOCM84603 I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
IAN JOSEPH
8023 215TH PL S-W, EDMONDS
(206)226-4106
IPJOSEPH7@YAHOO.COM
WA 98026
CONTACT
IAN JOSEPH
8023 215TH PL S-W, EDMONDS
(206)226-4106
ipjoseph7@yahoo.com
WA 98026
HUDSON CONST. &
MAINT.
100 2ND AVE S STE 200,
CONTRACTOR
(206)226-4106
LLC DBA CEDAR ONE CONST.
EDMONDS WA 98020
8023 215TH PL SW, EDMONDS
OWNER
IAN & SARAH JOSEPH
WA 98026
•- •
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
1 -BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
1/18/24
R34121
PERMITS
APPLIANCE VENTS
001.000.345.83.000.00
$30.00
$30.00
1/18/24
R34121
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
1/27/23
R25967
PER PERMIT
EACH VENT OR EXHAUST NOT
CONNECTED TO A HEATING OR AC
001.000.345.83.000.00
$45.00
$45.00
1/18/24
R34121
SYTEM
ENG - INSPECTIONS
001.000.345.83.400.00
$378.00
$378.00
1/18/24
R34121
GAS PIPING - NEW OR LOCATED
001.000.345.83.000.00
$30.00
$30.00
1/18/24
R34121
PERMIT FEE - RESIDENTIAL
001.000.345.83.000.00
$2,300.00
$2,300.00
1/18/24
R34121
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$1,955.00
$1,955.00
1/27/23
R25966
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
1/18/24
1 R34121
TOTALS: $4,834.50
$4,834.50
7
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, January 18, 2024 12:15:26 PM 1 of 3
'RESIDENTIAL
BLDG PermitCity
-
• • • •
EL
98020 1 11
www.edmondswa.gov
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
FOR
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
INFORMATION
REQUIREMENTS.
FOR
The engineering division requires 48 hours notice prior to the date of the FINAL
FINAL INSPECTION SCHEDULING
INFORMATION
Inspection.
GAS PIPE TEST
FOR
Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted
NFORMATION
INSP PRIOR TO BACKFILL
FOR
Call for all required inspections. All work shall be inspected prior to backfill.
NFORMATION
FOR
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
INFORMATION
www.mybuildingpermit.com
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
FOR
All utilities shall be located prior to any excavation. New locates shall be called for if at
UTILITY LOCATES
INFORMATION
time of excavation, original locates are no longer identifiable.
INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES
A-1 BUILDING PRECON
Printed: Thursday, January 18, 2024 12:15:26 PM 2 of 3
'RESIDENTIAL
www.edmondswa.gov
BLDG PermitCity • • • • Edmonds-
98020BLD2023-03028
B-2 DEMO AMT
VERIFICATION
B-2 FOOTINGS
B-2 FOUNDATION WALL
B-3 EXT WALL SHEATHING
B-3 GAS PIPING TEST
B-3 MECH ROUGH IN
B-3 ROOF SHEATHING
B-3 UNDERFLR FRAMING
B-4 DRYWALL FASTENING
B-4 FRAMING
B-4 SHOWER PAN
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
A-1 TESC AND MOBILIZE
E-3 STRM FOOTING DRAIN
E-3 STRM TIGHTLINE
E-9 COMPOST AMEND
E-9 SEWER ASBUILT
X-2 ENGINEERING FINAL
Printed: Thursday, January 18, 2024 12:15:26 PM 3 of 3