Loading...
APPROVED BLD BLD2021-1386+Mechanical_Plan+10.6.2021_2.14.06_PM+2448346GENERAL LEGEND SYMBOL DESCRIPTION ABBREVIATIONS ABBR DESCRIPTION ABBR DESCRIPTION DRAWING INDEX DWG. NO. TITLE 73 Q 00 0 0 N 0 N N N A DETAIL SYMBOL: A = IDENTIFYING NUMBER B B = SHEET WHERE DETAIL IS SHOWN A DETAIL SYMBOL: A = IDENTIFYING NUMBER B C B = SHEET WHERE DETAIL IS TAKEN C = SHEET WHERE DETAIL IS SHOWN A SECTION SYMBOL: A = IDENTIFYING LETTER B B = SHEET WHERE SECTION IS SHOWN A SECTION SYMBOL: A = IDENTIFYING LETTER B C B = SHEET WHERE SECTION IS TAKEN C = SHEET WHERE SECTION IS SHOWN SECTION CUT LINE INDICATOR 01 KEYED REFERENCE NOTE OR SHEET NOTE Q5 POINT OF CONNECTION (POC) SYMBOL P1-1 PLUMBING FIXTURE REFERENCE (REFER TO SCHEDULE) AHU-1 EQUIPMENT IDENTIFICATION (REFER TO SCHEDULES) OA MEDICAL GAS OUTLET IDENTIFICATION (REFER TO SCHEDULE) MEDICAL GAS ZONE VALVE STATION MOUNTED IN WALL MEDICAL GAS ALARM PANEL MOUNTED IN WALL MEDICAL GAS OUTLET A REVISION CLOUD AND REVISION NUMBER XX BINARY (YES/NO) SENSING SWITCH (PIPE OR DUCT MOUNTED) XX BINARY (YES/NO) SENSING SWITCH (SURFACE MOUNTED) XX ANALOG SENSING DEVICE (PIPE OR DUCT MOUNTED) ANALOG SENSING DEVICE XX (SURFACE MOUNTED) QX ANALOG SENSING DEVICE (SURFACE MOUNTED) (APPROPRIATE LETTER (X) INDICATES: A - ALARM PRESSURE SENSOR D - DIFFERENTIAL PRESSURE F - FLOW RATE H - HUMIDITY L - LOW LIMIT P - PRESSURE (STATIC) T - TEMPERATURE V - VELOCITY & VOLUME FLOW RATE ABV ABOVE L LENGTH AD ACCESS DOOR LAT LEAVING AIR TEMPERATURE AHU AIR HANDLING UNIT LBS POUNDS AL ACOUSTIC LINED LF LINEAR FOOT/FEET AP ACCESS PANEL LVG LEAVING APD AIR PRESSURE DROP LWG LOW WALL GRILLE ARCH ARCHITECT/ARCHITECTURAL LWR LOW WALL REGISTER ARV AUTOMATIC RELIEF VALVE or LWT LEAVING WATER TEMPERATURE ACID RESTISTANT VENT ARW ACID RESTISTANT WASTE MAX MAXIMUM MBH 1000 BRITISH THERMAL BDD BACKDRAFT DAMPER UNITS PER HOUR BFP BACKFLOW PREVENTER MCC MOTOR CONTROL CENTER BHP BRAKE HORSEPOWER MECH MECHANICAL BG BELOW GROUND MFR MANUFACTURER BJ BETWEEN JOISTS MIN MINIMUM BTU BRITISH THERMAL UNIT MISC MISCELLANEOUS BTUH BRITISH THERMAL UNITS PER HOUR MTD MOUNTED MTG MOUNTING C CENTIGRADE CC COOLING COIL N/A NOT APPLICABLE CD CEILING DIFFUSER N/C NORMALLY CLOSED CFM CUBIC FEET PER MINUTE N/O NORMALLY OPEN CG CEILING GRILLE NC NOISE CRITERIA CI CAST IRON NIC NOT IN CONTRACT CLG CEILING NTS NOT TO SCALE CO CLEANOUT CONC CONCRETE OA OUTSIDE AIR CONN CONNECT or CONNECTION OBD OPPOSED BLADE DAMPER CONST CONSTRUCTION O/C ON CENTER CONT CONTINUATION OD OUTSIDE DIAMETER CR CONDENSATE RETURN OPNG OPENING DB DECIBLE or DRY BULB PCV PRESSURE CONTROL VALVE DDC DIRECT DIGITAL CONTROL PD PRESSURE DROP DIA DIAMETER PH or 0 PHASE DIM DIMENSION PLCS PLACES DN DOWN POC POINT OF CONNECTION DPR DAMPER POUA POINT OF USE ALARM DWG DRAWING PRV PRESSURE REDUCING VALVE PSI POUNDS PER SQUARE INCH E-100 EXHAUST AIR PSIG POUNDS PER SQUARE INCH GAGE NUMBER INDICATES CFM QUANTITY EA EACH R-100 RETURN AIR EAT ENTERING AIR TEMPERATURE NUMBER INDICATES CFM QUANTITY EF EXHAUST FAN RA RETURN AIR EG EXHAUST GRILLE RAG RETURN AIR GRILLE ELEC ELECTRIC or ELECTRICAL REQD REQUIRED ELEV ELEVATION RPBP REDUCED PRESSURE BACKFLOW EMCS ENERGY MANAGEMENT CONTROL SYSTEM PREVENTOR ESP EXTERNAL STATIC PRESSURE EWT ENTERING WATER TEMPERATURE RPM REVOLUTIONS PER MINUTE EXH EXHAUST EXST or (E) EXISTING S-100 SUPPLY AIR NUMBER INDICATES CFM QUANTITY F FAHRENHEIT SA SUPPLY AIR FA FACE AREA SF SUPPLY FAN FCO FLOOR CLEANOUT SHT SHEET FCU FAN COIL UNIT SIM SIMILAR FD FLOOR DRAIN SP STATIC PRESSURE FDPR FIRE DAMPER SQ SQUARE FFD FUNNEL FLOOR DRAIN SQ FT SQUARE FOOT/FEET FF FINAL FILTER SS STAINLESS STEEL FLR FLOOR STD STANDARD FPM FEET PER MINUTE FPS FEET PER SECOND THK THICK FT FOOT/FEET TP TRAP PRIMER or TEST PLUG FV FACE VELOCITY TYP TYPICAL TU TERMINAL UNIT GA GAGE or GAUGE GAL GALLON UBC UNIFORM BUILDING CODE GALV GALVANIZED UFC UNIFORM FIRE CODE GPH GALLONS PER HOUR UMC UNIFORM MECHANICAL CODE GPM GALLONS PER MINUTE UNO UNLESS OTHERWISE NOTED UPC UNIFORM PLUMBING CODE H HEIGHT UG UNDERGROUND HD HEAD UH UNIT HEATER HP HORSEPOWER HTG HEATING VA VALVE HVAC HEATING, VENTILATION AND VAC VACUUM AIR CONDITIONING VAV VARIABLE AIR VOLUME HWG HIGH WALL GRILLE VD VOLUME DAMPER HWR HIGH WALL REGISTER VEL VELOCITY HZ HERTZ VFD VARIABLE FREQUENCY DRIVE VTR VENT THRU ROOF DUCT FITTING REQUIREMENTS THE FOLLOWING DUCT FITTINGS ARE CONSIDERED ACCEPTABLE. THE CONTRACTOR SHALL OBTAIN ENGINEER'S APPROVAL FOR OTHER FITTINGS PRIOR TO FABRICATION. ONLY FITTINGS WITH EQUAL OR LOWER PRESSURE DROP WILL BE CONSIDERED. DUCT ELBOWS OFFSETS BRANCH DUCT TAKEOFFS NOTE: OFFSETS (TO AVOID OBSTRUCTIONS) ARE REQUIRED BUT W/ MINIMUM PRESSURE DROP ARE NOT NECESSARILY SHOWN ON THE PLANS. �W l�R=1/2W DUCTS W/ AIR VELOCITY UNDER 1,500 FPM R=W DUCTS W/ AIR VELOCITY OVER 1,500 FPM AND ALL DUCTS UPSTREAM OF TERMINAL UNITS 12"x12" ACCESS PANEL ON BOTTOM OF DUCT UPSTREAM OF TURNING VANES. REQUIRED FOR RETURN AND EXHAUST DUCTS TURNING VANES CHANGE OF DUCT SIZE MAX. 15' TRANSITION CONICAL SPIN -IN OR TRANSITION TO CONNECTION SIZE AT LEAST 50% GREATER THAN AREA OF SMALLER DUCT END TAP -�7 MAX. 15' -45' OR 90' RADIUS ELBOWS OBTAIN PRIOR APPROVAL FOR ALL RETURN & EXHAUST LOCATIONS J JJ JJJJ TURNING VANES ACCESS PANEL (TYPICAL) REQUIRED FOR RETURN & EXHAUST DUCTS -NOT LESS THAN TWICE THE DUCT AREA I\VVI9V VI\ RECTANGULAR D= 1 /2W, BUT NOT MORE THAN 12" (1/3W OK IF UNDER 3.000 FPM) ___�WI_ --� W -R=1/2W DUCTS W/ AIR VELOCITY UNDER 1,500 FPM R=W DUCTS W/ AIR VELOCITY OVER 1,500 FPM AND ALL DUCTS UPSTREAM OF TERMINAL UNITS RECTANGULAR DUCT CONICAL SPIN -IN ROUND DUCT OK ONLY RUNOUT TO SINGLE UNDER DIFFUSER OR 1,500 FPM GRILLE ONLY ACCESS PANEL iAIR EXTRACTOR ADJUSTABLE FROM OUTSIDE DUCTWORK. OK ONLY OBTAIN PRIOR UNDER APPROVAL FOR ALL 1,500 FPM RETURN AND EXHAUST LOCATIONS W WASTE M0.1 COVER SHEET AND GENERAL INFO W/ WITH MO.2 GENERAL NOTES W/O WITHOUT WB WET BULB MO.3 SCHEDULES WCO WALL CLEANOUT MO.4 SCHEDULES WG WATER GAGE WGE WASTE GAS EVACUATION M1.1 LEVEL 1 HVAC PLAN WPD WATER PRESSURE DROP M1.2 LEVEL 2 HVAC PLAN WT WEIGHT M1.3 LEVEL 1 HVAC PIPING PLAN M1.4 LEVEL 2 HVAC PIPING PLAN M2.1 SECTIONS & ELEVATIONS M2.2 VRF SYSTEM SCHEMATIC M2.3 DETAILS M3.1 HVAC LOAD CALCS M3.2 HVAC LOAD CALCS M3.3 HVAC LOAD CALCS M3.4 HVAC LOAD CALCS DEFFERED SUBMITTALS 1. Seismic Restraint calculations, Gravity r calculations, and anchor details for all equipment over 400 pounds. rTTTTTTTTTTTTT«<rTTrrrrrr COMMISSIONING DOCUMENTS 1. Mechanical Equipment and controls 2. Functional performance testing 3. Service water heating 4. Metering 5. Refrigeration system r Please see Commissioning notes on sheet MO.2 APPROVED BY PLANNING Mar 07 2022 City Of Edmonds Building Department ------------------------------------------------------------------------ Work MECHANICAL . Address --------------------------------------------------- ------------------------------- 471 ADMIRAL WAY ------------------- -------------- Owner -------------------- PORT OF EDMONDS Approved Date 12/30/2021 ------------------------------------ Building Official ; -------------------------------------------- W. W vfkof -------------------------------------- Permit Number BLD2021-1386 ------------------------------- City of