Building Permit_1Type: RESIDENTIAL BLDG Subtype: NEW SINGLE FAMILY I Status: ISSUED
Parcel No: 00731400000701 Site Address: 741 ALOHA ST EDMONDS,WA 98020
Subdivision: BLA LL-2001-203, SP S-03-161 AMENDED, 007314, SP S-03-161 Lot: 0
Fire Sprinklers: Lot Area: 8518 sf Zoning: IRS-8
Valuation: $553,789.17 Occupancy Type: R3 Construction Type: VB
Code Edition: 2018 No. Stories: 3 # of Dwelling Units: 1
Scope of Work: SELECT HOMES- NEW SFR/ADU -VACANT LAND, M INCL P SEP
WA State Contractor L & I #: SELECHI110KN
Applied: 9/26/2022
Issued:9/19/2023
Final:
Expiration Date: 9/13/2024
Issued by: JOK
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
BRIAN GOODNIGHT
737 ALOHA ST., EDMONDS WA
(425)774-8114
EARTHTOBRIAN@YAHOO.COM
98020
CONTACT
SELECT HOMES INC
8304 212th ST SW, EDMONDS
(425)742-6044
kayla.clark@outlook.com
WA 98026
8304 212th ST SW, EDMONDS
CONTRACTOR
SELECT HOMES INC
(425)742-6044
kayla.clark@outlook.com
WA 98026
OWNER
SELECT HOMES INC
8304 212th ST SW, EDMONDS
(425)742-6044
kayla.clark@outlook.com
WA 98026
DESCRIPTION ACCOUNT
AMOUNT PAID PAID DATE RECEIPT #
1 - BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
9/14/23
R31330
PERMITS
2019 TRANSPORTATION IMPACT
112.502.345.86.000.00
$6,249.14
$6,249.14
9/14/23
R31330
FEE
AIR HANDLERS - 10,000 CFM OR
001.000.345.83.000.00
$30.00
$30.00
9/14/23
R31330
LESS
APPLIANCE VENTS
001.000.345.83.000.00
$30.00
$30.00
9/14/23
R31330
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
9/14/23
R31330
PER PERMIT
ENGINEERING INSPECTION FEE
001.000.345.83.400.00
$1,100.00
$1,100.00
9/14/23
R31330
FAN CONNECTED TO SINGLE DUCT
001.000.345.83.000.00
$75.00
$75.00
9/14/23
R31330
FURNACE OR FIREPLACE
001.000.345.83.000.00
$60.00
$60.00
9/14/23
R31330
GAS PIPING - NEW OR LOCATED
001.000.345.83.000.00
$30.00
$30.00
9/14/23
R31330
PARK IMPACT - ADMIN FEE RES
001.000.345.83.000.00
$50.00
$50.00
9/14/23
R31330
PARK IMPACT FEE - SINGLE FAMILY
332.100.345.85.000.00
$2,734.05
$2,734.05
9/14/23
R31330
PERMIT FEE - RESIDENTIAL
001.000.345.83.000.00
$3,770.00
$3,770.00
9/14/23
R31330
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$430.45
$430.45
9/14/23
R31330
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$2,774.05
$2,774.05
10/5/22
R23527
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
9/14/23
R31330
Printed: Tuesday, January 23, 2024 3:28:04 PM 1 of 5
-RESIDENTIAL BLDG PermitCity
-
• • • •
98020 1
•
www.edmondswa.gov
DESCRIPTION
ACCOUNT AMOUNT
PAID PAID DATE
RECEIPT #
STORMWATER ENGINEER REVIEW
001.000.345.83.400.00
$1,365.00
$1,365.00
9/14/23
R31330
FEE
STORMWATER GENERAL FACILITY
422 000.379.00.000.00
$799.00
$799.00
9/14/23
R31330
CHARGE SFR OVER 5000
TRANSPORTATION IMPACT ADMIN
001.000.345.83.400.00
$50.00
$50.00
9/14/23
R31330
FEE - SFR
TOTALS: $19,643.19 $19,643.19
CONDITIONS
CONDITION TYPE
STATUS
NOTES
48 HRS NOTICE-ENGR FINAL
FOR
48 Working hours notice is required when requesting your FINAL engineering inspection.
NFORMATION
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
CARBON MONOXIDE ALARMS SHALL BE INSTALLED OUTSIDE OF EACH SEPARATE
SLEEPING AREA IN THE IMMEDIATE VICINITY OF THE BEDROOMS AND ON EACH LEVEL IN
FOR
CARBON MONOXIDE SYSTEMS
NEW CONSTRUCTION AND IN EXISTING DWELLINGS WHEN ALTERATIONS, REPAIRS OR
INFORMATION
ADDITIONS REQUIRING A PERMIT OCCUR, OR WHEN ONE OR MORE SLEEPING ROOMS
ARE ADDED OR CREATED.
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
FOR
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
