Loading...
Building PermitType: COMMERCIAL BLDG Subtype: NEW TENANT IMPROVEMENT I Status: ISSUED Parcel No: 00434212000102 Subdivision: 004342 Fire Sprinklers: No Valuation: $24,800.00 Code Edition: 2018 Site Address: 105 5TH AVE S EDMONDS,WA 98020-3148 Lot: 0 Lot Area: Occupancy Type: M No. Stories: 0 Zoning: Construction Type: VB # of Dwelling Units: 0 Scope of Work: CROW- NEW TENANT T/I (MINOR) NO CHANGE OF USE. WA State Contractor L & I #: BEAUCC1984KC Applied: 1/23/2024 Issued: 2/8/2024 Final: Expiration Date: 2/2/2025 Issued by: NED CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT RICHARD OKIMOTO 9924 225TH PLACE SW, (425)697-0983 RAOARCH@OUTLOOK.COM EDMONDS WA 98020-5924 105 5TH AVE W, EDMONDS WA BUSINESS CROW jen@edmondscrow.com 98020 CONTACT RICHARD A. OKIMOTO, 9924 225TH PLACE SW, (425)697-0983 raoarch@outlook.com ARCHITECT EDMONDS WA 98020-5924 CONTRACTOR BEAUCHAMP CONSTRUCTION 22575 25TH AVE W, BRIER WA (425)327-1126 JOELCHAMP@MSN.COM INC. 98036 THIRD AVENUE SOUTH 229 3RD AVE S STE 301, OWNER PROPERTIES LLC EDMONDS WA 98020 A FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# BLD - COM VALUE BASED FEE 001.000.345.83.000.00 $576.40 $576.40 2/8/24 R34797 BLD - COM VALUE BASED PLAN 001.000.345.83.000.00 $489.94 $489.94 1/26/24 R34432 REVIEW CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 1/26/24 R34432 PERMIT PARK IMPACT - COM ADMIN FEE 001.000.345.83.000.00 $120.00 $120.00 2/8/24 R34797 STATE BUILDING CODE SURCHARGE 001.000.237.150 $25.00 $25.00 2/8/24 R34797 -COM TOTALS: $1,256.34 $1,256.34 • � • CONDITION TYPE STATUS 71 NOTES Printed: Thursday, February 08, 2024 2:55:34 PM 1 of 2 •M MERCIAL BLDG Permit - City of • • • 98020 1 1 1 • . •. • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES X-1 FIRE FINAL X-3 BUILDING FINAL" B-4 FRAMING B-7 BUILDING OTHER INSP Printed: Thursday, February 08, 2024 2:55:34 PM 2 of 2