Edmonds Building Department APPROVED Plans ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE OBTAIN ELECTRICAL PERMIT FROM STATE LABOR & INDUSTRIES NJ I iTl ACKSON I MAIf R C H I T E C T U R 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 WWW.JACKSONMAIN.COM �COFFMAN N G I N E E R S 1101 2nd Ave., Suite 400 1 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com LASTING creativity I results I relationships BLD2021-1386 RECEIVED Oct 14 2021 0 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Z O o G U)> 6 0 LU Q > O� LU >J Q LL OQ3: O C/' Q � � z 0 O LU JMo 2 U co LU 0 0 Z CD O z C/) G 0 W >- O 00 O w J_��jQ LL 00 0 J < z () 2i Qz L.L.. � LU0z Q O 0 Q O 0� (� 0 0- � LU J z O H ~ �m Ir D U U) U W o � W O z W N Q L0 0 il PROJECT NO.: 210887 PROJECT MGR.: ON DRAWN BY: CEI CHECKED BY: ON COVER SHEET AND GENERAL INFO mom JACKSON I MAIN ARCHITECTURE P.S. © 2021 WA GENERAL M ECH NOTES WA GENERAL HVAC NOTES WA GENERAL HVAC NOTES (CONT.) DESCRIPTION OF OPERATIONS 1. CONTRACTOR SHALL SECURE, MAINTAIN, AND PAY FOR ALL REQUIRED PERMITS, LICENSES, AND INSPECTIONS FOR DURATION OF WORK UNLESS DIRECTED OTHERWISE. 2. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2018 EDITIONS OF THE INTERNATIONAL MECHANICAL CODE, WASHINGTON STATE ENERGY CODE, INTERNATIONAL BUILDING CODE, INTERNATIONAL FIRE CODE, UNIFORM PLUMBING CODE, AND GOVERNING STATE AND LOCAL CODES AND ORDINANCES. 3. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 4. ALL WORK SHALL COMPLY WITH THE OWNER'S REQUIREMENTS. 5. SUBSTITUTIONS OF EQUIPMENT OTHER THAN AS SPECIFIED SHALL BE THE COMPLETE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DESIGN CHANGES OR IMPACTS THAT THE PROPOSED EQUIPMENT SUBSTITUTION HAS ON OTHER DISCIPLINES. ANY ADDITIONAL ELECTRICAL, STRUCTURAL, MECHANICAL, OR ARCHITECTURAL REQUIREMENTS SHALL BE PROVIDED AT NO ADDITIONAL EXPENSE TO THE OWNER. 6. REFER TO PROJECT MANUAL (SPECIFICATIONS) FOR ADDITIONAL REQUIREMENTS. PLANS AND SPECIFICATIONS SHALL BE TAKEN TOGETHER. PROVIDE ALL WORK CALLED FOR IN EITHER. IN CASE OF CONFLICT BETWEEN SPECIFICATIONS AND PLANS THE MORE STRINGENT SHALL APPLY. 7. MATERIALS OR EQUIPMENT SPECIFIED TO BE "FURNISHED BY OTHERS" SHALL BE FURNISHED BY THE GENERAL CONTRACTOR AND PROCURED FROM SOURCES SPECIFIED BY THE CONTRACT DOCUMENTS. 8. ALL EQUIPMENT AND MATERIAL ON THE JOB SITE PRIOR TO INSTALLATION SHALL BE COVERED AND PROTECTED FROM DIRT, DUST, AND DAMAGE. 9. PROVIDE ALL DEMOLITION WORK CALLED FOR OR REQUIRED BY THE INSTALLATION. REMOVE ALL EXISTING EQUIPMENT AND MATERIALS NOT REUSED UNLESS SPECIFIED OTHERWISE BY THE OWNER'S REP. 10. VERIFY PHYSICAL DIMENSIONS OF EQUIPMENT TO ENSURE THAT ACCESS CLEARANCES CAN BE MET. COORDINATE FINAL EQUIPMENT LOCATIONS W/ GENERAL CONTRACTOR AND OTHER TRADES TO ALLOW FOR REQUIRED MECHANICAL EQUIPMENT CLEARANCES. 11. PROVIDE NEC CODE MINIMUM HORIZONTAL AND VERTICAL WORKING CLEARANCES FOR ALL ELECTRICAL PANELS AND EQUIPMENT. OFFSET MECHANICAL WORK AS REQUIRED. 12. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF INSTALLATION STANDARDS AND CONSTRUCTION CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO SHOP FABRICATION AND/OR FIELD INSTALLATION. DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE CONSTRUCTION DRAWINGS SHALL BE CALLED TO THE ATTENTION OF THE ENGINEER. WORK DONE WITHOUT THE ENGINEERS APPROVAL IS THE RESPONSIBILITY OF THE CONTRACTOR. 13. ALL MECHANICAL EQUIPMENT, MATERIALS, AND INSTALLATION SHALL BE PROVIDED BY THE CONTRACTOR. ALL EQUIPMENT SHALL BE COMPLETE, INSTALLED, AND FULLY FUNCTIONAL PRIOR TO FINAL ACCEPTANCE OF THE WORK. 14. INSTALL ALL EQUIPMENT PER MANUFACTURERS RECOMMENDATIONS AND REQUIREMENTS. ANY CONFLICTS BETWEEN THE MANUFACTURERS DOCUMENTATION AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. 15. PROVIDE SEISMIC RESTRAINT OF MECHANICAL SYSTEMS AND EQUIPMENT AS REQUIRED BY ASCE-7 AND INTERNATIONAL BUILDING CODE AS ADOPTED BY THE AUTHORITY HAVING JURISDICTION. 16. DO NOT ALLOW ANY WORK TO BE COVERED UP OR ENCLOSED UNTIL INSPECTED, TESTED AND APPROVED BY OWNER'S REPRESENTATIVE OR AUTHORITY HAVING JURISDICTION. 17. MECHANICAL EQUIPMENT SHALL NOT BE USED FOR TEMPORARY HEAT DURING CONSTRUCTION. WSEC COMMISSIONING NOTES 1. DOCUMENTS DESCRIBED IN 2018 WSEC C103.6, INCLUDING RECORD DOCUMENTS, MANUALS, COMPLIANCE DOCUMENTATION, AND SYSTEM OPERATION TRAINING, SHALL BE PROVIDED TO THE BUILDING OWNER OR OWNER'S AUTHORIZED AGENT WITHIN 180 DAYS OF THE DATE OF RECEIPT OF THE CERTIFICATE OF OCCUPANCY. 2. A FINAL COMMISSIONING REPORT AS DESCRIBED BY 2018 WSEC C408.1.3 SHALL BE REQUIRED AND INCLUDES FUNCTIONAL PERFORMANCE TEST RESULTS, DESCRIPTIONS OF DEFICIENCIES & DETAILS OF CORRECTIVE MEASURES, AND FUNCTIONAL PERFORMANCE TEST RESULTS. 3. MECHANICAL EQUIPMENT AND CONTROLS SHALL BE COMMISSIONED PER 2018 WSEC C408.2. FUNCTIONAL PERFORMANCE TESTING SHALL BE PERFORMED IN ACCORDANCE WITH 2O18 WSEC C408.2.3. 4. PROVIDE SERVICE WATER HEATING COMMISSIONING PER 2018 WSEC C408.3. 5. PROVIDE METERING COMMISSIONING PER 2018 WSEC C408.6. 1��;ii1�/I�1�K�1�l�lE,��(i1►11►[eZil :l09l[e10:7_111il=0312111yaA:lwii71E:113-110ZK1iI:y1l 1. SHEET METAL DUCTWORK AND COMPONENTS INCLUDING HANGING, SEALING, PLENUMS, & ACCESSORIES SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH THE LATEST EDITION OF SMACNA STANDARDS FOR HVAC DUCT CONSTRUCTION, NFPA 90A, & 90B STANDARDS. EARTHQUAKE BRACE ALL DUCTS 28" DIA AND LARGER WHICH ARE SUSPENDED MORE THAN 12" BELOW STRUCTURAL SYSTEM. 2. PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH THE CURRENT IBC 1613. 3. ALL DUCTWORK OPENINGS SHALL BE COVERED DURING CONSTRUCTION. ALL DAMPERS TO BE SET TO FULL OPEN DURING CONSTRUCTION PRIOR TO BALANCING. 4. PROVIDE UL LISTED FLEXIBLE CONNECTION ON INTAKE AND DISCHARGE OF ALL MECHANICAL EQUIPMENT. HVAC UNIT FLEXIBLE DUCT CONNECTIONS SHALL BE MINIMUM OF 6 INCHES LONG AND HELD IN PLACE WITH HEAVY METAL BANDS, SECURELY ATTACHED TO PREVENT ANY LEAKAGE AT THE CONNECTION POINTS. FLEXIBLE CONNECTIONS SHALL BE FABRICATED FROM APPROVED FLAME PROOF FABRIC CONFORMING TO NFPA 90A. ASBESTOS CLOTH IS NOT ACCEPTABLE. 5. CONTRACTOR SHALL PROVIDE TRANSITION TO CONNECT TO ALL MECHANICAL EQUIPMENT. 6. DUCT DIMENSIONS SHOWN ARE INSIDE SHEET METAL DIMENSIONS OR CLEAR OPENING INSIDE LINED DUCT. THE FIRST NUMBER REPRESENTS THE WIDTH OF DUCT IN PLAN VIEW. 7. PROVIDE DUCT LINER IN SUPPLY AND RETURN DUCTS WITHIN 15 FT OF AIR HANDLERS. 8. PROVIDE DUCT LINER IN THE FIRST 15 FT OF SUPPLY DUCTWORK DOWNSTREAM FROM SOUND ATTENUATORS AND IN THE FIRST 15 FT OF RETURN DUCTWORK UPSTREAM OF SOUND ATTENUATORS. 9. PROVIDE MINIMUM OF 5 FT LINED RECTANGULAR DUCT DOWNSTREAM OF ALL TERMINAL UNITS. 10. PROVIDE 1" THICK DUCT LINER IN ALL TRANSFER AIR DUCTWORK UNLESS NOTED OTHERWISE. 11. ALL ELBOWS SHALL BE LONG RADIUS ELBOWS WHEREVER POSSIBLE OR SHALL HAVE TURNING VANES WHERE INDICATED ON PLANS. NO SQUARE THROAT OR ZERO RADIUS ELBOWS ALLOWED. 12. ALL DUCT BRANCH CONNECTIONS TO DIFFUSERS OR GRILLES AND TO OR FROM MAIN DUCTS, SHALL INCLUDE MANUAL VOLUME DAMPERS. ALL SPIN -IN FITTINGS SHALL BE CONICAL, RECTANGULAR BRANCH DUCT TAKEOFFS SHALL HAVE 45' TAKEOFFS. 13. PROVIDE CONCEALED OR REMOTE DAMPER REGULATORS OR ACCESS DOORS FOR ALL MANUAL VOLUME DAMPERS LOCATED THAT ARE INACCESSIBLE. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES. ALL FINAL ACCESS DOOR LOCATIONS SHALL BE APPROVED BY ARCHITECT PRIOR TO INSTALLATION. 14. PROVIDE RETURN DUCT SMOKE DETECTOR AUTOMATIC SHUT DOWN OF ALL NEW HEATING, COOLING, OR VENTILATION EQUIPMENT MOVING 2,000 CFM OR GREATER PER SECTION 606 OF THE CURRENT IMC. THE ELECTRICAL CONTRACTOR SHALL PROVIDE POWER AND INTERLOCK WIRING TO THE BUILDING FIRE ALARM SYSTEM. BAS TO MONITOR FIRE ALARM CONTROL PANEL AND SHUT DOWN ALL FAN TERMINAL UNITS DURING ANY BUILDING FIRE ALARM EVENT, IN ACCORDANCE WITH THE CURRENT IMC 606.2.2. 15. 24"x24" ACCESS DOORS SHALL BE PROVIDED FOR ALL MECHANICAL EQUIPMENT LOCATED ABOVE GYPSUM BOARD CEILINGS. ALL FINAL ACCESS DOOR LOCATIONS SHALL BE APPROVED BY ARCHITECT PRIOR TO INSTALLATION. 16. PROVIDE FIRE DAMPERS, SMOKE DAMPERS AND FIRE/SMOKE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY IBC 717. PROVIDE CEILING FIRE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY IBC 717.6.2.1. INSTALL FIRE DAMPERS SMOKE DAMPERS AND FIRE/SMOKE DAMPERS IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS, THE TERMS OF THEIR LISTING, AND THE REQUIREMENTS OF THE CURRENT IMC. 17. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL. 18. HEAT TRACING OF PIPING SHALL BE PROVIDED BY THE HVAC CONTRACTOR. THE HVAC CONTRACTOR SHALL COORDINATE THE HEAT TRACE POWER WIRING WITH ELECTRICAL CONTRACTOR. 19. CONTRACTOR SHALL FURNISH COMBINATION STARTERS SIZED IN ACCORDANCE WITH THE MOTOR RATING OF THE MECHANICAL EQUIPMENT. STARTERS SHALL BE SUPPLIED WITH FUSES OR CIRCUIT BREAKERS, CONTROL TRANSFORMER, OVERLOADS, ONE N.O. AND ONE N.C. AUXILIARY CONTACT AND H.O.A. SWITCH MOUNTED IN THE COVER. STARTER ENCLOSURE SHALL BE NEMA RATED FOR ITS LOCATION. STARTER SHALL BE INSTALLED AND WIRED BY THE ELECTRICAL CONTRACTOR. MOTOR STARTERS NOT LISTED AS BEING PROVIDED IN THE HVAC EQUIPMENT SCHEDULES ARE TO BE PROVIDED BY ELECTRICAL CONTRACTOR. 20.FLEXIBLE DUCTWORK SHALL BE RATED CLASS I, WHEN TESTED UNDER THE REQUIREMENTS OF UL181. FLEXIBLE DUCT LENGTH SHALL NOT EXCEED (6) FEET. 21. FLEX AND DUCTWORK SHALL NOT BE CONNECTED DIRECTLY TO DIFFUSER OR GRILLES UNLESS INDICATED IN DRAWINGS. DIFFUSER / GRILLE BOXES WITH LINER AND PERFORATED DIFFUSER PLATES SHALL BE USED. 22. PROVIDE DIFFUSER AND GRILLE FRAMES COMPATIBLE WITH ARCHITECTURAL CEILING TYPES AND COORDINATE LOCATIONS WITH THE ARCHITECTURAL REFLECTED CEILING PLAN AND ELECTRICAL LIGHTING LAYOUT. 23. ALL DUCTWORK VISIBLE THROUGH RETURN OR SUPPLY GRILLES TO BE PAINTED FLAT BLACK. 24. COORDINATE LOCATIONS OF ALL ROOM THERMOSTATS OR ROOM TEMPERATURE SENSORS WITH ARCHITECT PRIOR TO INSTALLATION. 25. SUPPLY DUCTWORK: 2" STATIC PRESSURE CLASS WITH ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS SEALED (SMACNA SEAL CLASS A). SPIRAL LOCK SEAMS IN ROUND AND FLAT OVAL DUCTWORK DO NOT REQUIRE SEALING. 26. SUPPLY DUCTWORK DOWNSTREAM OF TERMINAL UNITS: 1" STATIC PRESSURE CLASS WITH ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS SEALED (SMACNA SEAL CLASS A). SPIRAL LOCK SEAMS IN ROUND AND FLAT OVAL DUCTWORK DO NOT REQUIRE SEALING. 27. EXHAUST AND RETURN DUCTWORK: 2" STATIC PRESSURE CLASS WITH ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS SEALED (SMACNA SEAL CLASS A). 1" PRESSURE CLASS ACCEPTABLE BETWEEN GRILLES AND FIRST DAMPER. 28. GREASE DUCTWORK: PRIOR TO CONCEALMENT BY FIRE -WRAP APPLICATION, PERFORM A LEAKAGE TEST IN ACCORDANCE WITH SECTION 506.3.2.5 OF THE CURRENT IMC. 29. SHAFT WALLS CONSTRUCTED TO SUPPORT AIR MOVEMENT FOR RETURN AIR SYSTEMS AND STAIR & ELEVATOR PRESSSURIZATION SYSTEMS SHALL BE CONSTRUCTED TO THE FOLLOWING STANDARDS: a. SHAFTS (RATED FOR MAXIMIUM 2" WC) SHALL BE CONSTRUCTED TO WITHSTAND 15 PSF LOADING WITH A DEFLECTION OF L/360 (UNO). b. SHAFTS SHALL BE SEALED SUBSTANTIALLY AIR -TIGHT USING THE CRITERIA FROM THE IBC: i. IBC 715.6 FIRE RESISTANT JOINT SYSTEMS IN SMOKE BARRIERS: LEAKAGE SHALL NOT EXCEED 5 CFM PER LINEAR FOOT OF JOINT AT 0.3" WC. ii. IBC 909.5 SMOKE BARRIER CONSTRUCTION FOR INTERIOR EXIT STAIRWAYS AND EXIT PASSAGEWAYS: MAXIMUM ALLOWABLE LEAKAGE AREA. c. STAIR AND ELEVATOR PRESSURIZATION SHAFTS SHALL BE PRESSURE TESTED DURING COMMISIONING. CONTRACTOR SHALL MAKE MODIFCATIONS TO INSTALLATION UNTIL SHAFT IS IN COMPLIANCE. 30. MATERIALS WITHIN PLENUMS SHALL BE NONCOMBUSTIBLE OR SHALL BE LISTED AND LABELED AS HAVING A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE -DEVELOPED INDEX OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723, EXCEPT AS NOTED IN SECTIONS 602.2.1.1 THROUGH 602.2.1.7 OF THE CURRENT IMC. WSEC HVAC NOTES 1. ALL MOTORS SIZED FROM 1/12 HP TO 1 HP SHALL BE ELECTRONICALLY COMMUTED (EC) MOTORS PER CURRENT WSEC C405.8. 2.FAN MOTORS SHALL BE THE SMALLEST AVAILABLE MOTOR SIZE GREATER THAN FAN BHP UNLESS OTHERWISE NOTED PER CURRENT WSEC C403.2.11.2. 3. ALL MOTORS SHALL BE ENERGY EFFICIENT MOTORS MEETING NEMA STANDARD MG-1 EXCEPT THOSE INCLUDED IN PACKAGED EQUIPMENT WITH EFFICIENCY RATED AS A WHOLE UNIT. 4.HEATING AND COOLING LOADS HAVE BEEN PERFORMED PER ASHRAE STANDARDS. 5.HVAC EQUIPMENT SIZED NO LARGER THAN THE NEXT LARGEST UNIT AVAILABLE ABOVE THE CALCLATED HEATING/COOLING LOADS PER CURRENT WSEC C403.2.2. 6. CONTROLS TO USE A 5'F MINIMUM DEADBAND BETWEEN HEATING AND COOLING PER CURRENT WSEC C403.2.4.1.2. 7.INTERIOR VAV BOXES SHARING AN OPEN SPACE WITH PERIMETER VAV BOXES SHALL NOT PROVIDE COOLING UNLESS ZONE TEMPERATURE IS 5'F ABOVE PERIMETER ZONE TEMPERATURE PER CURRENT WSEC C403.2.4.1 EXCEPTION 2. 8. AUTOMATIC SETBACK/SHUTOFF: PROVIDE WITH DDC CONTROL SYSTEM AS PER CURRENT WSEC C403.2.4.2.2. 9.OPTIMUM START CONTROLS: PROVIDE WITH AUTOMATIC START CONTROLS AS PER CURRENT WSEC C403.2.4.2.3. 10. SUPPLY DUCT WHICH CONVEYS SUPPLY AIR AT TEMPERATURES LESS THAN 55 DEG F OR GREATER THAN 105 DEG F, WHEN LOCATED IN CONDITIONED SPACE, SHALL BE INSULATED WITH A MINIMUM OF R-3.3. WHEN LOCATED IN UNCONDITIONED SPACE, R-6 AND WHEN LOCATED OUTSIDE THE BUILDING R-8 (CLIMATE ZONE 4) OR R-12 (CLIMATE ZONE 5) PER WSEC C403.2.8.2. 11. DUCTS CONVEYING OUTSIDE AIR: PER CURRENT WSEC SECTION C403.2.8.1 ALL DUCTS CONVEYING OUTSIDE AIR FROM THE EXTERIOR OF THE BUILDING TO THE MECHANICAL SYSTEM SHALL MEET ALL AIR LEAKAGE AND BUILDING ENVELOPE INSULATION REQUIREMENTS AS NOTED IN SECTION C402 OF THE CURRENT WSEC. 12. OUTSIDE AIR DUCT INSULATION SHALL MATCH PENETRATED BUILDING ENVELOPE INSULATION VALUES UNLESS SERVING INDIVIDUAL SUPPLY AIR UNITS WITH LESS THAN 2,800 CFM OF TOTAL SUPPLY AIR CAPACITY, PROVIDED THESE ARE INSULATED TO R-7 MINIMUM PER CURRENT WSEC C403.2.8.1. 13. PROVIDE HIGH PRESSURE DUCT LEAK TEST AS SPECIFIED AND REQUIRED PER CURRENT WSEC C403.2.8.3.3. 14. AUTOMATIC (MOTORIZED, FAIL CLOSED) DAMPERS AT OUTSIDE AIR INTAKES, EXHAUST OUTLETS, AND RELIEF OUTLETS: DAMPERS TO COMPLY WITH CURRENT WSEC C403.2.4.3. DAMPER LEAKAGE RATES SHALL NOT EXCEED 4 CFM / SQ.FT. AT 1.0" W.G. FOR MOTORIZED DAMPERS OR 20 CFM / SQ.FT. AT 1.0" W.G. FOR NONMOTORIZED DAMPERS, EXCEPT NONMOTORIZED DAMPERS SMALLER THAN 24" IN EITHER DIMENSION WHERE THE MAXIMUM ALLOWABLE LEAKAGE RATE IS 40 CFM / SQ.FT. 15. ECONOMIZER FAULT DETECTION: IN ACCORDANCE WITH CURRENT WSEC C403.2.4.7, PROVIDE ECONOMIZER FAULT DETECTION AND DIAGNOSTICS ON REQUIRED EQUIPMENT. 