INFORMATION
REQUIREMENTS.
FOR
The engineering division requires 48 hours notice prior to the date of the FINAL
FINAL INSPECTION SCHEDULING
INFORMATION
Inspection.
Printed: Tuesday, January 23, 2024 3:28:04 PM 2 of 5
: Permit
City of • • •
OL
5th Ave N, Edmonds WA 98020 1 •
www.edmondswa.gov • iiiiiiiiii&
Approval of this foundation design is conditional subject to inspection of existing site soil
FOR
conditions. Retaining walls must be designed and constructed to resist the lateral
FOUNDATION BEARING
INFORMATION
pressure of the retained material. Provisions must be made for the control and drainage
of surface water around buildings.
GAS PIPE TEST
FOR
Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted
NFORMATION
INSP PRIOR TO BACKFILL
FOR
Call for all required inspections. All work shall be inspected prior to backfill.
NFORMATION
FOR
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
INFORMATION
www.mybuildingpermit.com
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish
the datum point and the point of average grade. Call for inspections to verify. These
MAXIMUM HEIGHT
FOR
items must be consistent with the approved plan. If the proposed height of a building is
INFORMATION
within 12 inches of the maximum height permitted for the zone an elevation survey is
required.
PLANNING CONDITION
FOR
Establishment of ADU requires resident property owner land use decision
NFORMATION
New and existing buildings shall have approved address numbers, building numbers or
approved building identification placed in a position that is plainly visible from the street
POST ADDRESS
FOR
or road fronting the property. Address numbers shall be Arabic numerals or alphabet
INFORMATION
letters Numbers shall be legible from the public way, at least 6 inches high with a .75inch
min stroke width on a contrasting background.
FOR
Electronic civil asbuilt shall be submitted to the City prior to final project acceptance.
PROJECT CIVIL ASBUILT
INFORMATION
Asbuilt shall be submitted to Engineeringpermits@edmondswa.gov.
SEWER AND WATER
FOR
MAINTAIN 10 FEET OF SEPARATION BETWEEN THE SANITARY SIDE SEWER AND THE
SEPARATION
INFORMATION
WATER SERVICE LINE.
FOR
Heat pumps, AC units and similar equipment greater than 36 inches in height are not
SIDE YARD EQUIPMENT
INFORMATION
allowed within required building setbacks.
Sound or noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding
SOUND AND NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites and activities must comply with the noise limits of Chapter 5.30, unless a variance
has been granted pursuant to ECC 5.30.120.
Sound or noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding
SOUND AND NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites and activities must comply with the noise limits of Chapter 5.30, unless a variance
has been granted pursuant to ECC 5.30.120.
STORM COVENANT
FOR
A stormwater covenant shall be approved for recording prior to project final approval.
NFORMATION
FOR
All utilities shall be located prior to any excavation. New locates shall be called for if at
UTILITY LOCATES
INFORMATION
time of excavation, original locates are no longer identifiable.
Installer shall provide the manufacturer installation, operating instructions, and a whole
WHOLE HOUSE FAN
FOR
house ventilation system operation description. A label shall be affixed to the whole
INFORMATION
house timer control that reads "Whole house ventilation, see operating instructions".
