Loading...
APPROVED BLD2023-1110+Transportation_Impact_Form+9.1.2023_1.36.10_PM+3761323APPENDIX A Page 1 of 2 Transportation Impact Analysis Worksheet PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: Machiavelli Owner/Applicant Suzette Jarding Name 1215 PINE ST Street/Mailing Address SEATTLE, WA 98101 City Telephone: 206-999-2059 Applicant Contact Person: Amoreena Miller Name 7055 16th Ave NE Street/Mailing Address SEATTLE, WA 98115 State Zip City Telephone: 206-457-5657 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): I.iP"i 7009 is Telephone: 1. PROJECT DESCRIPTION a. Location - Street address: 316 MAIN ST b. Specify existing land use: EATING PLACES Contact Name E-mail: State Zip (Attach a vicinity map and site plan.) c. Specify proposed type and size of development: TENANT IMPROVEMENT/RESTAURANT (# of residential units andlor square footage of building) d. Date construction will begin and be completed: DEC 15, 2023 e. Define proposed access locations: NO CHANGE f. Define proposed sight distance at site egress locations: NO CHANGE HANDOUT UPDATED 05.09.2023 APPENDIX A Page 2 of 2 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC 3.36.130. Check the applicable box below and calculate the fees as necessary: ECYNd A-JGE Type text here ❑ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 impact fee rate shall be used. Units in ITE Land Use Category Per Unit Fee square feet, Rate # of dwelling, vfp, etc. New Use $ X = Prior Use $ X = Use Fee New Use Fee: $ - Prior Use Fee: $ = FEE DUE: $ 1 ❑ NEW DEVELOPMENT ITE Land Use Category Per Unit FeeRate New Use $ ❑ INDEPENDENT FEE CALCULATION X Units in square feet, # of dwelling, vfb. etc. Impact/Mitigation Fee: $ Independent Review Fee: $296.00 (+ peer review fee) 1 $ FEE DUE FEE DUE 10/3/2023 City of Edmouus, r,,igi,iuci ing envision Approval Date 1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 05.09.2023