16. HEAT PUMP (UNITARY, AIR COOLED) MICROPROCESSOR CONTROLS: PROVIDE PER CURRENT WSEC C403.2.4.1.1. 17. FREEZE PROTECTION CONTROL SYSTEMS: FREEZE PROTECTION SYSTEMS, SUCH AS HEAT TRACE, SHALL INCLUDE AUTOMATIC SHUT-OFF WHEN OSA IS ABOVE 40'F PER CURRENT WSEC C403.2.4.6. 18. PROVIDE HYDRONIC BALANCING DEVICES IN ALL HEATING AND COOLING COILS AS REQUIRED BY CURRENT WSEC C408.2.2.2. 19. ALL HYDRONIC PIPING THAT SERVES AS PART OF A HEATING OR COOLING SYSTEM SHALL BE INSULATED IN ACCORDANCE WITH TABLE C403.2.9 OF THE CURRENT WSEC. ALL GLASS FIBER PREFORMED PIPE INSULATION SHALL MEET ASTM C547. 20.ENERGY METERING: METERS ARE PROVIDED FOR ENERGY SOURCES AS PER CURRENT WSEC C409. 21. ELECTRICAL METERING IS REQUIRED PER CURRENT WSEC C506.2.1, IF EXISTING ELECTRICAL PANEL SERVING HVAC EQUIPMENT IS 50 KVA 0 DESCRIPTION OF OPERATION DESCRIPTIONS OF OPERATION ARE DESIGNED TO ILLUSTRATE BASIC CONTROL FUNCTIONS ONLY. MECHANICAL CONTRACTOR SHALL REVIEW DRAWINGS AND SUBMIT COMPLETE SEQUENCES OF OPERATION ALONG WITH INSTALLATION DATA, INCLUDING MINOR DETAILS, TO PROVIDE PROPER OPERATION IN HIS SUBMITTAL. WHERE AN ITEM DIFFERS FROM SPECIFICATIONS, THE MECHANICAL CONTRACTOR SHALL SUBMIT MANUFACTURER'S RECOMMENDATIONS SUBJECT TO ARCHITECT'S APPROVAL. WHERE SENSORS ARE SHOWN ON PLANS OR DIAGRAMS BUT NOT ADDRESSED IN DESCRIPTION, THEY SHALL STILL BE PROVIDED FOR MONITORING AND ALARMING PURPOSES. GENERAL REQUIREMENTS ALL MECHANICAL SYSTEMS TO HAVE DDC CONTROLS. CONTROLS TO HAVE CAPABILITY OF REMOTE CONTROL. THE VRF CONTROLLERS SHALL BE THE FRONT END DDC CONTROLLER FOR THE BUILDING AND SHALL BE LOCATED IN THE SERVER ROOM (VERIFY LOCATION WITH PORT OF EDMONDS PRIOR TO INSTALLATION). THE VRF CONTROLLER SHALL CONTROL AND MONITOR THE VRF SYSTEM, DOAS-1, AND THE MAINTENANCE SHOP HVAC SYSTEMS. THE VRF CONTROLLERS SHALL MONITOR THE SERVER ROOM SPLIT SYSTEM SPACE TEMPERATURE. THE VRF CONTROLLER SHALL BE A TOUCH SCREEN DISPLAY AND SHALL BE CAPABLE OF VRF MONITORING AND CONTROL, SCHEDULING (DAILY AND ANNUALLY), AND TRENDING. THE VRF CONTROLLER SHALL BE TRANE/MITSUBISHI TE/AE-200 WITH DIDO AND Al BOARDS TO ACCOMPLISH THE SEQUENCE DESCRIBED BELOW. ALL UNITS WITH 2,000 CFM OR MORE CAPACITY (OR AS MARKED IN PLANS) TO HAVE A DUCT SMOKE DETECTOR. ALL WIRING OF SMOKE DETECTOR AND SHUT DOWN OF UNITS TO BE BY FIRE ALARM. PACKAGED EQUIPMENT: CONTROLS AND COMPONENTS FURNISHED WITH PACKAGED UNITS MAY BE USED TO MEET SOME OR ALL CONTROL REQUIREMENTS. THE CONTROL SUBCONTRACTOR SHALL FURNISH ALL ADDITIONAL CONTROLS AND COMPONENTS, ALL INSTALLATION LABOR, AND ALL ADDITIONAL TESTING AND SETUP REQUIRED TO ACHIEVE COMPLETE CONTROL. CONTROL POWER: REFER TO THE ELECTRICAL DRAWINGS AND SPECIFICATION FOR AVAILABLE CONTROL POWER LOCATIONS. THE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR BRINGING CONTROL POWER TO ALL CONTROL DEVICES EXCEPT WHERE POWER IS PROVIDED WITHIN A PACKAGED UNIT. AS AN ALTERNATIVE, THE MECHANICAL SUBCONTRACTOR CAN MAKE SPECIFIC ARRANGEMENTS WITH EQUIPMENT SUPPLIERS FOR CONTROL POWER TRANSFORMERS TO BE FURNISHED WITH EQUIPMENT (TERMINAL UNITS FOR EXAMPLE) HOWEVER CONTROL POWER FOR ONE PIECE OF EQUIPMENT SHALL NOT BE TAKEN FROM A TRANSFORMER POWERED THROUGH ANOTHER PIECE OF EQUIPMENT. SYSTEM SPECIFIC REQUIREMENTS A. SERVER ROOM DUCTLESS SPLIT SYSTEM: THE HEAT PUMP SHALL OPERATE 24/7 AND SHALL BE CONTROLLED BY STANDALONE THERMOSTAT. THE COOLING SETPOINT SHALL BE 80 DEG.F AND THE HEATING SETPOINT SHALL BE 55 DEG.F (USER ADJUSTABLE, REVISE AS REQUIRED BASED ON USER REQUIREMENTS). TEMPERATURE IN THE SERVER ROOM SHALL BE MONITORED BY THE VRF CONTROLLER AND ALARMED. ALARM SETPOINT SHALL BE 4 DEG.F ABOVE THE COOLING SETPOINT. B.ELEVATOR MACHINE ROOM DUCTLESS SPLIT SYSTEM: THE HEAT PUMP SHALL OPERATE 24/7 AND SHALL BE CONTROLLED BY STANDALONE THERMOSTAT. THE COOLING SETPOINT SHALL BE 80 DEG.F AND THE HEATING SETPOINT SHALL BE 55 DEG.F (USER ADJUSTABLE, REVISE AS REQUIRED BASED ON USER REQUIREMENTS). TEMPERATURE IN THE ELEVATOR CONTROL/MACHINE ROOM SHALL BE MONITORED BY THE VRF CONTROLLER AND ALARMED. ALARM SETPOINT SHALL BE 4'F ABOVE THE COOLING SETPOINT AND 4 DEG.F BELOW THE HEATING SETPOINT. C.VRF HEAT RECOVERY HEAT PUMP: THE HEAT PUMP SHALL OPERATE 24/7, AND SHALL BE CONTROLLED BY DDC. THE HEAT PUMP SHALL OPERATE IN OCCUPIED MODE FROM 7AM TO 7:00 PM (USER ADJUSTABLE), AND SHALL OPERATE IN UNOCCUPIED MODE ON WEEKENDS AND FROM 7:00 PM TO 7 AM (USER ADJUSTABLE). THE SETPOINT RANGE SHALL BE 55 - 85 DEG.F WITH AN ADJUSTABLE DEADBAND OF NOT LESS THAN 5 DEG.F. THE COOLING SHALL BE STAGED ON/OFF TO MAINTAIN 73 DEG F (USER ADJUSTABLE). THE HEATING SHALL BE STAGED ON/OFF TO MAINTAIN 68 DEG. F. (USER ADJUSTABLE). THE SETBACK TEMPERATURE SETPOINT SHALL BE 85 DEG.F FOR COOLING AND 60 DEG.F FOR HEATING (USER ADJUSTABLE). THE UNOCCUPIED TEMPERATURE SETPOINT SHALL BE 85 DEG.F FOR COOLING AND 60 DEG.F FOR HEATING (USER ADJUSTABLE). D. OFFICE VENTILATION (DOAS-1): THE DOAS SERVING THIS SPACE SHALL RUN CONTINUOUSLY DURING OCCUPIED MODE AND SHALL SHUT-OFF AND CLOSE MOTORIZED DAMPERS DURING UNOCCUPIED MODE. THE FOLLOWING POINTS SHALL BE CONTROLLED/MONITORED BY THE VRF CONTROLLER: DOAS START/STOP, DOAS STATUS, DOAS ALARM, SUPPLY AIR TEMPERATURE, SUPPLY AIR HUMIDITY, RETURN AIR TEMPERATURE, RETURN AIR HUMIDITY, OUTSIDE AIR TEMERPATURE, OUTSIDE AIR HUMIDITY. THE VRF CONTROLLER SHALL DISPLAY AND TREND ALL ANALOG INPUTS AND THE DOAS ALARM. THE VRF CONTROLLER SHALL DISPLAY DOAS START/STOP AND DOAS STATUS. E. MAINTENANCE BAYS/SHOP VENTILATION (DOAS-2): TH DOAS SERVING THIS SPACE SHALL RUN CONTINUOUSLY DURING OCCUPIED MODE AND SHALL SHUT-OFF AND CLOSE MOTORIZED DAMPERS DURING UNOCCUPIED MODE. THE FOLLOWING POINTS SHALL BE CONTROLLED/MONITORED BY THE VRF CONTROLLER: DOAS START/STOP, DOAS STATUS, DOAS ALARM, SUPPLY AIR TEMPERATURE, SUPPLY AIR HUMIDITY, RETURN AIR TEMPERATURE, RETURN AIR HUMIDITY, OUTSIDE AIR TEMERPATURE, OUTSIDE AIR HUMIDITY. THE VRF CONTROLLER SHALL DISPLAY AND TREND ALL ANALOG INPUTS AND THE DOAS ALARM. THE VRF CONTROLLER SHALL DISPLAY DOAS START/STOP AND DOAS STATUS. F. MAINTENANCE BAYS/SHOP EXHAUST FAN (EF-2) AND MAKEUP AIR UNIT (MAU-1): THE EXHAUST FAN AND MAKEUP AIR UNIT SHALL OPERATE SIMULTANEOUSLY AND TURN ON AUTOMATICALLY UPON CO OR NO2 DETECTION OR WHEN THE MANUAL SWITCH IS ACTIVATED. THE FOLLOWING POINTS SHALL BE CONTROLLED/MONITORED BY THE VRF CONTROLLER: EF-2 START/STOP, EF-2 STATUS, EF-2 ALARM, CO LEVEL (AI), NO2 LEVEL(AI), MANUAL OVERRIDE SWITCH (ON/OFF). MUA-1 START/STOP, MUA-1 STATUS, MUA-1 ALARM, MUA-1 SUPPLY AIR TEMPERATURE. THE VRF CONTROLLER SHALL DISPLAY AND TREND ALL ANALOG INPUTS (CO LEVEL AND NO2 LEVEL) AND ALARMS. THE VRF CONTROLLER SHALL DISPLAY MUA-1 START/STOP, EF-2 START/STOP, MUA-1 STATUS, AND EF-2 STATUS. UPON DETECTION OF HIGH CO OR NO2 LEVEL, MUA-1 AND EF-2 SHALL BE ON FOR 30 MINUTES (USER ADJUSTABLE). THE MANUAL ON/OFF SWITCH SHALL HAVE GREEN LIGHT (ON)/RED LIGHT (OFF) AND SHALL BE CLEARLY LABLED WITH A PERMANENT LABEL. MUA-1 SHALL MODULATE SCR HEATER TO MAINTAIN 60 DEG.F SUPPLY AIR TEMPERATURE (ADJUSTABLE). G. ELECTRIC UNIT HEATERS & WALL HEATERS: STAGE TO MAINTAIN SPACE TEMPERATURE SETPOINT OF 70 DEG. F. STANDALONE CONTROL VIA T-STAT (ADJUSTABLE). H. ELECTRIC