Loading...
APPROVED BLD BLD2021-0592+Structural_Plan+4.26.2021_12.49.33_PM+2164091GENERAL STRUCTURAL NOTES GENERAL ALL CONSTRUCTION SHALL CONFORM TO THE INTERNATIONAL BUILDING CODE (IBC), 2018 EDITION, OR OTHER GOVERNING CODE, AS REQUIRED BY LOCAL JURISDICTION. DESIGN PARAMATE WIND: NOMINAL WIND SPEED — 85 MPH RISK CATEGORY II ULTIMATE WIND SPEED — 110 MPH IMPORTANCE, 1 = 1.0 WIND EXPOSURE, B KIT = 1.00 SEISIMIC: EQUIVALENT LATERAL FORCE PROCEDURE IMPORTANCE, le = 1.0 SS = 1.281 SITE CLASS, D S, = 0.449 SEISMIC DESIGN CAT., D SDI = 1.03 SEIS. FORCE RES. SYS, A.15. So, = NA DESIGN BASE SHEAR = 12597 Ibs Cs = 0.13 RISK CATEGORY II R = 6.5 LIVE LOADS: ROOF 25 PSF (SNOW) FLOOR 40 PSF DECKS 60 PSF INSPECTIONS NO SPECIAL INSPECTIONS ARE REQUIRED. NOTIFY BUILDING DEPARTMENT FOR INSPECTIONS REQUIRED BY LOCAL JURISDICTION. SOILS REPORT NOT PROVIDED. FOUNDATIONS EXTEND FOOTING TO UNDISTURBED SOIL OF 2500 PSF BEARING CAPACITY. BOTTOM OF EXTERIOR FOOTING SHALL BE V-6" MINIMUM BELOW OUTSIDE FINISHED GRADE. COMPACTED FILL SHOULD CONSIST OF PREDOMINATELY WELL -GRADED, GRANULAR SOIL, FREE OF ORGANIC MATERIAL AND DEBRIS. FILL SHOULD BE PLACED IN MAXIMUM 8" LOOSE LIFTS AND COMPACTED TO A MINIMUM OF 95 PERCENT OF THE MAXIMUM DENSITY AT OPTIMUM MOISTURE CONTENT DETERMINED BY ASTM D-1557 TEST PROCEDURES. CONCRETE f, = 2500 PSI MINIMUM 51/2 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE AND A MAXIMUM OF 6.0 GALLONS OF WATER PER 94 LB SACK OF CEMENT. MAXIMUM SLUMP IS 4". SEGREGATION OF MATERIALS TO BE PREVENTED. REINFORCING STEEL #5 BARS AND LARGER SHALL BE GRADE 60 DEFORMED BARS, AND #3 AND #4 BARS SHALL BE GRADE 40, IN ACCORDANCE WITH ASTM A-615. LAP SPLICES 32 BAR DIAMETERS. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A-185 AND SHALL BE 6X6 — W1.4 X W1.4. LAP ONE FULL MESH AT SPLICES TIMBER FRAMING SHALL MEET THE FOLLOWING MINIMUM STANDARDS: BEAMS AND POSTS (4x_ AND GREATER):DF-L#2 JOISTS / STUDS (2x_): HF#2 / STUD GLUE LAMINATED BEAMS (GLB) 24F-V4 (24F-V8 AT CANTILEVERS) PARALLAM BEAMS (PSL) 2.0E UNO 2x TIMBER SHALL BE KILN DRIED. GRADES SHALL CONFORM TO "WWPA GRADING RULES FOR WESTERN LUMBER", LATEST EDITION. ROOF TRUSSES SHALL BE DESIGNED IN ACCORDANCE WITH THE T.P.I. AND THE IBC. ALL CONNECTIONS PER IBC TABLE 2304.9.1. ROOF DIAPHRAGM INSTALL MINIMUM 1/2" CDX PLYWOOD (32/16) OR 7/16" OSB SHEATHING. NAIL ALL SUPPORTED EDGES AND BOUNDARIES WITH 8d AT 6" O.C, AND INTERIOR SUPPORTS WITH 8d AT 12" O.C.; BLOCKING NOT REQUIRED. FLOOR