2023-12-12 - Lee Residence (Janetta) - GEO459053OTTO ROSENAU & ASSOCIATES, INC. Geotechnical Engineering, Construction Inspection & Materials Testing GEOTECHNICAL INSPECTION REPORT Report Number: 459053 Description: Grip-Tite Push Piers Project: Lee Residence (Janetta) Permit Number: BLD2023-0794 Address: 9309 236th St SW, Edmonds Job Number: 23-0831 Client: Robbins & Co. Client Address: 818 SW 142nd Street, Burien Inspector and Date Remarks Scott Hoobler, PE Arrived onsite as requested to observe the installation of 3-inch diameter, hydraulically driven, Grip- 12/12/2023 Tite piers driven into the subgrade using SPX Power Team hydraulic cylinder jack by Robbins and Co for along the southwestern portion of the residence. The successfully installed piers were installed into a suitable bearing stratum using the following criteria specified by the project structural engineer. • When an applied force equal to 40,000 pounds is achieved, or • When an approximate lift of inch of the structure was observed. The piers were installed in 3-foot sections. Additional pier sections were added using slip joint connections. Listed below are the pier locations (see the attached figure), the final installation depth, depth to bottom of the footing (measured from ground surface), design load of each pier, and the final installation load. The final installation depth is measured from the bottom of the Grip-Tite bracket. Grip-Tite Final Depth to Design Final Pier Installation Bottom of Load Installation Notes Location Depth (feet- Footing (Pounds) Load inches) (inches) (Pounds) 1 3'-4" 24 6,180 19,240 1/2-inch lift of foundation 2 3'-4" 17 3,600 14,430 1/2-inch lift of foundation 3 3'-8" 17 3,520 24,050 1/4-inch lift of foundation 4 4' 16 3,520 24,050 1/2-inch lift of foundation 5 4' 15 3.520 24,050 1/2-inch lift of foundation 6 3' 15 3,520 25,974 1/2-inch lift of foundation 7 2'-10" 22 4,500 19,240 1/4-inch lift of foundation 8 2'-10" 18 4,050 24,050 1/2-inch lift of foundation Copies to: Date: 2023.12.14 X Client X Contractor Anthony Coyne, P.E. 16:24:20-08'00' Architect X Building Dept. Technical Responsibility: X Engineer Anthony Coyne, P.E., Senior Engineer This report applies only to the items tested or reported and is the exclusive property of Otto Rosenau & Associates, Inc. Reproduction of this report, except in full, without written permission from our firm is strictly prohibited. Page 1 of 3 6747 M.L. King Way S., Seattle, Washington 98118 - Phone (206) 725-4600 - Fax (206) 723-2221 Form No.: ADMIN-100-01 (Rev 01105) OTTO ROSENAU & ASSOCIATES, INC. Geotechnical Engineering, Construction Inspection & Materials Testing Job Name: Lee Residence (Janetta) Job No.: 23-0831 Report No.: 459053 A pier load testing was performed on each of the installed piers as described in Note 12 of the city - approved project plan prepared by Hayman Engineering. The hydraulic pressure and equivalent installation pressure was recorded at 18" intervals and the final installation depth as the pier was installed. The applied load was fully removed following the completion of each pier load test. Pier #/ Pier Pipe Depth Below Bottom of Footing Installation Pressure (psi)/ Installation Force (lbs.) 1 / 18" 0 psi / 0 lbs. 1 / 36" 600 psi / 5,772 lbs. 1 / 40" 2,000 psi / 19,240 lbs. 2 / 18" 500 psi / 4,810 lbs. 2 / 36" 500 psi / 4,810 lbs. 2 / 40" 1500 psi / 14,430 lbs. 3 / 18" 0 psi / 0 lbs. 3 / 36" 500 psi / 4,810 lbs. 3 / 44" 2,500 psi / 24,050 lbs. 4 / 18" 0 psi / 0 lbs. 4 / 36" 500 psi / 4,810 lbs. 4 / 48" 2,500 psi / 24,050 lbs. 5 / 18" 0 psi / 0 lbs. 5 / 36" 200 psi / 1,924 lbs. 5 / 48" 2,500 psi / 24,050 lbs. 6 / 18" 1,800 psi / 17,316 lbs. 6 / 36" 2,700 psi / 25,974 lbs. 7 / 18" 0 psi / 0 lbs. 7 / 32" 2,000 psi / 19,240 lbs. 8 / 18" 0 psi / 0 lbs. 8 / 34" 2.000 psi / 19,240 lbs. An L-shaped Grip-Tite bracket was used to transfer load from the Grip-Tite pier to the existing concrete foundation, except for pier location #2. At this location, a flat plate bracket had to be used due to a support for the gas line being located at the same location as where Pier #2 was to be located. The bracket was attached to the concrete foundation wall with a total of ten (10), DeWalt screw -bolts (5 inches in length and 5/8 inches diameter) were installed into the concrete foundation wall to hold the bracket in -place. Approval is required from the project engineer for the use of the flat bracket at Pier Location #2 instead of the L-shaped bracket that is specified in the City approved project plans. Page 2 of 3 OTTO ROSENAU & ASSOCIATES, INC. Geotechnical Engineering, Construction Inspection & Materials Testing Job Name: Lee Residence (Janetta) Job No.: 23-0831 Report No.: 459053 TYPICAL PIER SECTION ❑ Grip-Tite Piers Installed Today Page 3 of