RADIANT HEATERS: STANDALONE CONTROL VIA MANUAL TIMER. THE MANUAL ON/OFF SWITCH SHALL HAVE GREEN LIGHT (ON)/RED LIGHT (OFF) AND SHALL BE CLEARLY LABLED WITH A PERMANENT LABEL. I. ELECTRICAL ROOM TRANSFER FAN (EF-1). STANDALONE CONTROL VIA T-STAT (AJUSTABLE) J. OVERHEAD FAN (CF-1): CONTROLLED BY AUTOMATIC TIMECLOCK SET FOR 1 HOUR OPERATION (ADJUSTABLE) ACKSON I MAIP RCHITECTUR 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 WWW.JACKSONMAI N.COM COFFMAN N G I N E E R S 1101 2nd Ave., Suite 400 1 Seattle, WA 98101 ph 206.623.0717 I fax 206.624.3775 coffman.com LASTING creativity I results I relationships RECEIVED Oct 14 2021 V ♦) QDEPARTMENT CITY OF EDMONDS DEVELOPMENT SERVICES z 0 0 G 0 U) L1J Q 00 C;) Uj � J Q LL o O (j' Q 0 z 0 Q Q O Lij J (y) 2E 0 U co uw v! 0 z CD o z C%) CD 0 W >- 00 OJr)��Q LL QQW z () 2i Qz N� LL � LJJ 0 Q O 000�ti0 Q O 0- t L1J J z o� I- D_ Co EE D Co U o � w o_ o z w � 04 N Lo Q o p 10/5121 PROJECT NO.: 210887 PROJECT MGR.: ON DRAWN BY: CEI CHECKED BY: ON GENERALNOTES M002 JACKSON I MAIN ARCHITECTURE P.S. © 2021 DEDICATED OUTSIDE AIR SYSTEM SCHEDULE SUPPLY FAN EXHAUST FAN ELECTRICAL POWER DESIGN OUTDOOR SUPPLY AIR SUMMER ROOM AIR WINTER / SUMMER WINTER /SUMMER FILTERS OPER WT MARK LOCATION MAKE / MODEL SERVICE AIR TEMP (DEG F) TEMP DB (DEG F) TEMP SENS. LATENT EFFECTIVENESS SUPP. FAN FAN EXH. FAN FAN POWER (SUPPLY NOISE d6 . (LBS) REMARKS CFM ESP CFM ESP WINTER SUMMER / WINTER SUMMER / DB / RH (DEG F) EFFECTIVENESS (BHP / HP) POWER (BHP / HP) (W/CFM) FLA MCA VOLTS PH HZ TYPE RETURN) ) (W/CFM) DOAS-1 221 EQUIP PLATFORM SWEGON / GOLD F RX OFFICE VENTILATION 730 0.20 860 0.21 25DB / 85DB/67WB 63.8 / 76.4 75 / 50% 86.3% /86.3% 51.8% / 0% 0.20 / 1.54 0.18 0.30 / 1.54 0.22 11.9 13.3 220 3 60 NORMAL MERV-13 48 732 1,2,4,5,E DOAS-2 221 EQUIP PLATFORM ALDES E1100L-FI-EC MAINTENANCE BAY 845 0.50 845 0.50 25DB / 85DB/67WB 54 / 79 75 / 50% 64.8% / 64.8% 44.1% / 31.2% - / 0.456 0.4 - / 0.456 0.4 6.0 6.4 208 1 60 NORMAL MERV 8 204 1,2,3,5,6,7 VENTILATION NOTES: 1. UNIT SHALL BE ON 24/7. PROVIDE BMS CAPABILITY TO INTERFACE TO OWNER'S DDC SYSTEM USING BACNET IP PROTOCOL. 2. PROVIDE VFD FOR EACH FAN, AND FACTORY WIRED SERVICE OUTLET. 3. UNIT SHALL BE HANGING FROM STRUCTURE ABOVE. 4. UNIT TO BE LOCATED ON STEEL RAILS WITH NEOPRENE PADS. 5. PROVIDE SEISMIC RESTRAINT CALCULATIONS AND ANCHOR DETAILS AS A DEFERRED SUBMITTAL FOR ALL EQUIPMENT OVER 400 LBS. 6. PROVIDE WITH DEFROST MODE. 7. PROVIDE WITH CO AND N2 SENSORS. UNIT TO OPERATE WHEN CO OR N2 IS DETECTED, OR WHEN MANUAL OVERRIDE SWITCH IS ACTIVATED. VRF FAN COIL UNIT SCHEDULE MARK LOCATION BASIS OF DESIGN MODEL NO. FAN COIL TYPE SUPPLY CFM ESP RATED / MAX (IN WG) COOLING (TOT) MBTUH COOLING (SENS) MBTUH HEATING MBTUH PIPE SIZES ASSOC. CU ASSOC. HRU ELECTRICAL WEIGHT LBS. REMARKS V/PH/HZ MCA POWER TYPE FCU-01 100 LOBBY MITSUBISHI TPLFYPO05FM 1 40A CASSETTE 4WAY 280 - 4,976 4,374 4,065 SEE TREE DIAGRAM CU-1 HRU-01 208/1/60 0.24 NORMAL 34 1-10 FCU-02 108 SUPERVISOR OFFICE MITSUBISHI TPLFYPO05FM 1 40A CASSETTE 4WAY 280 - 4,976 4,374 4,065 SEE TREE DIAGRAM CU-1 HRU-01 208/1/60 0.24 NORMAL 34 1-10 FCU-03 200 LOBBY MITSUBISHI TPLFYPO05FM 1 40A CASSETTE 4WAY 280 - 4,976 4,374 4,065 SEE TREE DIAGRAM CU-1 HRU-01 208/1/60 0.24 NORMAL 34 1-10 FCU-04 201 OFFICE 1 MITSUBISHI TPLFYP024EM 1 40A CASSETTE 4WAY 812 - 23,883 16,814 19,597 SEE TREE DIAGRAM CU-1 HRU-01 208/1/60 0.54 NORMAL 66 1-10 FCU-05 202 OFFICE 2 MITSUBISHI TPLFYPO 1 2FM 1 40A CASSETTE 4WAY 335 - 10,490 7,447 8,344 SEE TREE DIAGRAM CU-2 HRU-02 208/1/60 0.29 NORMAL 37 1-10 FCU-06 203 OFFICE 3 MITSUBISHI TPLFYPO 1 2FM 1 40A CASSETTE 4WAY 335 - 10,490 7,447 8,344 SEE TREE DIAGRAM CU-2 HRU-02 208/1/60 0.29 NORMAL 37 1-10 FCU-07 204 OFFICE 4 MITSUBISHI TPLFYPO 1 2FM 1 40A CASSETTE 4WAY 335 - 10,490 7,447 8,344 SEE TREE DIAGRAM CU-2 HRU-02 208/1/60 0.45 NORMAL 37 1-10 FCU-08 205 OFFICE 5 MITSUBISHI TPLFYPO 1 2FM 1 40A CASSETTE 4WAY 335 - 10,490 7,447 8,344 SEE TREE DIAGRAM CU-2 HRU-02 208/1/60 0.45 NORMAL 37 1-10 FCU-09 206 OFFICE 6 MITSUBISHI TPLFYPO18EM141A CASSETTE 4WAY 636 - 15,734 12,560 12,361 SEE TREE DIAGRAM CU-2 HRU-02 208/1/60 0.54 NORMAL 37 1-10 FCU-10 209 ARCHIVE ROOM MITSUBISHI TPEFYPO15MH142A DUCT HIGH STATIC 494 1.00 13,112 9,953 10,507 SEE TREE DIAGRAM CU-2 HRU-02 208/1/60 0.52 NORMAL 98 1-10 FCU-11 216 BREAK ROOM MITSUBISHI TPLFYP030EM 1 40A CASSETTE 4WAY 812 - 26,224 19,619 21,014 SEE TREE DIAGRAM CU-2 HRU-02 208/1/60 1.09 NORMAL 66 1-10 FCU-12a 218 COMMISSION MTG MITSUBISHI TPLFYPO 1 5FM 1 40A CASSETTE 4WAY 390 - 14,927 9,860 12,339 SEE TREE DIAGRAM CU-1 HRU-01 208/1/60 0.58 NORMAL 37 1-10 FCU-12b 218 COMMISSION MTG MITSUBISHI TPLFYPO 1 5FM 1 40A CASSETTE 4WAY 390 - 14,927 9,860 12,339 SEE TREE DIAGRAM CU-1 HRU-01 208/1/60 0.58 NORMAL 37 1-10 FCU-13 217 LEASABLE OFFICE (FUTURE) MITSUBISHI TPLFYP024EM 1 40A CASSETTE 4WAY 812 - 23,883 16,814 19,597 SEE TREE DIAGRAM CU-1 HRU-01 208/1/60 0.54 NORMAL 66 11 NOTES: 1. COOLING/HEATING CAPACITY LISTED IN SCHEDULE IS FAN COIL RATED CAPACITY. 2. VRF FAN COIL UNITS DO NOT REQUIRE ECONOMIZERS PER C403.5 EXCEPTION 3. 3. SEE "TREE" DIAGRAM ON DESIGN DOCUMENTS FOR REQUIRED REFRIGERANT PIPE SIZING. 4. FAN COILS TO HAVE DRAIN PAN AND INTEGRAL CONDENSATE PUMP. INTEGRAL CONDENSATE SWITCH PROVIDED TO PREVENT CONDENSATE OVERFLOW CONDITIONS. 5. PROVIDE FILTERS. FOR DUCTED UNITS, PROVIDE FBH SERIES FILTER BOX WITH UNIT. 6. MC AND VENDOR TO VERIFY SYSTEM REFRIGERANT CHARGE CAPACITY BASED ON FINAL EQUIPMENT LAYOUT. 7. PROVIDE SEISMIC RESTRAINT CALCULATIONS AND ANCHOR DETAILS AS A DEFERRED SUBMITTAL FOR ALL EQUIPMENT OVER 400 LBS. 8. UNITS SMALLER THAN 2,000 SUPPLY CFM TO BE SHUT DOWN VIA BAS SIGNAL UPON SMOKE DETECTION EVENT. UNITS LARGER THAN 2,000 CFM TO BE SHUT DOWN VIA FIRE ALARM SYSTEM UPON SMOKE DETECTION EVENT. 9. MINIMUM FIRST SIX FEET OF DUCT ON SUPPLY AND RETURN CONNECTED TO A DUCTED FAN COIL UNIT TO BE SOUNDLINED. 10. PROVIDE REMOTE WIRED PROGRAMMABLE THERMOSTAT AT EACH ZONE. 11. SHOWN FOR COORDINATION PURPOSES ONLY (FUTURE). MAKE-UP AIR UNIT SCHEDULE MARK SERVICE LOCATION FAN FAN MOTOR ELECTRICAL HEATING SECTION FILTERS BASIS OF DESIGN REMARKS CFM (TSP IN. WG) (ESP IN. WG) BHP RPM HP RPM V PH MCA MOP DISC[1] POWER TYPE KW EAT 'F LAT 'F QTY EFF SIZE (IN) MAKE MODEL LxWxH (IN) WEIGHT - LBS MAU-1 MAINTENANCE BAY & MAINTENANCE SHOP EQUIPMENT PLATFORM 221 1965 1.201 1 0.85 3377 1 3600 208 3 105 110 NO NORM ELECTRIC 28.6 24 70 4 MERV-8 16x2Ox2 GREENHECK MSX-P109-H12-MF 131" x 34" x 39" 1,097 1,2,3,4,5,6,7,8,9 NOTES: [1] YES = DISCONNECT PROVIDED BY MANUFACTURER; NO = DISCONNECT PROVIDED BY ELECTRICAL 2. CONFIGURE UNIT FOR RIGHT-HAND ACCESS, OUTSIDE AIR INTAKE FROM END OF UNIT, DISCHARGE FROM TOP 3. UNIT TO BE LOCATED ON STEEL RAILS WITH SPRING ISOLATION DAMPERS 4. FAN MOTOR SHALL MEET ALL APPLICABLE REQUIREMENTS OF THE 2018 WSEC 5. PROVIDE DRY CONTACT INTERLOCK AND CONTROL UNIT TO OPERATE IN CONJUNCTION WITH EXHAUST FAN EF-2 6. PROVIDE UNIT WITH VFD 7. PROVIDE SEISMIC RESTRAINT CALCULATIONS AND ANCHOR DETAILS AS A DEFERRED SUBMITTAL FOR ALL EQUIPMENT OVER 400 LBS. 8. UNIT SHALL BE SUPPLIED WITH A FACTORY INSTALLED C CHANNEL 10" BASE RAIL FOR HOUSEKEEPING PAD INSTALLATION 9. PROVIDE HEATER WITH SCR CONTROL SPLIT SYSTEM HEAT PUMP SCHEDULE TAG LOCATION SERVICE NOMINAL TON SEER HSPF AIRFLOW (CFM) COOLING CAPACITY (BTU/HR) HEATING CAPACITY (BTU/HR) ELECTRICAL WEIGHT CU / (LBS) FCU BASIS OF DESIGN SOUND POWER (dB) REMARKS VOLTS PH MCA MOP CONDENSING UNIT FAN COIL UNIT SS-01 SOUTH EXTERIOR WALL ELEVATOR MACHINE RM 2.0 21.4 11 775 24,059 16,757 208 1 19 26 153 / 46 TRUZA0241HA70NA TPKAOA0241KA70A 47 1-7 SS-02 SOUTH EXTERIOR WALL SERVER RM 2.0 21.4 11 775 24,059 16,757 208 1 19 26 153 / 46 TRUZA0241HA70NA TPKAOA0241KA70A 47 1-7 NOTES: 1. DISCONNECT BY ELEC CONTRACTOR. 