Loading...
APPROVED PLN RESUB1 BLD2022-1385+Site_Plan+10.27.2022_10.28.58_AM+3188632GENERAL NOTES 1. THE FOLLOWING NOTES REFER TO NEW CONSTRUCTION WORK TO BE PERFORMED UNDER PERMIT FROM THE LOCAL JURISDICTION AS DESCRIBED ON THE ATTACHED "CONSTRUCTION SET" DRAWINGS AND SPECIFICATIONS. 2. CONTRACTOR SHALL FIELD VERIFY ALL CRITICAL DIMENSIONS AND SITE CONDITIONS INCLUDING LOCATION AND DISPOSITION OF EXISTING UTILITIES BEFORE COMMENCING WORK AND BE RESPONSIBLE FOR SAME. NOTIFY DESIGNER OF ANY DISCREPANCIES AND DO NOT PROCEED WITH ANY RELATED WORK UNTIL DISCREPANCY HAS BEEN REMOVED. 3. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES. WHERE CONFLICTS OCCUR BETWEEN METHODS OR STANDARDS OF INSTALLATION AND CODES, OR IF MATERIALS DO NOT EQUAL OR EXCEED THE REQUIREMENTS OF LAWS OR ORDINANCES, THE LAWS OR ORDINANCES SHALL GOVERN. NOTIFY DESIGNER OF ANY CONFLICTS. 4. DO NOT SCALE THE DRAWINGS. THE CONTRACTOR(S) SHALL USE ACTUAL FIELD DIMENSIONS OR DIMENSIONS SHOWN ON THE DRAWINGS. NOTIFY THE DESIGNER OF ANY DISCREPANCIES AND DO NOT PROCEED WITH ANY RELATED WORK UNTIL DISCREPANCY HAS BEEN RESOLVED. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUTIONS AND THE METHODS AND SEQUENCE OF CONSTRUCTION REQUIRED TO PERFORM THE WORK. 6. SUB -CONTRACTORS SHALL VERIFY ROUGH -IN DIMENSIONS, REQUIREMENTS FOR BACKING AND LOCATIONS OF ITEMS IN PARTITIONS AS REQUIRED FOR INSTALLATION OF THEIR WORK. EACH INSTALLER SHALL BE RESPONSIBLE FOR VERIFICATION AND COORDINATION WITH OTHER INSTALLERS TO SECURE COMPLIANCE WITH THE CONTRACT DRAWINGS AND RELATED SPECIFICATIONS. GENERAL CONTRACTOR SHALL COORDINATE INSTALLATION OF EQUIPMENT, PLUMBING FIXTURES AND APPLIANCES INCLUDED IN THIS CONTRACT OR FURNISHED BY OTHERS FOR INSTALLATION BY CONTRACTOR. 7. PRIOR TO SHOP FABRICATION OF MATERIALS OR EQUIPMENT OR ORDERING OF MANUFACTURED ITEMS, RESPECTIVE SUB -CONTRACTOR OR SUPPLIER SHALL PROVIDE SHOP DRAWINGS OR MANUFACTURER'S DATA FOR REVIEW BY OWNER AND DESIGNER. 8. ANY ALTERATIONS TO STRUCTURAL ELEMENTS OR BUILDING SHELL DESIGN SHALL NOT BE DONE WITHOUT PRIOR AUTHORIZATION FROM DESIGNER. ALL CONTRACTOR INITIATED CHANGES SHALL BE SUBMITTED TO DESIGNER IN WRITING FOR APPROVAL. 9. DEMOLITION CONTRACTOR IS RESPONSIBLE FOR LICENSED TESTING AND, IF REQUIRED, ABATEMENT OF ANY HAZARDOUS MATERIALS DISTURBED DURING SITE CLEARING AND PREPARATION. 