Building Permit 2021Type: COMMERCIAL BLDG Subtype: COM ALTERATION OR REPAIR I Status: ISSUED
Parcel No: 27032300409100 Site Address: 200 2ND AVE 5 EDMONDS,WA 98020
Subdivision: 006810, 010871, 006464, 005304, 006605, 010338 Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $869,000.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: WWTP - NEW CARBON RECOVERY SYSTEM
Applied: 4/12/2021
Issued:10/18/2021
Final:
Expiration Date: 10/13/2022
Issued by: JOK
WA State Contractor L & I #: GENERM*306QF City of Edmonds Business License #: 602454996-001-0001 1
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
MARCUS EIDAL
222 WILLIAMS AVE SOUTH 100,
(206)200-5211
MEIDAL@AMERESCO.COM
RENTON WA 98057
CONTACT
AMERESCO
222 WILLIAMS AVE SOUTH 100,
(206)200-5211
meidal@ameresco.com
RENTON WA 98057
2316 S STATE ST, TACOMA WA
NMUNCH@GENERALMECHANICAL.CO
CONTRACTOR
GENERAL MECHANICAL
(253)606-5291
98405
M
121 5TH AVE N, EDMONDS WA
OWNER
EDMONDS CITY OF
98020
DESCRIPTION
7PER
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
5/20/21
R12453
PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
10/18/21
R15336
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$220.00
$220.00
10/18/21
R15336
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$6,394.00
$6,394.00
10/18/21
R15336
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$5,434.90
$5,434.90
5/20/21
R12453
TOTALS: $12,113.90
$12,113.90
CONDITION TYPE
STATUS
NOTES
Printed: Monday, October 18, 2021 9:54:02 AM 1 of 3
COMMERCIAL Permit
City of • • • PERMIT NUM
Edmonds 1 1
• • • • 1 1
&,
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
Prior to final inspection the temporary portion of the LOADING DOCK must be removed
DEMOLITION REQUIREMENTS
PRIOR TO FINAL
(that portion extending into the adjoining ROW.) See Site Plan sheet M-1-LAI.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
EXIT SIGNAGE AND EMERGENCY
FOR
Final locations of illuminated exit signs and emergency lighting subject to field inspection
LIGHTING
INFORMATION
by the Fire Marshal.
The wetland enhancement plan and planting plan approved with PLN2021-0028 must be
PLANNING CONDITION
PRIOR TO FINAL
implement prior to final.
SPECIAL INSPECTIONS REQUIRED:
SOILS (INCLUDING TEMPORARY SHORING, AND SUBGRADE PREP FOR SLABS AND
REQUIRED SPECIAL
FOR
FOUNDATION)
INSPECTIONS
INFORMATION
STRUCTURAL: STRUCTURAL OBSERVATION, STRUCTURAL STEEL/WELDING/HS BOLTING,
CONCRETE, FABRICATION, FIBERGLASS FRAMING
FOR
Separate Permit Required For:
INFORMATION
SEPARATE PERMIT REQUIRED
FOR
HVAC; Plumbing; L&I Electrical; L&I Boiler (for Air Compressors); Loading Dock
INFORMATION
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
INSPECTIONS - Schedule Online
at: https://Inspection.MyBuildingPermit.com
COMPLETED
SEQID INSPECTION TYPE INSPECTOR
RESULT NOTES
DATE
A-1 BUILDING PRECON
B-2 FOOTINGS
B-2 FOUNDATION WALL
B-2 SHORING
B-3 ELEVATED FLR SLAB
Printed: Monday, October 18, 2021 9:54:02 AM 2 of 3
COMMERCIAL BLDG Permit
City of Edmonds
Edmonds WA 98020 i , ' ' '
www.edmondswa.gov425.771.0220
�f�c. L890
B-4 FRAMING
B-5 BLDG SPECIAL
INSPECTION
B-5 CROSS CONNECTION
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
X-1 FIRE FINAL
A-1 TESC AND MOBILIZE
X-2 ENGINEERING FINAL
X-1 PLANNING FINAL
Printed: Monday, October 18, 2021 9:54:02 AM 3 of 3