DIAPHRAGM INSTALL MINIMUM 23/32" T&G STURD-I-FLOOR (24oc) SHEATHING. GLUE AND NAIL ALL SUPPORTED EDGES AND BOUNDARIES WITH 10d AT 6" O.C.; AND INTERIOR SUPPORTS WITH 10d AT 12" O.C., BLOCKING NOT REQUIRED. MISCELLANEOUS THE CONTRACTOR SHALL VERIFY DIMENSIONS AND CONDITIONS AT JOB SITE. THE CONTRACTOR SHALL PROVIDE TEMPORARY BRACING AS REQUIRED UNTIL ALL PERMANENT CONNECTIONS AND STIFFENINGS HAVE BEEN INSTALLED. DO NOT SCALE DRAWINGS. PRE -FABRICATED ITEMS TO BE HANDLED AND INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. BOUNDARY NAILING PER PLAN RF SHEATHING PER PLAN MANUFACTURED TRUSS PER PLAN 16d PER SW SCHED BASE PLATE NAILING SHEAR WALL PER PLAN A35 PER SW SCHED TOP PLATE CONN 16d PER SW SCHED BASE PLATE NAILING 2x AS REQ'D (2X12 MAX) TYPICAL SHEAR FLOW S1 TRUSS PARALLEL TO SW NTS SHEARWALL SCHEDULE Date: 4/24/2021 Job #: 1359 SHEATHING - APPLY TO SHEATHING EDGE NAILS *(5) ROOF TO TOP PLATE, MARK BASE PLATE SILL PLATE ANCHORS w/ *(2) 2x HF STUDS @ 16"o/c ALL EDGES BLOCKED NAILS *(5) FLOOR TO TOP PLATE 3" x 3" x 1/4" WASHERS *(8) U.N.O. BELOW *(9) (do not penetrate past flush) & SILL PLATE *(6) SW-1 7/16" OSB 8d @ 6" o/c (12" o/c field) 16d @ 12 " o/c 5/8"Ox10" AB's @ 60 " o/c or A35 24 " o/c SW-2 7/16" OSB 8d @ 4" o/c (12" o/c field) 16d @ 6 " o/c A35 @ 20 " o/c 5/8"Ox10" AB's @ 48 " o/c SW-3 7/16" OSB *(7) 8d @ 3" o/c (12" o/c field) 16d @ 4 " o/c A35 @ 15 " o/c 5/8"OXIO" AB's @ 36 " o/c F_ ANCHOR BOLTS SHALL BE RETROFIT AS REQUIRED WITH 5/8" EXPANSION ANCHORS EMBEDDED 2.5" MIN THE SPACING SHOWN ABOVE HOLDOWN SCHEDULE Date: 4/23/2021 Job #: 1359 HOLDOWN / FASTENERS TO FOUNDATION MARK STRAP *(1) (2)-STUDS MIN U.N.O. ANCHOR *(1)(4) COMMENTS (10) - SDS 0.25x2.5 5/8" THRD ROD W/ T-1 HDU4-SDS2.5 MIN. 4.5" EMBEDMENT WOOD SCREWS SET-XP EPDXY (10) - SDS 0.25x2.5 5/8" THRD ROD W/ T-2 HDU4-SDS2.5 MIN. 7" EMBEDMENT WOOD SCREWS SET-XP EPDXY NOTE T-1 AND T-2 DIFFER ONLY BY THE REQUIRED DEPTH OF EMBEDMENT SHEAR WALL AND HOLDOWN NOTES (1) HOLDOWNS TO BE SIMPSON OR EQUIVALENT WHERE EQUIVALENT IS PERMITTED. LOCATE HOLDOWNS AT ENDS OF SHEARWALLS, UNO. INSTALL PER MANUFACTURER RECOMMENDATIONS FOR FOUNDATION MINIMUM END DISTANCE AND EMBEDMENT. EXTEND, THICKEN, DEEPEN, ETC. FOUNDATION TO MEET THE MANUFACTURER'S SPECIFICATIONS. (2) CONSTRUCT CRIPPLE WALLS AND PONY WALLS TO MATCH SPECIFICATIONS OF THE SHEAR WALL ABOVE. CONSTRUCT GABLE END WALLS TO MATCH SPECIFICATIONS OF THE SHEAR WALL BELOW. CONSTRUCT CLERESTORY WALLS PER SW-1, UNO. ALL