Prestige Traffice Reportoren�
• ft
City of Edmonds
Traffic Impact Analysis Worksheet - �s
low
Name of Proposed Project: 6Art'En C
Owner/Applicant
J►'� e Cam,
Name
7700 Alt Par%wtw Ve- Svc 3r�
Street/Mailing Address '
City State Zip
Telephone: (3 60) 7 3 .S _ 7155 e ��
Applicant Contact Person:
Carle#i Az�i�ech- Ps (Vom4 wi&s )
Name
116 E Ft i- St Svl � 4
Street/Mailing Address
Aaw,f- WA 9f273
City / State Zip
Telephone: 1*03y4 �-Ia4
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): NIA
Firm Name
Telephone:
THRESHOLD LEVELS OF ANALYSIS
Contact Name
E-mail:
Project Traffic Levels
Sections to Complete
I. Less than 25 peak -hour trips generated
1 and 7 only (Worksheet/Checklist)
II. More than 25 peak -hour trips generated
All sections
PROJECT DESCRIPTION
a. Location - Street address:?, 1003 701% Ai-C W E&yfit�S t YV j qro Z6
a vicinity map and site plan.)
b. Specify existing land use: E r n 2
Nj l lf4 1VUgI ni, ha l �w
" J /
c. Specify proposed type and size of development: %Ire.w IL 385 Sf , (S q) ,p0✓klilti 5L'Ilao) iw
. /Qlw iV"If\o cl6bi (# of residential units and/or square footage of building)
Revised on 6124110 E82 - Ti arc Impact Analysis Worksheet Page 1 of 5
d. Date construction will begin and be completed: 'Ecai � S�n�1 I ►n � l SWI't `td' ZU I�
e. Define proposed access locations: E-'Ti�h'nj C CCPSf /C/C40,1 i 1
£ Define proposed sight distance at site egress locations: vn obSl file 41�r.
2. TRIP GENERATION
Source shall be the Eighth Edition of the Institute of Transportation Engineers (ITE) Trip Generation
manual. For independent fee calculations, the current edition of the ITE manual may be used.
ADT = Average Daily Traffic
PM Peak -hour trips (AM, noon or school peak may also apply as directed by the City Engineer)
a. Existing Site Trip Generation Table: A w-C _�Kplr VnIVISCA
Land Use
Daily (ADT)
PM Peals -Hour Trips
IN
OUT
gq RCS
'RCS—(Alm
420
4-, 6e remv✓ oc
i n
(N,lrs I�mc
b. Proposed Project Trip Generation Table: Less 47,0n L' 13hil /J
Land Use
Daily (ADT)
PM Peak -Hour Trips
IN
OUT
Z 0
(�O) 13 its Aew
v rn n,C
'v vs e C�
c. Net New Project Trip Generation Table: C��� ��`�^ �fis�'T (IUdp1
Land Use
Daily (ADT)
PM Peak -Hour
Trips
IN
OUT
Zo
d. State assumptions and methodology for internal, link -diverted or passby trips: N/A
Revises! on 6124110 E82 - Traffic Impact Analysis ff orksheet Poge 2 of 5
3. TRIP DISTRIBUTION
Prepare and attach a graphic showing project trip distribution percentages and assignments. For
developments that generate over 75 peak -hour trips, the City Engineer reserves the right to require
trip distribution to be determined through use of the City traffic model. 1 N/A
4. SITE ACCESS ROADWAY/DRIVEWAYS AND SAFETY
a. Have sight distance requirements at egress location been met per AASHTO requirements?
b. Intersection Level of Service (LOS) Analysis.(N/A )
Intersections to be evaluated shall be determined by the City of Edmonds Ti-affic Engineer
Existing Conditions
LOS
Delays
Year of Opening
LOS
Delays
Five Years Beyond Change of
LOS
Delays
Land Use
c. Describe channelization warrants:
(Attach striping plan.)
d. Vehicle Storage/Queuing Analysis (calculate 50% and 95 % queuing lengths)(VIA)
50 %
45 %
Existing Conditions
R
Year of Opening
Five Years Beyond Change of
Land Use
e. If appropriate, state traffic control warrants (e.g. stop sign warrants, signal warrants):
N
£ Summarize local accident history (only required for access to principal and minor arterials):
' Available upon request at City of Edmonds Development Services Department
2 Available upon request at City of Edmonds Police Department
Revised on 6124110 E82 - Traffic Impact Analysis Morksheet Page 3 of 5
5. TRAFFIC VOLUMES
Provide the following and other planned development traffic within the city.'
a. Describe existing ADT and peak -hour counts (less than two years old), including turning
movements, on street adjacent to and directly impacted by the project.
NA
b. Describe the estimated ADT and peak -hour counts, including turning movements, the year the
project is fully open (with and without project traffic).
IvIA-
c. Describe the estimated ADT and peak -hour counts, including turning movements, five years
after the project has been fully open (with and without project traffic).
V IA-
d. State annual background traffic growth factor and source:
6. LEVEL OF SERVICE (LOS) ANALYSIS
a. Summarize Level of Service Analysis below and attach supporting LOS analysis documentation.
Provide the following documentation for each arterial street or arterial intersection impacted by
ten or more peak -hour trips. Other City -planned developments) must also be factored into the
LOS calculations. n *
LOS
LOS
Existing Conditions
Existing
Delays
Year of Opening
With Project
Without Project
Five Years Beyond Change of
Land Use
With Project
Without Project
b. Note any assumptions/variations to standard analysis default values and justifications:
NIX
' A list of planned developments are available at the City upon request for public records
Revised on 6124110 E82 - Traffic Impact Analysis ffforksheet Page 4 of 5
7. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts. Traffic
impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached)
and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations
in ECDC 18.82.130.
�°
❑ CHANGE IN USE(tv U Ch A'A e, I� v.,)f "r 1n j e (t't �o) ��� � �C sk
Fee for prior use shall be based on fee LAtablished at the time the prior use was permitted. If the A.4.ys h
previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04),
the 2004 ECDC 18.82.120 impact fee shall be used.
ITE Land Use Category I Per Unit
Fee Rate
New Use 1(600) (�O) WN $ 0
Prior Use ( zoJ (Eq) UC S $ Q
Units in
square feet,
# of dwelling,
of , etc.
X 6 = $
X
I
WIEF
Fee
�. C/v
4
New Use Fee: $ - Prior Use Fee: $ _L
0.60 '
NPlvs < Gil L/5-e s o ho -)V-,f�, C (kY) rA C'f - Aes rCT"I (Y-'l
MA ❑ NEW DEVELOPMENT
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
of ,etc.
New Use $ I X
NQ�❑ OTHER
Fee
MITIGATION FEE RECOMMENDATION:
0
INDEPENDENT FEE CALCULATION: $200.00 + consultant fee
$ 0
TOTAL TRAFFIC IMPACT FEE
$ 0. 0 0
City of Edmonds, Engineering Division Approval Date
1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
Revised on 6124110 E82 - Traffic ImpactAnalysis Worksheet Page 5 of 5