Loading...
APPROVED REVISED SHEETS BLD2021-0520+Stair_Lower_Plan+1.24.2022_1.22.11_PM+2637462v Q O ^L LL O LID O CD N X Q O L LL Q O ^L LL I CD I` LO CD N X L a) Q Q I LL L LL X W CD r— Lf ) CD r O N X d Y d d Y z Q J n OI Ln O r O N X C E O U U 7 'L^ VJ Q O ^L LL I CD Ln CD r 0 N X C O E N U cu m I C N t6 a L L L cu LL E x W Lo (o O Ln O Q � U o N E X - E 00 L" E a o CT a) N Q O o N L Q � I O o L r— Q Lo Q O r m ca N -0 X O � g z C/) m J Y d ry I r-) Q z i Q 4 J i d Q of LO O LO o Lf) r O r O N N X E — M L LL O J .§ C I cu oa QI LL z X U wl w LLO 0 0 r N O m X U — (D = U ry al �r-) o LO — O U o Y � m C z I O o0 LID r) O W C/) o N U X O E ry c Y ii L ) (>3 � X PROPOSED ST LOWER PLAN bhp. CONSULTANTS BHC Consultants, LLC 206.505.3400 ISSUED FOR PERMIT 04-2021 MM BS 1601 Fifth Avenue, Suite 500 206.505.3406 (fax) No. Revision Date By App'd Seattle, Washington 98101 www.bhcconsultants.com 1/4"= 1'-0" KPG Designed: Scale: Interdisciplinary Design 1/4" = 1'-0" SEATTLE Tacoma 3131 EiiiottAve Wenatchee Drawn: One Inch At Full Scale Checked: Suite 400 WA 98121 Bellevue (206) 286 1640 www.kpg.com If Not One Inch Scale Accordingly AMERE CO Green •Clean *Sustainable ° EDMONDS WWTP CARBON RECOVERY SOLIDS PROCESSING BUILDING ENLARGED PLAN BASEMENT NOTES: 1. SEE SHEET A-10 FOR CONSTRUCTION ACCESS DETAIL, 2. SEE SHEET A-9 FOR LADDER DETAIL. ■ Revised sheet Approved By L. Bjorback 1 /28/2022 ■ City of Edmonds ■ ■ Building Division Call 48 Hours Before You Dig 1-800-424-5555 UNDERGROUND SERVICE 9813 AMMR FOR REVISION REGISTERED STEEP STAIRS - Jan 24 2022 RESUB 1 CITY OFEDMONDS DEVELOPMENT SERVICES 9ENNIS W. , JR DEPARTMENT IE OF WASHIN&0114 Drawing: A-4 Sheet: 33 of 114 File: Date: April2021 L Q I 0 L LL X w I CD r— M CD O N X a c N a� L U C0 0- 0 0- CD I Ln 0 0 N X Q O L C7 C d L co LL F: Q L CU Q Ea CD �LO o o Q o U N X E CU E O of U LP U o C7 0 0 N - n 0 0l �r-- Q LID i? o CU N X O Q z � J �I a -co ryry d ry LL C? X Ln w l CD Q r` LO CD 0 �o o N X CU0- a C CU o = QI ZQ Z J CD a l � o w LO 0I N � m X U — N = U w ry al o Ln — o o Y � Ib C z f o o r1- LID p o w C/) o N U X LU O E ry c Y ii L ) (>3 (3) X 1 L1 I NEW FLOOR I OPENING I NEW FILTER EQUIPMENT (ACF CLOUD. ALT. BID #2) TUNNEL ROOF BELOW NEW q—g STAIR #5 EX SHOP FLOOR FF +19.81' 7 —1 PROPOSED STEEP ST-Ardlv-UPPER PLANi REMOVE EXISTING DOOR AND ENLARGE OPENING PER STRUCTURAL. AFTER EQUIPMENT INSTALLATION, INFILL OPENING WITH METAL STUDS AND METAL SIDING PER 7\A-11 NEW STAIR #4 40'-0" EXISTING - VERIFY SOLIDS PROCESSING BUILDING ENLARGED UPPER FLOOR PLAN (a@ +18.31') 3/16"= 1'-0" bhp. CONSULTANTS BHC Consultants, LLC 206.505.3400 ISSUED FOR PERMIT 04-2021 MM BS 1601 Fifth Avenue, Suite 500 206.505.3406 (fax) No. Revision Date By App'd Seattle, Washington 98101 www.bhcconsultants.com i i i D3 A-8 NEW STAIR #3 EX SHOP FLOOR FF +19.81' Lil A-5 KPG Designed: Scale: Interdisciplinary Design 1/4" = 1'-0" SEATTLE Tacoma 3131 EiiiottAve Wenatchee Drawn: One Inch At Full Scale Checked: Suite 400 WA 98121 Bellevue (206) 286 1640 www.kpg.com If Not One Inch Scale Accordingly ALTERNATE BID ITEMS ADD ALTERNATE #1: NEW OPENINGS AND DOORS AT HEADWORKS BUILDING: D01 AND D02 ADD ALTERNATE #2: ALL WORK RELATED TO THE ACF CLOUD INCLUDING ENCLOSING THE ENDS OF THE ACF. ADD ALTERNATE #5: REPLACE THE ROLLUP DOOR IN THE SOLIDS DISPOSAL ROOM ADD ALTERNATE #10: ARCHITECTURAL SCREEN ON TOP OF OUTSIDE WALL SOLIDS PROCESSING BUILDING ROOF DETAIL (a@ +XX.XXV) 1/1"= 1'-0" AMERE CO Green •Clean *Sustainable ° NOTES: 1. SEE SHEET A-8 FOR STAIR DETAILS. 