Printed: Tuesday, January 23, 2024 3:28:04 PM 3 of 5
RESIDENTIAL BLDG '-rmit
AveCity of Edmonds PERMIT NUM
•:� i 1 •
www.edmondswa.gov
LM.A&
INSPECTIONS•
INSPECTIONTYPE
•.
INSPECTOR COMPLETED RESULT NOTES
B-2 RETAINING WALL
B-2 SLAB INSULATION
B-3 GAS PIPING TEST
B-3 MECH ROUGH IN
B-4 DRYWALL FASTENING
B-4 FRAMING
B-4 HEIGHT VERIFICATION
B-4 INTERIOR SHEAR
B-4 SHOWER PAN
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
E-3 STRM COVENANT
E-3 STRM PERVIOUS
SURFACES
E-4 ACCESS WIDTH SLOPE
E-4 WATER SERVICE LINE
E-5 DRIVEWAY SLOPE
E-5 ENG SPECIAL
INSPECTION
E-9 COMPOST AMEND
E-9 PROJECT ASBUILTS
X-2 ENGINEERING FINAL
A-1 TESC AND MOBILIZE
A-1 TESC AND MOBILIZE
9/21/2023
12:00:00 AM
PARTIAL
APPROVAL
TESC adequate at the time of inspection.
A-1 BUILDING PRECON
9/22/2023
12:00:00 AM
APPROVED
inspection for silt fence and tree guarding
E-4 STRM STUB CONNECT
11/1/2023
12:00:00 AM
APPROVED
6" PVC outlet from the detention system with a 6"
clean out connected to storm stub. 4" PVC footing
drain stub connected to the 6" storm stub. Ok to back
fill.
E-3 STRM MGMT FACILITY
Printed: Tuesday, January 23, 2024 3:28:04 PM 4 of 5
RESIDENTIAL BLDG PermitCity
-
• • • •
Edmonds98020 1 •
www.edmondswa.gov v iiiiiiiiii&
E-3 STRM MGMT FACILITY
11/1/2023
PARTIAL
Type II control manhole installed with control tee
12:00:00 AM
APPROVAL
with 1/2" orifice. 35' of 36" HDPE installed with a 4"
clean out on the end. All pipes are mudded on both
sides of the manhole. Pipe is bedded in pea gravel. Ok
to back fill.
B-2 FOOTINGS
11/15/2023
APPROVED
Approved
12:00:00 AM
B-1 SETBACKS
11/21/2023
APPROVED
OK per provided survey markers
12:00:00 AM
B-2 FOUNDATION WALL
11/21/2023
APPROVED
12:00:00 AM
E-3 STRM TIGHTLINE
11/29/2023
PARTIAL
4" PVC installed along the east side of the foundation
12:00:00 AM
APPROVAL
sloping towards the north. Ok to back fill.
E-3 STRM FOOTING DRAIN
11/29/2023
PARTIAL
4" perf pipe installed along the east side of the
12:00:00 AM
APPROVAL
foundation with washed rock and filter fabric. Ok to
back fill.
E-3 STRM TIGHTLINE
11/30/2023
PARTIAL
4" PVC installed along the west and north side of the
12:00:00 AM
APPROVAL
foundation sloping towards the north. 4' PVC
tightlines connected to the detention manhole. Pipe
is mudded on the outside of the manhole. Ok to back
fill.
E-3 STRM FOOTING DRAIN
11/30/2023
PARTIAL
4" perf pipe with washed rock and filter fabric
12:00:00 AM
APPROVAL
installed along the north and east side of the
foundation. Ok to back fill.
E-3 STRM TIGHTLINE
E-3 STRM TIGHTLINE
12/11/2023
PARTIAL
4" PVC installed around the south and west sides of
12:00:00 AM
APPROVAL
the foundation sloping towards the north. Ok to back
fill.
E-3 STRM FOOTING DRAIN
12/11/2023
APPROVED
4" Perf pipe installed around the south and west sides
12:00:00 AM
of the foundation with washed rock and filter fabric.
Ok to back fill.
A-1 ENGINEERING PRECON
For Jeff to chat with Gary in field for the driveway.
Printed: Tuesday, January 23, 2024 3:28:04 PM 5 of 5