Building Permit_1Type: FIRE SPRINKLER Subtype: FIRE SPRINKLER MODIFICATION - COM I Status: ISSUED
Parcel No: 00434212001500
Subdivision: 004342
Fire Sprinklers:
Valuation: $800.00
Code Edition: 0
Site Address: 558 MAIN ST #108 EDMONDS,WA 98020-3183
Lot: 0
Lot Area: Zoning:
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: STILLHOUSE COFFEE- (2) FIRE SPRINKLER HEADS- MODIFICATION
Applied: 10/3/2023
Issued:10/11/2023
Final:
Expiration Date: 10/5/2024
Issued by: NED
I WA State Contractor L & I #: CROWNFP044LL I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
JESSICA ROBINSON
PO BOX 12113, MILL CREEK WA
(425)481-7669
CRISTIE@CROWNFP.COM
98082
CONTACT
CROWN FIRE PROTECTION,
PO BOX 12113, MILL CREEK WA
(425)481-7669
cristie@crownfp.com
INC.
98082
CONTRACTOR
CROWN FIRE PROTECTION
PO BOX 12113, MILL CREEK WA
(425)481-7669
CRISTIE@CROWNFP.COM
98082-
SEATTLE-SNOHOMISH
MILL
9525 AIRPORT WAY,
OWNER
COMPANY INC
SNOHOMISH WA 98296
•' •
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
10/11/23
R31845
PERMIT
FIRE - PERMIT BASE FEE
001.000.322.10.100.00
$100.00
$100.00
10/11/23
R31845
FIRE SPRINKLER MODIFICATION -
001.000.345.83.100.00
$186.00
$186.00
10/11/23
R31845
FEE
TOTALS: $331.00
$331.00
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Friday, February 02, 2024 8:23:49 AM 1 of 2
FIRE SPRINKLER Permit
P
-
City of • • •
_7
121 5th Ave N, Edmonds WA 980i 1 1 11
www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
FOR
The engineering division requires 48 hours notice prior to the date of the FINAL
FINAL INSPECTION SCHEDULING
INFORMATION
Inspection.
INSPECTIONS
- Schedule Online
at https:Hinspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR
COMPLETED
RESULT
NOTES
F-7 FIRE PRESSURE TEST
F-8 FIRE SPRINKLER INSUL
F-5 FIRE SPRINKLER
10/23/2023
APPROVED
No one at site, called (425) 481-7669 LVM, get ahold
ROUGH -IN
12:00:00 AM
of SCF DFM 19 Sherman for inspection.
F-5 FIRE SPRINKLER
10/23/2023
APPROVED
PC INSP with Tech Jim Kramp, PASS, OK to cover, DFM
ROUGH -IN
12:00:00 AM
19 Sherman.
X-1 FIRE FINAL"
F-6 FIRE BUCKET TEST
NOT REQUIRED
Printed: Friday, February 02, 2024 8:23:49 AM 2 of 2