2. SEE SHEET A-9 FOR LADDER DETAIL. 3. SEE SHEET A-10 FOR CONSTRUCTION ACCESS DETAILS. P! ■ Revised sheet Approved By L. Bjorback 1 /28/2022 ■ City of Edmonds Building Division REVISION Jan 24 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT EDMONDS WWTP CARBON RECOVERY SOLIDS PROCESSING BUILDING PLAN CONC INFILL Call 48 Hours Before You Dig 1-800-424-5555 UNDERGROUND SERVICE 9813 REGISTERED R T 01 ENNIS W. JR STATE OF WASHINGT Drawing: A-5 Sheet: 34 of 114 File: Date: April2021 1 R'_IR" 19'-n" SCALE: 1/4" = 1'-0" A-7 PROPOSED STEEP STAIR SECTION Droved 18/2022 City of Edmonds ■ Building Division I._._■_■_._■_._� REVISION Jan 24 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Call 48 Hours Before You Dig 1-800-424-5555 UNDERGROUND SERVICE 9813 REGISTERED 01 AR T ENNIS W. J STATE OF WASHINGT Scale: EDMONDS WWTP CARBON RECOVERY Drawing: A-7 KpG Designed: DESIGNED bh&1/4"-1'-0" Interdisciplinary Design Sheet: 36 of 114 c/ SOLIDS PROCESSING BUILDING SECTION CONSULTANTS SEATTLE Tacoma Drawn: DRAWN 3131 Elliott Ave Wenatchee One Inch At Full Scale AMERESCO BHC Consultants, LLC 206.505.3400 suaeaoowa,ss1z1 Bellevue R File: ISSUED FOR PERMIT 04-2021 MM BS 1601 Fifth Avenue, Suite 500 206.505.3406) (206)2861640 www. kpg.com .kpg.com fax Checked: CHECKED ScaleAccordin If Not One Inch Green* Clean *Sustainable I No. Revision Date By App'd Seattle, Washington 98101 www.bhcconsultants.com Accordingly Date: April 2021 EX WALLS & DOOR No. bhp. KPG Interdisciplinary Design CONSULTANTS SEATTLE Tacoma 3131 Elliott Ave Wenatchee ISSUED FOR PERMIT 04-2021 MM gS BHC Consultants, LLC 206.505.3400 Suite 400 WA 98121 Bellevue 1601 Fifth Avenue, Suite 500 206.505.3406 (fax) (206) 286 1640 www.kpg.com Revision Date By App'd Seattle, Washington 98101 www.bhcconsultants.com NEW DOC AND FRA • 4f All AInhA STAIR #4 PLAN SCALE: 1/2" = 1'-0" IFCWB'd STAIR #3 PLAN SCALE: 1/2" = 1'-0" %I 11 "=1'-10" =X WALL iANDRAIL AT 34"-38" AFF 31UARDRAIL AT 42" AFF 3UARDRAIL RETURN -O FLOOR, TYP Scale: Designed: DESIGNED SCALE-HORIZ Drawn: DRAWN One Inch At Full Scale AMERE CO IfNot One Checked: CHECKED Scale Accordingly Green • Clean * Sustainable 2 TREADS @ 01 Al, AIf'lr%A 1'-"1" PLAN SCALE: 1/2" = 1'-0" ised sheet Approved -. Bjorback 1 /28/2022 ■ of Edmonds ding Division MMEMEMEM REVISION Jan 24 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT EDMONDS WWTP CARBON RECOVERY ENLARGED STAIR PLANS :ANDFRAME GUARDRAIL AT 42" AFF I HANDRAIL AT 34"-38" Ad IARDRAIL RETURN FLOOR DRAIL RETU LOOR Call 48 Hours Before You Dig 1-800-424-5555 UNDERGROUND SERVICE 9813 REGISTERED ARCHITECT DENNIS W. DEAN, JR. STATE OF WASHINGTON Drawing: A-8 Sheet: 37 of 114 File: Date: April2021 c� E L r) U E c� N 0 0 0 N 0 N c9 0 L ^0 rLL^ VJ J C) O al O LO O N E m C H L r - I C/) Q � Z U o w Lo 0 o I N O m X U - N = U w ry d al m p LO — O O o a cti Y � 00 m Z I O o0 Lo p o w C/) o X U X w 6 O E ry m w � a� Y jl ^� L n X