2. INDOOR UNIT IS POWERED BY OUTDOOR UNIT. 2. NO ECONOMIZER PROVIDED PER WSEC EXCEPTION 11 SECTION C403.5. HEAT PUMP MINIMUM EFFICIENCY IS 14.0 SEER PER SEC TABLE C403.3.2(2). TO MEET EXCEPTION 11, 14.0 SEER + 15% MORE EFFCIENT = 16.1 SEER MINIMUM. 3. NO OUTSIDE AIR VENTILATION - EQUIPMENT ROOM/UNOCCUPIED SPACE. 4. PROVIDE WITH THERMOSTAT ACCESSORY: MITSUBISHI/TRANE TAR-40MAAU REMOTE CONTROLLER. 5. PROVIDE BLUE DIAMOND MAXIBLUE CONDENSATE PUMP WITH RESEVOIR & SENSOR (208V). 6. TOTAL REFRIGERANT CHARGE TO BE VERIFIED BY MECHANICAL CONTRACTOR AND EQUIPMENT MANUFACTURER BASED ON FINAL PIPING LAYOUT. 7. MAXIMUM REFRIGERANT PIPE LENGTH OF 165 FT BETWEEN CONDENSING AND FAN COIL UNIT. SUPPLY, RETURN, EXHAUST, AND RELIEF AIR DUCTWORK INSULATION PER TABLE C403.10.1.2 - 2018 WSEC MINIMUM CLIMATE INSTALLED DUCT SYSTEM DUCT LOCATION AND USE ZONE DUCT NOTES INSULATION R-VALUE (a,b) WITHIN CONDITIONED SPACE WHERE THE 4C AND SUPPLY AIR SUPPLY DUCT CONVEYS AIR THAT IS 5B NONE 55'F OR GREATER AND 105'F OR LESS WITHIN CONDITIONED SPACE, RETURN OR DOWNSTREAM OF AN ENERGY RECOVERY 4C R-8 EXHAUST AIR MEDIA, UPSTREAM OF AN AUTOMATIC SHUTOFF DAMPER a. Insulation R-values, measured in h•ft-2� F/Btu, are for the insulation as installed and do not include film resistance. The required minimum thicknesses do not consider water vapor transmission and possible surface condensation. Insulation resistance measured on a horizontal plane in accordance with ASTM C518 at a mean temperature of 75'F at the installed thickness. b. See international Mechanical Code Sections 603.12 and 604 for further details on duct insulation requirements c. Includes attics above inulated ceilings, parking garages and crawl spaces OUTDOOR AIR DUCTWORK INSULATION PER TABLE C403.10.1.1 - 2018 WSEC MINIMUM INSTALLED DUCT DUCT LOCATION AND CLIMATE AIRFLOW DUCT SYSTEM USE ZONE INSULATION R-VALUE (a,b) NOTES OUAIROR I INSIDE SPACE I 4C5BND I < 28CFM I R-7 I C403.1 ADDITIONAL 018DETAILS C SEE EXCEPTION 1 TO SECTION a. Insulation R-values, measured in h•ft-2� F/Btu, are for the insulation as installed and do not include film resistance. The required minimum thicknesses do not consider water vapor transmission and possible surface condensation. Insulation resistance measured on a horizontal plane in accordance with ASTM C518 at a mean temperature of 75'F at the installed thickness. b. See International Mechanical Code Sections 603.12 and 604 for further details on duct insulation requirements. WSEC DOAS REQUIREMENTS DOAS-1 IS REQUIRED FOR THE OFFICE SPACE (B OCCUPANCY) PER 2018 WSEC C403.3.5. DOAS-1 ALSO MEETS THE REQUIREMENTS OF C406.7 HIGH PERFORMANCE DOAS WITH A SENSIBLE EFFECTIVENESS > 80 PERCENT AND TOTAL FAN POWER < 0.5 W/CFM (SEE CALC BELOW). THE MAINTENANCE BAYS (S-1 OCCUPANCY) ARE NOT REQUIRED TO BE SERVED BY A DOAS PER C403.3.5 BUT THE PROJECT IS PROPOSING TO USE DOAS-2, MEETING THE REQUIREMENTS OF C406.6 (NOTE: DOAS-2 DOES NOT MEET THE REQUIREMENTS OF C406.7). PROVIDING A DOAS WITH ENERGY RECOVERY IN THIS SPACE STILL EXCEEDS THE MINIMUM REQUIREMENTS OF THE CODE. THE HIGH PERFORMANCE OF DOAS-1 AND THE ADDITION OF DOAS-2 FOR THE S-1 OCCUPANCY EARNS THIS PROJECT 4 CREDITS FOR SECTION C406. DOAS-1 TOTAL COMBINED FAN POWER CALCULATION: SUPPLY FAN - ELECTRIC POWER TO MOTOR 1 0.27 HP 199 W EXHAUST FAN - ELECTRIC POWER TO MOTOR 1 0.18 HP 132 W TOTAL POWER TO ALL FAN MOTORS 331 W CFM OF OUTDOOR AIR 730 CFM TOTAL COMBINED FAN POWER 0.45 W/CFM (<0.5 W/CFM) II0LI.1WA0) 0 Well] I:11z1:1110lyl�EYi11119:Za11[dl]FA1Ci]►F SUPPLY FAN - ELECTRIC POWER TO MOTOR(2) 0.456 HP 335 W EXHAUST FAN - ELECTRIC POWER TO MOTOR(2) 0.456 HP 335 W TOTAL POWER TO ALL FAN MOTORS 670 W CFM OF OUTDOOR AIR 845 CFM TOTAL COMBINED FAN POWER 0.79 W/CFM (<1.0 W/CFM) NOTES: (1) ELECTRIC POWER TO MOTOR PROVIDED BY SWEGON FOR USE IN SPECIFIC FAN POWER CALCULATION. MOTOR POWER IN HP PROVIDED BY ALDES. iT/ ACKSON I MAI RCHITECTUR 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 WWW.JACKSONMAI N.COM COFFMAN N G I N E E R S 1101 2nd Ave., Suite 400 1 Seattle, WA 98101 ph 206.623.0717 I fax 206.624.3775 coffman.com LASTING creativity I results I relationships LL 0 N� L.L 0 0- 0 Z 0 0 LU LL 0 RECEIVED Oct 14 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT N U) Q Co w > O J Q 0 Q 0 0� U) Q-0 z<0 w Q Ucc)LU W U) O w >- � Q 0 0 J Q U) U0 <0 Oaf � 0 0- IZI- w J z o H ~ o m D U U ~ U) W o � W a- d z W I- N � j Q o 21 PROJECT NO.: 210887 PROJECT MGR.: ON DRAWN BY: CEI CHECKED BY: ON SCHEDULES JACKSON I MAIN ARCHITECTURE P.S. © 2021 ASHRAE 62.1 VENTILATION CALC ROOM NAME OCCUPANCY CLASSIFICATION AREA (Az) [SF] OCCUPANT DENSITY [#/1000 SF] PEOPLE OA RATE R [CFM/PERSON] AREA OA RATE (Ra) [CFM/SF] OCCUPANTS BASED ON DENSITY (Pz) DESIGN OCCUPANTS (Pz) TOTAL OA (VbzRaAz) + Ez (CLG) Ez (HTG) ZONE OA - (V z00bz/Ez) ZONE OA - (V z--=Vblz/Ez) OUTSIDE AIRFLOW BALANCING (CFM) EA RATE [CFM/SF OR PER FIXTURE] EXHAUST AIRFLOW BALANCING [CFM] 100 LOBBY OFFICE MAIN ENTRY LOBBIES 112 10 5 0.06 1 1.0 12 1.0 1.0 12 12 20 0 20 104A UNISEX RR RESTROOM 59 0 0 0 0 0.0 0 1.0 1.0 0 0 0 50 120 104B URINAL RR RESTROOM 29 0 0 0 0 0.0 0 1.0 1.0 0 0 0 50 60 105 CUSTODIAL STORAGE STORAGE ROOMS 186 0 0 0 0 0.0 22 1.0 1.0 22 22 25 0 106 ELEV MACHINE RM NO REQUIREMENT 106 0 0 0 0 0.0 0 1.0 1.0 0 0 0 0 107 PARTS CAGE STORAGE ROOMS 119 0 0 0 0 0.0 14 1.0 1.0 14 14 20 0 20 108 SUPERVISOR OFFICE OFFICE SPACE 202 5 5 0 1 2.0 22 1.0 1.0 22 22 25 0 109 ELEC NO REQUIREMENT 75 0 0 0 0 0.0 0 1.0 1.0 0 0 0 0 200 LOBBY OFFICE MAIN ENTRY LOBBIES 112 10 5 0.06 1 1.0 12 1.0 1.0 12 12 20 0 20 201 OFFICE 1 OFFICE SPACE 427 5 5 0.06 2 4.0 46 1.0 1.0 46 46 45 0 203 OFFICE 2 OFFICE SPACE 151 5 5 0.06 1 2.0 19 1.0 1.0 19 19 20 0 204 OFFICE 3 OFFICE SPACE 150 5 5 0.06 1 2.0 19 1.0 1.0 19 19 20 0 205 OFFICE 4 OFFICE SPACE 150 5 5 0.06 1 2.0 19 1.0 1.0 19 19 20 0 206 OFFICE 5 OFFICE SPACE 152 5 5 0.06 1 2.0 19 1.0 1.0 19 19 20 0 208 OFFICE 6 OFFICE SPACE 253 5 5 0.06 1 4.0 35 1.0 1.0 35 35 35 0 216 BREAK ROOM BREAKROOMS 251 50 5 0.12 13 6.0 60 1.0 1.0 60 60 60 0 80 219 STORAGE STORAGE ROOMS 115 0 0 0.12 0 0.0 14 1.0 1.0 14 14 20 0 211 AUDIT OFFICE SPACE 83 5 5 0.06 0 2.0 15 1.0 1.0 15 15 20 0 212 SERVER NO REQUIREMENT 91 0 0 0 0 0.0 0 1.0 1.0 0 0 0 0 213 MEN'S RR RESTROOM 67 0 0 0 0 0.0 0 1.0 1.0 0 0 0 50 120 214 WOMEN'S RR RESTROOM 67 0 0 0 0 0.0 0 1.0 1.0 0 0 0 50 120 215 CUSTODIAL JANITOR 36 0 0 0 0 0.0 0 1.0 1.0 0 0 0 1 60 209 ARCHIVE ROOM OFFICE SPACE 267 5 5 0.06 1 4.0 36 1.0 1.0 36 36 40 0 217 LEASEABLE OFFICE OFFICE SPACE 611 5 5 0.06 3 8.0 77 1.0 1.0 77 77 80 0 218 COMMISSION MEETING RM CONFERENCE/MEETING 719 1 50 5 0.06 36 32.0 203 1.0 1.0 203 1203 205 0 220 CORRIDOR CORRIDORS 537 0 0 0.06 0 0.0 32 1.0 1.0 32 32 35 0 240 730 860 VRF CONDENSING UNIT SCHEDULE UNIT SIZE SYSTEM ELECTRICAL SOUND WEIGHT MARK LOCATION CONNECTED FAN COIL UNITS MAKE MODEL REF. COP IEER (TONS) REFRIGERANT (LBS) VOLTS PH HZ MCA MOP POWER TYPE POWER (DB) (LBS) REMARKS CU-1 GROUND, SE CORNER OF SITE FCU-01, 02, 03, 04, 12a, 12b, 13 MITSUBISHI TURYE0963AN40AN 8 R410A 44.1 4.1 29.8 208 3 60 31 45.0 NORMAL 60 613 1-4 CU-2 GROUND, SE CORNER OF SITE FCU-05, 06, 07, 08, 09, 10, 11 MITSUBISHI TURYE0963AN40AN 8 R410A 38.7 4.1 29.8 208 3 60 31 45.0 NORMAL 60 613 1-4 NOTES: 1. TOTAL REFRIGERANT CHARGE TO BE VERIFIED BY MECHANICAL CONTRACTOR AND EQUIPMENT MANUFACTURER BASED ON FINAL PIPING LAYOUT. 