EXTERIOR WALLS TO BE CONSTRUCTED PER SW-1, UNO. (3) 3X OR DBL 2X SILL PLATE REQUIRED. (4) USE THREADED ROD AND COUPLER AS REQUIRED. (5) COMMON NAILS, UNO: 8d = 0.131" x 21/2" 10d = 0.148" x 3" 12d = 0.148" x 31/2" 16d = 0.148" x 31/4' (6) INSTALL H1 CLIPS AT EACH TRUSS/RAFTER END. INSTALL A35 @ 24" OC AT EACH GABLE END AND RIM JOIST (OR SOLID BLOCKING) TO TOP PLATE AND MUDSILL CONNECTION, UNO. WHERE SPACING TIGHTER THAN 24" OC IS SPECIFIED, INSTALL A35 CLIPS FROM SOLID BLOCKING TO DBL TOP PLATE, AND INSTALL H1 OR H2.5 CLIPS TO EACH TRUSS/RAFTER END. LTP4, LTP5 or LS50 CAN BE SUBSTITUTED FOR A35 CLIPS PER SIMPSON. (7) MINIMUM 3X OR DBL 2X STUDS REQUIRED AT ABUTTING PANEL EDGES. DBL STUDS TO BE LAMINATED W/ (2) 16d @ 6" OC. (8) ANCHOR BOLTS SHALL BE EMBEDDED 7" MINIMUM INTO CONCRETE. MIN (2) BOLTS PER PIECE WITH ONE BOLT LOCATED NOT MORE THAN 2" OR LESS THAN (7) BOLT DIAMETERS FROM EACH END OF THE PIECE. MUD SILL TO BE 2X MINIMUM AND PRESSURE -TREATED. (9) ALL SHEATHING TO BE APA RATED. SEE GENERAL STRUCTURAL NOTES. SHEAR WALL PER PLAN TIGHT -FIT SOLID BLOCKING BOUNDARY NAILING PER STRUCTURAL NOTES ROOF SHEATHING PER STRUCTURAL NOTES ROOF FRAMING PER PLAN 2X LEDGER (OR RF TRUSS) W/ (2) 16d TO EA STUD TRUSSES OR RAFTERS PARALLEL TO WALL SHEAR WALL PER PLAN TIGHT -FIT SOLID BLOCKING BOUNDARY NAILING PER STRUCTURAL NOTES ROOF SHEATHING PER STRUCTURAL NOTES SHEAR WALL PER PLAN TIGHT -FIT SOLID BLOCKING BOUNDARY NAILING PER STRUCTURAL NOTES ROOF SHEATHING PER STRUCTURAL NOTES TRUSS (MONO) PER PLAN It 2X CONT SOLID BLOCKING ROOF FRAMING PER PLAN W/ (2) 16d TO EA STUD 2X LEDGER W/ (2) 16d TO EA STUD RAFTERS PERPENDICULAR TO WALL TRUSSES PERPENDICULAR TO WALL 4 TYPICAL SHEAR FLOW S1 SW TO SW THRU LO RF NTS __AR WALL ABOVE Z PLAN 3EPLATE NAILING Z SW SCHED AND 16d @ EA JOIST )OR DIAPHRAGM W/ LING PER STRUCT rES LVL RIM TO MATCH 5T DEPTH )OR JOIST PER PLAN PER SW SCHED AR WALL BELOW PER PLAN 23i2�21 ROOF SHEATHING PER GENERAL STRUCTURAL NOTES kTED ROOF TRUSSES AANUFACTURER VENTED BLOCKING PER PLAN WITH EDGE NAILING PER STRUCTURAL NOTES SHEAR WALL PER PLAN TYPICAL SHEAR FLOW S1 ROOF TO SW NTS GABLE END TRUSS AND SHEAR WALL ABOVE PER PLAN EDGE NAILING FROM SHEETS ABOVE AND BELOW BASEPLATE NAILING TO RIM PER SW SCHED AND (2) 16d @ EA JOIST V/, LVL BLOCKING TO MATCH JOIST DEPTH W/ EDGE NAILING PER STRUCT NOTES EVERY 48" OC 13/, LVL RIM JOIST TO MATCH JOIST DEPTH FLOOR JOISTS PER PLAN A35 PER SW SCHED EDGE NAILING FROM SHEETS ABOVE AND BELOW