Loading...
APPROVED ENG RESUB1 BLD2023-0750+TRANS IMPACT+8.2.2023_5.09.46_PM+3704269RESUB BLD2023-0750 APPENDIX A Aug 03 2023 Page 1 of 2 CITY OF EDMONDS EVELOPMENT SERVICES DEPARTMEN Transportation Impact Analysis Worksheet PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: Nova Family Resource & Childcare Center Owner/Applicant Carole Harper Name 21010 76th Avenue West Street/Mailing Address Edmonds WA 98026 City Telephone: 425-214-2493 Applicant Contact Person: dwudesign (David Wu) Name 14632 14th Avenue SE Street/Mailing Address Mill Creek WA 98012 State zip City State zip Telephone: 425-512-1780 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): N/A Firm Name Telephone: 1. PROJECT DESCRIPTION Contact Name E-mail: a. Location - Street address: 21010 76th Avenue West, Edmond, WA 98026 Attach a vicinity map and site plan.) b. Specify existing land use: c. Specify proposed type and size of development: Interior remodel only, no new footprint (# of residential units andlor square footage of building) d. Date construction will begin and be completed:As soon as permit approved, 1 month remodel e. Define proposed access locations: Same as existing, 76th Avenue West access f. Define proposed sight distance at site egress locations: Same as existing egress location HANDOUT UPDATED 05.09.2023 APPENDIX A Page 2 of 2 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC 3.36.130. Check the applicable box below and calculate the fees as necessary: ❑ NO CHANGE ® CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 impact fee rate shall be used. Units in ITE Land Use Category Per Unit Fee square feet, Rate # of dwelling, x x v , etc. New Use 565-Daycare center $ 34.29 721 sf Prior Use 710-General Office $ 1.81 721 sf Use Fee New Use Fee: $ 24,723.09 - Prior Use Fee: $ 1,305.01 = FEE DUE: $23,418.09 ❑ NEW DEVELOPMENT ITE Land Use Category Per Unit FeeRate New Use $ ® INDEPENDENT FEE CALCULATION X Units in square feet, # of dwelling, vfb. etc. FEE DUE This facility is for low income foster child, request reduction of 80%, Fee Due only 20%. FEE DUE Impact/Mitigation Fee: $ 4,683.62 Independent Review Fee: $296.00 (+ peer review fee) $ 4,979.62 ENGINEERING DIVISION APPROVED AS NOTED JdJ 1#94 ,t"u 08/18/2023 VV City of Edmonds, Engineering Division Approval Date 1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 05.09.2023