Loading...
Prestige Traffice Reportoren� • ft City of Edmonds Traffic Impact Analysis Worksheet - �s low Name of Proposed Project: 6Art'En C Owner/Applicant J►'� e Cam, Name 7700 Alt Par%wtw Ve- Svc 3r� Street/Mailing Address ' City State Zip Telephone: (3 60) 7 3 .S _ 7155 e �� Applicant Contact Person: Carle#i Az�i�ech- Ps (Vom4 wi&s ) Name 116 E Ft i- St Svl � 4 Street/Mailing Address Aaw,f- WA 9f273 City / State Zip Telephone: 1*03y4 �-Ia4 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): NIA Firm Name Telephone: THRESHOLD LEVELS OF ANALYSIS Contact Name E-mail: Project Traffic Levels Sections to Complete I. Less than 25 peak -hour trips generated 1 and 7 only (Worksheet/Checklist) II. More than 25 peak -hour trips generated All sections PROJECT DESCRIPTION a. Location - Street address:?, 1003 701% Ai-C W E&yfit�S t YV j qro Z6 a vicinity map and site plan.) b. Specify existing land use: E r n 2 Nj l lf4 1VUgI ni, ha l �w " J / c. Specify proposed type and size of development: %Ire.w IL 385 Sf , (S q) ,p0✓klilti 5L'Ilao) iw . /Qlw iV"If\o cl6bi (# of residential units and/or square footage of building) Revised on 6124110 E82 - Ti arc Impact Analysis Worksheet Page 1 of 5 d. Date construction will begin and be completed: 'Ecai � S�n�1 I ►n � l SWI't `td' ZU I� e. Define proposed access locations: E-'Ti�h'nj C CCPSf /C/C40,1 i 1 £ Define proposed sight distance at site egress locations: vn obSl file 41�r. 2. TRIP GENERATION Source shall be the Eighth Edition of the Institute of Transportation Engineers (ITE) Trip Generation manual. For independent fee calculations, the current edition of the ITE manual may be used. ADT = Average Daily Traffic PM Peak -hour trips (AM, noon or school peak may also apply as directed by the City Engineer) a. Existing Site Trip Generation Table: A w-C _�Kplr VnIVISCA Land Use Daily (ADT) PM Peals -Hour Trips IN OUT gq RCS 'RCS—(Alm 420 4-, 6e remv✓ oc i n (N,lrs I�mc b. Proposed Project Trip Generation Table: Less 47,0n L' 13hil /J Land Use Daily (ADT) PM Peak -Hour Trips IN OUT Z 0 (�O) 13 its Aew v rn n,C 'v vs e C� c. Net New Project Trip Generation Table: C��� ��`�^ �fis�'T (IUdp1 Land Use Daily (ADT) PM Peak -Hour Trips IN OUT Zo d. State assumptions and methodology for internal, link -diverted or passby trips: N/A Revises! on 6124110 E82 - Traffic Impact Analysis ff orksheet Poge 2 of 5 3. TRIP DISTRIBUTION Prepare and attach a graphic showing project trip distribution percentages and assignments. For developments that generate over 75 peak -hour trips, the City Engineer reserves the right to require trip distribution to be determined through use of the City traffic model. 1 N/A 4. SITE ACCESS ROADWAY/DRIVEWAYS AND SAFETY a. Have sight distance requirements at egress location been met per AASHTO requirements? b. Intersection Level of Service (LOS) Analysis.(N/A ) Intersections to be evaluated shall be determined by the City of Edmonds Ti-affic Engineer Existing Conditions LOS Delays Year of Opening LOS Delays Five Years Beyond Change of LOS Delays Land Use c. Describe channelization warrants: (Attach striping plan.) d. Vehicle Storage/Queuing Analysis (calculate 50% and 95 % queuing lengths)(VIA) 50 % 45 % Existing Conditions R Year of Opening Five Years Beyond Change of Land Use e. If appropriate, state traffic control warrants (e.g. stop sign warrants, signal warrants): N £ Summarize local accident history (only required for access to principal and minor arterials): ' Available upon request at City of Edmonds Development Services Department 2 Available upon request at City of Edmonds Police Department Revised on 6124110 E82 - Traffic Impact Analysis Morksheet Page 3 of 5 5. TRAFFIC VOLUMES Provide the following and other planned development traffic within the city.' a. Describe existing ADT and peak -hour counts (less than two years old), including turning movements, on street adjacent to and directly impacted by the project. NA b. Describe the estimated ADT and peak -hour counts, including turning movements, the year the project is fully open (with and without project traffic). IvIA- c. Describe the estimated ADT and peak -hour counts, including turning movements, five years after the project has been fully open (with and without project traffic). V IA- d. State annual background traffic growth factor and source: 6. LEVEL OF SERVICE (LOS) ANALYSIS a. Summarize Level of Service Analysis below and attach supporting LOS analysis documentation. Provide the following documentation for each arterial street or arterial intersection impacted by ten or more peak -hour trips. Other City -planned developments) must also be factored into the LOS calculations. n * LOS LOS Existing Conditions Existing Delays Year of Opening With Project Without Project Five Years Beyond Change of Land Use With Project Without Project b. Note any assumptions/variations to standard analysis default values and justifications: NIX ' A list of planned developments are available at the City upon request for public records Revised on 6124110 E82 - Traffic Impact Analysis ffforksheet Page 4 of 5 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. �° ❑ CHANGE IN USE(tv U Ch A'A e, I� v.,)f "r 1n j e (t't �o) ��� � �C sk Fee for prior use shall be based on fee LAtablished at the time the prior use was permitted. If the A.4.ys h previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. ITE Land Use Category I Per Unit Fee Rate New Use 1(600) (�O) WN $ 0 Prior Use ( zoJ (Eq) UC S $ Q Units in square feet, # of dwelling, of , etc. X 6 = $ X I WIEF Fee �. C/v 4 New Use Fee: $ - Prior Use Fee: $ _L 0.60 ' NPlvs < Gil L/5-e s o ho -)V-,f�, C (kY) rA C'f - Aes rCT"I (Y-'l MA ❑ NEW DEVELOPMENT Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, of ,etc. New Use $ I X NQ�❑ OTHER Fee MITIGATION FEE RECOMMENDATION: 0 INDEPENDENT FEE CALCULATION: $200.00 + consultant fee $ 0 TOTAL TRAFFIC IMPACT FEE $ 0. 0 0 City of Edmonds, Engineering Division Approval Date 1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. Revised on 6124110 E82 - Traffic ImpactAnalysis Worksheet Page 5 of 5