AND AT EA PLT SHEAR WALL BELOW PER PLAN 5 TYPICAL SHEAR FLOW 6 TYPICAL SHEAR FLOW RECEIVE S1 SW TO SW — JOIST PERP NTS S1 SW TO SW — JOIST PARA NTS Apr 30 2021 CITY OF EDMONDS DEVELOPMENT SERVICES �Z U M 0 mo �1 W QX Y� �1 Of a WJ �' LL W N W - Y v •� JO z� o� NW o W L, Do • �U co co W d aZ) _C W �2 o> N W N (n z w W �zQ 0 Q u) LLJ U �w U_ DZ . z 00 UF: z p b W QLJJ CV W Q U 05 zzQO) Ow�� ~ O z W ui N m z M Q QONW UPSTATE JOB#: 1359 DRAWN BY: amg REVISION DATE: 4/23/2021 si BLD2021-0592 SHEAR WALL ABOVE PER PLAN RIM JOIS- RIM JOIST CONI` FROM TO FND PER DEl CORE FOUNE PEI USING A35 CONNECTION C A35 PER SW SCFIL.Lj FRAMING PER PLAN - CONNECTIONS PER SW SCHED ANCHOR BOLTS PER SW SCHED A35 PER SW SCHED 8" STEM WALL W/ (2) #4H TOP #4H@10"OC #4V @ 16" OC W/ ALT STD HOOKS 16"x8" CONCRETE FOOTING W/ (2) #4 CONTINOUS 4" MIN FOOTING DRAIN IN GRAVEL POCKET BEARING SOIL TYP. NEW FOUNDATION $2 NTS RQGF PLATE NAILING PER R WALL SCHED FLOOR SHEATHING PER GENERAL NOTES _OOR FRAMING =R PLAN rvv%.nvr-% DOLTS PER SW SCHED USING LPT4 CONNECTION I I TPA @ SAME SPAG,,... AS A35 PER SW SHED TYP SHEAR FLOW S2 SW TO FND NTS EXISTING FOUNDATION NEW FOUNDATION #4 x 16" DOWEL - 6" TO EXISTING W/ SET EPDXY - 12" EMBEDDED TO NEW - LOCATE TO MATCH NEW STEEL PER DETAIL 5/S1 BEARING SOIL NEW/EXIST FOUNDATION $2 CONNECTION NTS SW ABOVE PER PLAN EDGE NAILING PER SW-1 BASEPLATE NAILING PER SW-1 RIM JOIST PER PLAN ROOF FRAMING PER PLAN FLOOR FRAMING PER PLAN TIGHT -FIT SOLID BLOCKING ABOVE 1 st FLR SW SHEAR WALL PER PLAN TYPICAL SHEAR FLOW S2 SW TO SW- JOIST PERP NTS FLOOR FRAMING PER PLAN SW ABOVE W/ BASEPLATE NAILING PER SCHEDULE TIGHT -FIT SOLID BLK'G ABOVE PONY WALL A35 PER SW SCHED SHEAR WALL TO MATCH SW ABOVE W/ PT MUD SILL ANCHOR BOLTS PER SW SCHEDULE 16" WIDE x 10" THICK FTG W/ (2) #4 CONT FIRM, BEARING SOIL r3� NEW STRIP FTG/PONY WALL $2 BELOW NEW SW ABOVE NTS TYPICAL SHEAR FLOW S2 SW TO SW -JOIST PARA NTS I1►[e11 ZUT/: a»:7 8 STRAP NAILED J TO DBL TOP PL JP TO FLOOR S BLOCKING --FIT SOLID KING W/ EDGE qG FROM FLOOR iRAGM ALIGNED ADJACENT R WALL R WALL IN LINE FLOOR TRUSS KING _3iZo21 CEIVE Apr 30 2021 CITY OF EDMONDS DEVELOPMENT SERVICES 0 �z � mo �~ WLLI }1ii QX Q — •� v JO Yr r W z Uo NLll o w �o �U 00 co Wa QZ) _c/) ,tw �U o� N W N (n Z U) J_ U) Q w 0 w J r) J NQ 0L Q Z) Z p U Z/ � ry 0 ��/�^ VJ .Z 00 U�_ Z p 00�: Fn Q W N Q U Z Q 00 rn Z LILI 0_ 2 0 2 Ow c/) W LW N m z M Q QONW UPSTATE JOB#: 1359 DRAWN BY: amg REVISION DATE: 4/23/2021 S2 BLD2021-0592