2. VRF MANUFACTURER TO VERIFY 'VRF TREE", REFRIGERANT PIPING ROUTING, AND SIZES BASED ON FINAL SYSTEM LAYOUT. 3. UNITS TO BE LOCATED ON STEEL RAILS WITH NEOPRENE PADS. 4. PROVIDE SEISMIC RESTRAINT CALCULATIONS AND ANCHOR DETAILS AS A DEFERRED SUBMITTAL FOR ALL EQUIPMENT OVER 400 LBS. DIFFUSER AND GRILLE SCHEDULE MAXIMUM DUCT CONNECTION SIZE BASIS OF DESIGN MARK TYPE NECK SIZE NC DESIGN CFM REMARKS ROUND SQUARE MAKE MODEL CD-1 2424 SQUARE CEILING SEE PLANS 35 60 SEE PLANS - TITUS TJD REFER TO RCP DIFFUSER CD-2 2424 SQUARE CEILING SEE PLANS 25 350 SEE PLANS - TITUS MCD REFER TO RCP DIFFUSER SG-1 DUCT MOUNTED SUPPLY SEE PLANS 25 300 - SEE PLANS TITUS 350RL SURFACE MOUNT GRILLE SG-2 DUCT MOUNTED DRUM SEE PLANS 25 1000 - SEE PLANS TITUS DL SURFACE MOUNT LOUVER RG-1 DUCT MOUNTED RETURN SEE PLANS 25 500 - SEE PLANS TITUS 350RL SURFACE MOUNT GRILLE 24x24 CEILING RETURN RG-2 GRILLE, STEEL SEE PLANS 25 990 - SEE PLANS TITUS 50F REFER TO RCP 248 CEILING RETURN RG-3 GRILLE, STEEL SEE PLANS 25 620 - SEE PLANS TITUS 50F REFER TO RCP 12x12 CEILING RETURN RG-4 GRILLE, STEEL SEE PLANS 25 700 - SEE PLANS TITUS 50F REFER TO RCP EG-1 DUCT MOUNTED EXHAUST SEE PLANS 25 500 - SEE PLANS TITUS 350RL SURFACE MOUNT GRILLE TG-1 6X6 CEILING TRANSFER SEE PLANS 25 150 - SEE PLANS TITUS 350RL SURFACE MOUNT GRILLE LOUVER SCHEDULE MARK SERVICE LOCATION SIZE CFM MAX. % FREE FREE AREA PRESSURE DROP BASIS OF DESIGN REMARKS WIDTH (IN) HEIGHT (IN) MAKE MODEL FPM AREA (SQ. FT.) (IN. H20) L-1 MAU-1 EQUIPMENT 26 26 1965 800 58% 2.7 0.08 RUSKIN ELF6375DXH 1 PLATFORM L-2 DOAS-2 OA EQUIPMENT 24 48 1575 800 54% 4.3 0.02 RUSKIN ELF6375DXH 1 PLATFORM L-3 DOAS-2 EA MAINTENANCE SHOP 24 48 1755 800 54% 4.3 0.02 RUSKIN ELF6375DXH 1 L-4 EF-2 MAINTENANCE SHOP 26 26 1965 800 58% 2.7 0.07 RUSKIN ELF6375DXH 1 L-5 KITCHEN EXHAUST BREAK ROOM 216 14 14 350 800 52% 0.7 0.03 RUSKIN ELF6375DXH 1 NOTES: L1] PROVIDE BIRD SCREEN. COORDINATE COLOR WITH ARCHITECT (UNLESS FIELD PAINTED). ELECTRIC HEATER SCHEDULE TAG AREA SERVED ELECTRICAL CONTROL BASIS OF DESIGN REMARKS VOLTS/PH WATTS EH-1 105 CUSTODIAL STORAGE 120/1 1000 THERMOSTAT KING PAW 1,2,3 EH-2 104A UNISEX RR 120/1 500 THERMOSTAT KING PAW 1,2,3 EH-3 111 FIRE RISER RM 120/1 500 THERMOSTAT KING PAW 1,2,3 EH-4 101 COMMERCIAL RETAIL 120/1 950 THERMOSTAT KING KBP 4 EH-5 101 COMMERCIAL RETAIL 120/1 950 THERMOSTAT KING KBP 4 EH-6 101 COMMERCIAL RETAIL 120/1 950 THERMOSTAT KING KBP 4 EH-7 104B URINAL RR 120/1 500 THERMOSTAT KING PAW 1,2,3 NOTES: 1. T-STATS TO BE BASIC KNOB -STYLE THERMOSTAT KING MODEL K101 OR EQUAL 2. T-STATS MOUNTED REMOTE FROM HEATER ON WALL NEAR DOOR TO ROOM 3. PROVIDE LOCKABLE COVER FOR T-STAT. 4. HEATER PROVIDED WITH BUILT-IN KNOB -STYLE THERMOSTAT. ELECTRIC RADIANT HEATER SCHEDULE MARK AREA SERVED MANUFACTURER AND MODEL INSTALLATION TYPE ELECTRICAL LSI W (ZE LBS) REMARKS KW VOLTS/PH EMERGENCY POWER ERH-1 SINGLE HT. MAINT. SHOP INDEECO STS INVIZATHERM CEILING MOUNT 3.0 208/1 NO 48" X 12" 38 1,2,3 ERH-2 SINGLE HT. MAINT. SHOP INDEECO STS INVIZATHERM CEILING MOUNT 3.0 208/1 NO 48" X 12" 38 1,2,3 ERH-3 SINGLE HT. MAINT. SHOP INDEECO STS INVIZATHERM CEILING MOUNT 3.0 208/1 NO 48" X 12" 38 1,2,3 ERH-4 SINGLE HT. MAINT. SHOP INDEECO STS INVIZATHERM CEILING MOUNT 3.0 208/1 NO 48" X 12" 38 1,2,3 ERH-5 SINGLE HT. MAINT. SHOP INDEECO STS INVIZATHERM CEILING MOUNT 3.0 208/1 NO 48" X 12" 38 1,2,3 ERH-6 SINGLE HT. MAINT. SHOP INDEECO STS INVIZATHERM CEILING MOUNT 3.0 208/1 NO 48" X 12" 38 1,2,3 ERH-7 DOUBLE HT. MAINT. BAY INDEECO STS INVIZATHERM CEILING MOUNT 4.0 208/1 NO 48" X 12" 38 1,2,3 ERH-8 DOUBLE HT. MAINT. BAY INDEECO STS INVIZATHERM CEILING MOUNT 4.0 208/1 NO 48" X 12" 38 1,2,3 ERH-9 DOUBLE HT. MAINT. BAY INDEECO STS INVIZATHERM CEILING MOUNT 4.0 208/1 NO 48" X 12" 38 1,2,3 ERH-10 DOUBLE HT. MAINT. BAY INDEECO STS INVIZATHERM CEILING MOUNT 4.0 208/1 NO 48" X 12" 38 1,2,3 ERH-11 DOUBLE HT. MAINT. BAY INDEECO STS INVIZATHERM CEILING MOUNT 4.0 208/1 NO 48" X 12" 38 1,2,3 ERH-12 j DOUBLE HT. MAINT. BAY j INDEECO STS INVIZATHERM j CEILING MOUNT j 4.0 1 208/1 j NO j 48" X 12" j 38 j 1,2,3 NOTES: 1. 2. 3. PROVIDE THERMOSTATS, INDEECO PART #R-102. LOCATIONS SHOWN ON PLANS. PROVIDE (1) INVIZATHERM WIRELESS CONTROLLER SWITCH PER EVERY 2 HEATERS. INDEECO PART #TZ-SWITCH. 120V. PROVIDE 1 INVIZATHERM Z-WAVE WIRELESS CONNECTION HUB TO SERVE ALL HEATERS. INDEECO PART TZ-HUB. VRF HEAT RECOVERY UNIT SCHEDULE MARK LOCATION ASSOCIATED MAKE MODEL REF. TYPE # OF PORTS ELECTRICAL WEIGHT COND. VOLTS PH HZ MCA MOCP POWER TYPE (LBS) REMARKS HRU-01 200 LOBBY CU-1 MITSUBISHI TCMBG1012SJ11N4 R410A 12 208 1 60 1.29 15 NORMAL 109 1,2,3,4 HRU-02 209 ARCHIVE RM CU-2 MITSUBISHI I TCMBG0108SJ11N4 R410A 8 208 1 60 0.87 15 NORMAL 73 1,2,4 NOTES: 1. SEE SYSTEM TREES FOR PIPING SIZES. 2. INSTALL BOX IN ACCESSIBLE LOCATION. PROVIDE MINIMUM ACCESS SERVICE AS REQUIRED BY MANUFACTURER. 3. INCLUDES OPEN PORTS FOR FLEXIBILTY. QUANTITY OF FAN COILS UNKNOWN FOR FUTURE LEASABLE OFFICE BUILD OUT. 4. PROVIDE WITH INTEGRAL CONDENSATE PUMP. FAN SCHEDULE FAN MOTOR DRIVE INLET WEIGHT TAG LOCATION AREA SERVED TYPE BASIS OF DESIGN REMARKS CFM RPM ESP HP VOLTS PH DBA LBS EF-1 109 ELEC ELECTRICAL RM 150 1,445 0.25 1/15 115 1 DIRECT GREENHECK SQ-70-VG 44 32 2,3,5,E EF-2 102 MAINT. BAY MAINTENANCE BAY & 1,965 1,869 0.75 1 208 3 DIRECT GREENHECK QEID-12 67 139 3,4,5,6,7 MAINTENANCE SHOP CF-1 102 MAINT. BAY MAINTENANCE BAY - 191 - 1 208 3 DIRECT BIG ASS FANS PF8-08 < 55 135 3,8 CF-2 103 MAINT. BAY MAINTENANCE SHOP 9,676 170 - 35.4W 208 1 DIRECT BIG ASS FANS PF8-08 < 35 34 3,8 CF-3 103 MAINT. BAY MAINTENANCE SHOP 9,676 170 - 35.4W 208 1 DIRECT BIG ASS FANS PF8-08 < 35 34 3,8 CF-4 103 MAINT. BAY MAINTENANCE SHOP 9,676 170 - 35.4W 208 1 DIRECT BIG ASS FANS PF8-081 < 35 34 3,8 NOTES: 1. PROVIDE DISCONNECT SWITCH, FAN TO OPERATE CONTINUOUSLY. 2. PROVIDE DISCONNECT SWITCH AND THERMOSTAT. REFER TO SEQUENCE OF OPERATIONS. 3. FAN MOTORS SHALL MEET 2018 WSEC. 4. PROVIDE WITH BACKDRAFT DAMPER. 5. PROVIDE WITH HANGING ISOLATORS, SPRING TYPE. 6. FAN TO HAVE 'VARI-GREEN" MOTOR WITH MANUAL SPEED POT. FOR BALANCING INSTALLED ON FAN. 7. PROVIDE DISCONNECT SWITCH. FAN TO BE CONTROLLED TO OPERATE WITH MAU-1 8. HEAVY-DUTY INDUSTRIAL CEILING FAN WITH 8FT DIAMETER. PROVIDE WITH STANDARD CONTROLLER. MANUAL ON/OFF AND VARIABLE SPEED CONTROL. 