10. SOIL CONDITIONS DISCOVERED DURING EXCAVATION WHICH APPEAR INCONSISTENT WITH THE ALLOWABLE SOIL BEARING PRESSURE ASSUMED SHALL BE REPORTED TO THE DESIGNER. THE ACTUAL ELEVATIONS OF THE FOOTINGS WILL BE ESTABLISHED BY THE CONTRACTOR AND MUST BEAR ON SOLID UNDISTURBED EARTH OR CONTROLLED AND COMPACTED STRUCTURAL FILL. SEE STRUCTURAL NOTES FOR ADDITIONAL REQUIREMENTS. 11. CONTRACTOR SHALL PROVIDE ALL TEMPORARY SUPPORTS AND BRACING AS REQUIRED. INSTALL TEMPORARY BARRIERS AS NECESSARY TO PROTECT ADJACENT STREET RIGHT-OF-WAY AND NEIGHBORING PROPERTIES. CONTRACTOR SHALL BE RESPONSIBLE FOR STRENGTH AND SUITABILITY OF TEMPORARY BARRIERS AND SUPPORTS PER CITY AND COUNTY STANDARDS. ALL TEMPORARY WORK SHALL BE REMOVED AT THE END OF EACH SEQUENCE OR AT COMPLETION OF THE CONTRACT WORK. 12. MECHANICAL AND ELECTRICAL TO BE BIDDER -DESIGN UNDER SEPARATE PERMIT. CONTRACTOR SHALL SUBMIT PLANS TO DESIGNER FOR REVIEW PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY SIZES AND LOCATIONS OF ALL OPENINGS FOR MECHANICAL WORK AND OBTAIN SHOP DRAWINGS FOR REVIEW BY DESIGNER BEFORE PROCEEDING WITH THE WORK. 13. PROTECT ALL NON -COMPATIBLE MATERIALS FROM GALVANIC ACTION. 14. REPETITIOUS DETAILS MAY BE CALLED OUT RARELY ON THE DRAWINGS BUT SHALL BE PROVIDED AT ALL LOCATIONS WHERE THEY OCCUR. 15. ALL WORKMANSHIP SHALL BE OF THE HIGHEST QUALITY AND IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS, INSTALLATION INSTRUCTIONS AND RECOMMENDATIONS FOR USE. WORKMANSHIP QUALITY SHALL BE JUDGED ACCORDING TO THE BEST ACCEPTED STANDARDS OF THE BUILDING INDUSTRY. CONTRACTOR SHALL CORRECT ALL DEFECTIVE WORK TO SATISFACTION OF OWNER AT CONTRACTOR'S EXPENSE AND IN A TIMELY MANNER. A PUNCH LIST WILL BE ISSUED AT COMPLETION OF PROJECT. NOTIFY DESIGNER AT SUBSTANTIAL COMPLETION. 16. ALL MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM DATE OF ACCEPTANCE OF COMPLETED PROJECT BY OWNER. ROOFING, WATERPROOFING, FLASHINGS AND ALL OTHER WORK WHICH IS A COMPONENT PART OF THE ROOFING IS TO BE WEATHERTIGHT UNDER ORDINARY WEAR AND USAGE FOR A PERIOD OF TWO YEARS FROM DATE OF ACCEPTANCE, TO BE SUPPLEMENTED BY THE TERMS AND CONDITIONS OF EXTENDED MANUFACTURER'S WARRANTIES. AT TIME OF ACCEPTANCE OF COMPLETED PROJECT, CONTRACTOR SHALL FURNISH OWNER WITH ALL NECESSARY MANUALS OF OPERATION AND MAINTENANCE, WARRANTIES AND GUARANTEES FOR ALL EQUIPMENT INCLUDED IN THIS CONTRACT. 