Loading...
structural steel welding report 7-14-23DAILY FIELD REPORT �r AAR TESTING AND INSPECTION, INC. 7126 180th Ave NE, Suite C101 Redmond, WA 98052 425-881-5812 Inspection Date 07/14/2023 Report Number BAV071423E CLIENT INFORMATION I PROJECT INFORMATION Contact Johnny Project No. 23-359 Company Eurocraft Hardwood Floors LLC Project Name Morts Residence Address 8522 216th St SE Address 1034 B Avenue S City Woodinville City Edmonds Contractor Eurocraft Permit No. BLD2022-1670 INSPECTION TYPE(S) I STRUCTURE(S) / LOCATION(S) Structural Steel Welding Moment Frame - Grid 2-3 Weather Temperature (OF) Start Time End Time Clear 73 12:00 PM 01:00 PM DRAWINGS / DOCUMENTS REFERENCED Stephan Tapp Architect/P.E. approved drawings/S-4.0. AWS D1.1. INSPECTION OBSERVATION / REMARKS 1. I inspected the two HSS 5x5xl/2 columns welded to the HSS8x4x.625 and HSS8x6x.625 beams to be according to the referenced detail. 2. All welds are visually acceptable according to AWS D1.1 profiles. 3. The upper beam to columns require an ultrasonic test (UT) to follow. Items inspected are in conformance with approved plans, specifications, and jurisdictional requirements Inspectors Name Report Date Reviewers Signature Reviewed By Reviewed Date Inspectors Signature Brian Valukonis 07/14/2023 Teajalam (TJ) Gounden DAILY FIELD REPORT AAR TESTING AND INSPECTION, INC. 7126 180th Ave NE, Suite C101 Redmond, WA 98052 425-881-5812 Inspection Date 07/14/2023 Report Number BAV071423E The column to beam welded connection. The column to beam welded connection. Inspectors Name Report Date Inspectors Signature Brian Valukonis 07/14/2023 ns i` Reviewers Signature Reviewed By Reviewed Date Teajalam (TJ) Gounden