Loading...
Building PermitType: COMMERCIAL BLDG Subtype: NEW TENANT IMPROVEMENT I Status: ISSUED Parcel No: 27042900302700 Subdivision: Fire Sprinklers: No Valuation: $175,000.00 Code Edition: 2018 Site Address: 22315 HIGHWAY 99 EDMONDS,WA 98026 Lot: 0 Lot Area: 74087 Occupancy Type: B No. Stories: 0 Scope of Work: KIDSTRONG- NEW T/I. P,M F SEP. Zoning: CG Construction Type: IIIA # of Dwelling Units: 0 Applied: 10/23/2023 Issued:1/25/2024 Final: Expiration Date: 1/19/2025 Issued by: NED I WA State Contractor L & I #: PROJESC831MJ I CONTACTS NAME TYPE NAME A PHONE EMAIL APPLICANT DINA ROSAS 5958 E. CORRINE 102, (480)719-0790 DINAR@DROSAS.COM SCOTTSDALE AZ 85254 BUSINESS KIDSTRONG JESSICA JOHNSTON, (425)220-9884 JESSICA.JOHNSTON@KIDSTRONG.CO M CONTACT D. ROSAS DESIGN GROUP 5958 E. CORRINE 102, (480)719-0790 dinar@drosas.com SCOTTSDALE AZ 85254 CONTRACTOR PROJECT SERVICES CORP 16410 84TH ST NE, LAKE (425)754-3141 projectservcorp@aol.com STEVENS WA 10120 NE 59TH ST, KIRKLAND OWNER PACIFIC PLAZA LLC WA 98033 FEE INFORMATION DESCRIPTION ACCOUNT AMOU PAID PAID DATE RECEIPT # BLD - COM VALUE BASED FEE 001.000.345.83.000.00 $1,840.00 $1,840.00 1/25/24 R34358 BLD - COM VALUE BASED PLAN 001.000.345.83.000.00 $1,564.00 $1,564.00 10/25/23 R32257 REVIEW CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 10/25/23 R32257 PERMIT STATE BUILDING CODE SURCHARGE 001.000.237.150 $25.00 $25.00 1/25/24 R34358 COM TOTALS: $3,474.00 $3,474.00 • R • CONDITION TYPE STATUS 71 NOTES Printed: Thursday, January 25, 2024 1:04:46 PM 1 of 2 •MERCIAL BLDG PermitCity - • • • • •:0i 1 • www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS INFORMATION REQUIREMENTS. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. NNSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES X-1 FIRE FINAL X-3 BUILDING FINAL" B-4 FRAMING B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP Printed: Thursday, January 25, 2024 1:04:46 PM 2 of 2