17. ANY METAL IN CONTACT WITH TREATED WOOD MUST BE VERIFIED FOR THAT USE OR ISOLATED FROM DIRECT CONTACT. i............................................. REVIEWED BY CITY OF EDMONDS BUILDING DEPARTMENT ENGINEERING DIVISION APPROVED. W�aAt 10/28/2022 BUILDING CODE INFORMATION PROJECT DESCRIPTION DEMO EXISTING DECK AND BUILD NEW PARCEL NO. 00724700000100 JURISDICTION CITY OF EDMONDS APPLICABLE CODES 2018 INTERNATIONAL RESIDENTIAL CODE W/ STATEWIDE AMENDMENTS CITY OF EDMONDS MUNICIPAL CODE CONSTRUCTION TYPE V-B OCCUPANCY R-3 FMIX6•C NAME EXISTING DEMO NEW TOTAL BASEMENT 2324 S.F. 2324 S.F. FIRST FLOOR 2324 S.F. 2324 S.F. TOTAL CONDITIONED 4648 S.F. 4648 S.F. GARAGE 256 S.F. 256 S.F. DECK 448 S.F. 560 S.F. 560 S.F. RS-12 Y Zone Corner Flag Setbacks: Required Actual 25' N/E 26'/5s' Front Sides 10' S/w Rear — — Other — 25' 25' Height OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. ALL DISTURBED SOILS SHALL BE COMPOST AMENDED PER CITY OF EDMONDS STANDARD DETAIL SD-642 OR APPROVED EQUAL. APPROVED BY PLANNING ;mow _ Oct 28 2022 DEMO EXT'G. DECK COMPLI PROVIDE SILT AROUND PRO AREA DURING CONSTRUCTI( EROSION COS 144 IV Z50 L'+ Z)v r= A side sewer permit is required to move/replace/install pipe and/or clean outs. %W-. . ZONING INFORMATION ZONING LEGAL DESCRIPTION RS-12 EDMONDS VIEW ESTATES BILK 000 LOT 1 0.18 ACRES (APPROX. 7840 S.F.) 25 FT FRONT 25 FT SIDE 10 FT LOT COVERAGE ALLOWED LOT COVERAGE GROSS LOT AREA (.30 ACRES EXT'G. HOUSE & GARAGE NEW DECK EXT'G. SHED TOTAL LOT COVERAGE % OF LOT COVERAGE 146 148 35 % DRAWING INDEX 0 A1.1 PROJECT INFORMATION / SITE PLAN A2.1 NEW DECK FOUNDATION / UPPER DECK PLAN / ELEVATIONS S1.0 GENERAL STRUCTURAL NOTES S2.0 FOUNDATION PLAN S2.1 DECK FRAMING PLAN S3.0 STRUCTURAL DETAILS CONTACT INFORMATION OWNER / PROPERTY ADDRESS KAREN & NICHOLAS COOPER 1125 OLYMPIC AVE EDMONDS, WA 98020 EMAIL: KACCOOP@COMCAST. NET 13068 SF DESIGNER AARON DUPONT 28809 40TH AVE S 2580 SF AUBURN, WA 98001 560 SF 206-348-4483 EMAIL: AKD.ARCHDESIGN@GMAIL.COM 72 SF 3212 SF 3212 / 13068 = 24.6 % VIEWLAND WAY 1 ?. nn STRUCTURAL ENGINEER IV - VV yWbt J SITE PLAN 1=10 N ALLEY 0 5 10 20 HARRIOTT VALENTINE ENGINEERS INC 1932 FIRST AVE, STE 720 SEATTLE, WA 98101 154 206-413-6671 EMAIL: TFISHER@HARRIOTTVA ENTINE.COM N N Lsi 0 w rn �n o CD Residential Designer 206.348.4483 akd.archdesign@gmail.com COOPER RESIDENCE NEW DECK 1 125 OLYMPIC AVE EDMONDS, WA 98020 Revision 1 REVISION 10/26/2022 BLD2022-1385 RESUB Oct 27 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PROJECT INFORMATION / SITE PLAN ❑ Preliminary Design ❑ Progress Set ❑ Pricing Set ■ Permit Set ❑ Construction Set Date: 9/26/2022 Design: AD Scale: AS NOTED Sheet No. Al 1 ■