9. CEILING FAN, 60 INCH DIAMETER, INDOOR, STANDARD MOUNT, LESS LIGHT KIT, PROVIDE WITH 36 INCH DOWNROD, FIXED WALL MOUNT CONTROLLER. iT/ ACKSON I MAI RCHITECTUR 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 WWW.JACKSONMAI N.COM COFFMAN N G I N E E R S 1101 2nd Ave., Suite 400 1 Seattle, WA 98101 ph 206.623.0717 I fax 206.624.3775 coffman.com LASTING creativity I results I relationships RECEIVED Oct 14 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT LL 0 0 0 V Z 0 LL 0 N U� Q 00 LLJ 0 J >Q 0 Q 0U) Q 0 z<0 wQ� Ucc)LU W U) O w>_00 Q 0 0 J U) U0 <0 Oaf � 0 0-IZI-w J z o H ~ o Co Of D w o � w a_ o z W Q� N o p 21 PROJECT NO.: 210887 PROJECT MGR.: ON DRAWN BY: CEI CHECKED BY: ON SCHEDULES M004 JACKSON I MAIN ARCHITECTURE P.S. © 2021 SHEET NOTES: 1 2 3 4 5 5 36x14 INTAKE LOUVER 36x14 INTAKE LOUVER 2414 EXHAUST FOR FUTURE TI. SIZING FOR FUTURE TI. SIZING LOUVER FOR FUTURE BASED ON 45% FREE BASED ON 45% FREE TI. SIZING BASED ON AREA AREA 45% Fnrr enre FUTURE SPLIT ISYSTEM ZONE - f -- 74 5�24x14 EXHAUST II LOUVER FOR FUTURE TI. SIZING BASED ON 45% FREE AREA—\ COORDINATE HEATER LOCATION WITH FIRE SPRINKLER EQUIPMENT FUTURE RETAIL CU (WALL MOUNTED); FUTURE RETAIL CU (WALL MOUNTED); FUTURE RETAE-CU ON GROUND .X F_ O 7— CU-1 .1 BOLLARDS o (TYP) BY OTHERS TO CU-2 PROTECT MECHANICAL f0 EQUIPMENT. p Q 00 0 0 N O N N N OPEN TO M H STRUCTURE ABOVE 1 I FMIL -7 BOTTOM OF, EXHAUST GRILLE SHALL BE 24" In IzxIty 4BOVE=q+e FLOOR EG-1-- - - - - - � II 490 & 12" OEA UP TRANSFER GRILLE I 14" 0 Ell l i 10" 0 Rq--,, 6" 0 SAS I 11 �[Z:>[j SS-01 OUTDOOR UNIT (WALL f -8" MOUNTED); [2�::� SS-02 OUTDOOR DOUBLE HT. 1-8" UNIT (WALL "1IAINTENANCE MOUNTED BELOW); BAY (2) FUTURE RETAIL CU 102 II ON GROUND UNIT HEATERS FOR EH-3 FREEZE PROTECTION- ro OT I COMMERCIAL RETAIL 101 I FIRE RISER OPEN TO STRUCTURE. 1� 112 f�. N TO 10" ORA UP 12" OSA UP - ANGLE DIFFUSER BLADES DOWN TOWARDS FLOOR AND TOWARDS THE IDOOR DOUBLE HT. MAINTENANCE BAY (2) � 102 I OPEN �O STRUCTURE ABOVE HEATING AND VENTILATION � ONLY ZONE 12x6 SG-1 210 CFM 12" ORA- VRF & DOAS ZONE 24x14 EXHAUST LOUVER FOR FUTURE TI. SIZING BASED ON 45% FREE AREA--\ EH-5 OO .1 Idd o FCU01,- DOAS ONLY ZONE -. ,- OPEN TO % STRUCTURE I I „ �B4OVE OPEN TO N , „ JL S1Gl1TjJRE ABOVE- 14 OEA Uj 20 C INDOOR L b ART AGE T C� RP INDIVIDUAL SPLIT �_ 1 1 SYSTEM ZONE A UF 6110-4- 6x6 SG-1 1 C -1 I 20 CFM ELEV. I — _;J`�—.. II 6tA `MACHINE RP X;- " �I " E 5 FM PART CAGE � =40. r� 0 1 10 II -I : ,I T II -- : 1 »SEA;' DN 0"»_ 0 72X I?E1'4.' EA BOTTOM, • O, F 6°' - 1.2-1-0 =1 < 1EXFi�kUST=" - ERH.;� ��RG=.1 _ 12�c6 'RIL-LE "HALL t1�IR =2 ,4�0 -CFM ' SG-1 4II€4�T: 'BE 24-- A8OVE �$"ORA J.TEPJ,gNC1.2�E _ ;THE FLOOR _ ; = ET7 R 4,' 6 6 ZHU 2, SINGLE HT.,-12x1:0� ' 6» J " _ AINTENANCE. ? -210 'CFM G-1 ANGLE- D1FF,USER 1;03 : > , -• -. ',BLADES DOWN �. -_ .-_- - -I-� ,- ---_- �- --� �--,-�-�-� j--�_--,--•' _� �---,-'''---_,-�_;_,��-` ";_., - I OPEN TO STRO&UR A$OVt,' 8_ _ TOWARDS , FLOOR AN . 8 �CF-3 _ _ _, _ . .-TDVIrARDS' THE. DDOR - CUSTODIAL _ EH�_1 STORAGE ERE--1 : (TYP: ERA I L COORDINATE HEATER LOCATIONS WITH LIGHTING AND ROLLUP DOORS (TYP) LEVEL 1 HVAC PLAN SCALE: 3/16" = 1'-0" ,,,--36x14 INTAKE LOUVER FOR FUTURE TI. SIZING S�BASED ON 45% FREE AREA VRF & DOAS ZONE UNISEX R.R. 104 CUSTODIAL STORAGE 106 L COORDINATE HEATER LOCATION WITH SHELVING IN ROOM l�Jl1�l ACKSON I MAIf R C H I T E C T U R 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 WWW.JACKSONMAIN.COM �COFFMAN N G I N E E R S 1101 2nd Ave., Suite 400 1 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com LASTING creativity I results I relationships RECEIVED Oct 14 2021 QDEPARTMENT CITY OF EDMONDS DEVELOPMENT SERVICES Z O o 0 LU Q 00 W �JQ LL OQ3: O C/' Q 0 ~ ZOO Q O W JMD 2 UMLU V 0 Z CD O z Cn CVo �Dw>_00 C)J0��Q LL w�o�� B 0 Q Q z Z � 0 KEYNOTES: W � p Q 0 O00ti0 CONTRACTOR VERIFY ELEVATOR EQUIPMENT HEAT LOAD PRIOR TO ORDERING SPLIT SYSTEM Q 0— 'cl- W HEAT PUMP UNIT. ACTUAL HEAT LOAD HAS NOT YET BEEN RECEIVED. CONTRACTOR VERIFY SERVER ROOM HEAT LOAD PRIOR TO ORDERING SPLIT SYSTEM HEAT PUMP UNIT. ACTUAL HEAT LOAD HAS NOT YET BEEN RECEIVED. PROVIDE CO AND N2 SENSORS. INSTALL AT HEIGHT RECOMMENDED BY MANUFACTURER. ® PROVIDE MANUAL OVERRIDE SWITCH TO TURN ON EF-2 AND MAU-1. PROVIDE PERMANENT LABEL FOR THE MANUAL OVERRIDE SWITCH. RETAIL LOUVERS ARE SHOWN FOR COORDINATION PURPOSES ONLY (FUTURE). © RADIANT HEATER MOUNTED FROM CEILING/STRUCTURAL ABOVE WITH BOTTOM OF UNIT ELEVATION AT 11'-6". PROVIDE FIELD INSTALLED HEAT TRACED DRAIN PAN UNDERNEATH WALL MOUNTED CONDENSING UNITS TO KEEP DEFROST WATER FROM DRAINING ON THE UNIT BELOW. ® BOTTOM OF FAN ELEVATION 10'-3" AFF. INSTALL CEILING FAN PER MANUFACTURER'S REQUIRED CLEARANCES. MINIMUM CLEARANCES 12" FROM CEILING, 2FT ON SIDES FROM OBSTRUCTIONS, AMD 30" FROM WALL. COORDINATE FAN LOCATIONS WITH GARAGE DOOR A TRACKS, STRUCTURAL FRAMING, HEATERS, AND LIGHTING. J Z� o� ~ �Z) CO U U) w g o� w a— d� W N �LO Qo 0 ri PROJECT NO.: 210887 PROJECT MGR.: ON DRAWN BY: CEI CHECKED BY: ON LEVEL 1 HVAC PLAN JACKSON I MAIN ARCHITECTURE P.S. © 2021 SHEET NOTES: VRF & DOAS Z 20x 10 ( DOAS-2 24x 14 DOAS-1 L-1 26x CIA LOUV L-2 48) OA LOU\ PROVI MECHj EACH 241, DUCT (BEL L-3 48x2 EA LOUVEI L-4 26x2 EA LOUVE 1 2 3 4 5 VENTILATION ONLY ZONE - LEVEL 2 HVAC SCALE: 3/16" = 1'-0" PLAN KEYNOTES: CONTRACTOR VERIFY SERVER ROOM HEAT LOAD PRIOR TO ORDERING SPLIT SYSTEM HEAT PUMP UNIT. ACTUAL HEAT LOAD HAS NOT YET BEEN RECEIVED. 1200 SOUND LINED SHEET METAL TRANSFER ABOVE CEILING. INSTALL CEILING FAN PER MANUFACTURER'S REQUIRED CLEARANCES. MINIMUM CLEARANCE 4FT BELOW CEILING AND 2FT ON SIDES. ® RADIANT HEATER MOUNTED FROM CEILING/STRUCTURAL ABOVE WITH BOTTOM OF UNIT ELEVATION AT 21'-6". RADIANT HEATER WALL MOUNTED WITH BOTTOM OF UNIT ELEVATION AT 21'-6". ACKSON I MAIP RCHITECTUR 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 WWW.JACKSONMAIN.COM COFFMAN N G I N E E R S 1101 2nd Ave., Suite 400 1 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com LASTING creativity I results I relationships RECEIVED Oct 14 2021 V /1 QDEPARTMENT CITY OF EDMONDS DEVELOPMENT SERVICES z O o O W W O) W 0 J Q LL 0Q� O 0 `) Q ~ ZOO Q O W J�o � U cy) W U) 0 z(D O z U) CVO C 0 LLLJ >- 00 � W J � � � Q LL m 0 QQry J z () 2i U) 0 W0z Q 0 Q O 0� � 0- 0- t W J z o H ~ a m o: U) U U) W� o � w a O z WN Q U')p O 21 PROJECT NO.: 210887 PROJECT MGR.: ON DRAWN BY: CEI CHECKED BY: ON LEVEL 2 HVAC PLAN M1.2 JACKSON I MAIN ARCHITECTURE P.S. © 2021 SHEET NOTES: .9 SS-01 0 SS-0 T T4 2 EH-3 3/4"CD U FIRE RISER II 112 YF,N TO OPEN TO k(§2* M H STRUCTURE ABO 1 REF UP (TYP.) REF UP (TYP.) DOUBLE HT. MAINTENANCE BAY (2) 102 COMMERCIAL RETAIL 101 3/4"CD ROUTED TO STRUCTURE. TO FUNNEL FLOOR DRAIN IN MECH RM L3/4"CD M SL,ppE== DOUBLE HT. MAINTENANCE BAY (2) I 102 I OPEN ITO STRUCTURE ABOVE I I I I I I I I I I I I I I I I EH-5 3/4"CD UP 3/4"CD S TYP, 1 � - I VRF & DOAS ZONE DOAS ONLY ZONE OPEN TO STRUCTURE 3 (TYP� ABOVE STRUCTURE AOBR RU=OVE _ V II INDOOR I PART AG� _C � R� r------------- "- 1 1 _ = VRF & DOAS 1 t' ZONE �_ ___________= r' I ELEV. F II 1 4�--------------- E PARTS CAGE MACHINE RM. 0 j I URINAL A.' _ _.� •-, _� .._ �._" - -_ •. _-• �. .-••_ ' _-_�'-, -_ ',_- •_•-, ; �_-' � ,-_, ."_.-•..-�- -_-, ,.'�- I -� - �� '_ , -- -._ '_, .�- .,-,-_-'1-05 - - I°_-,_ - UNISEX R.R. ' • 'JISEX R.. - 104 -•_ .'-,_-, -. _ ,-'•-..-_ _- _-�"-_'-ERH-=�5.'_�-�,.'-.-- -' - -��. - :_''_•-..,--_;;_-. �-. —_.- - �I ,I=�..-•';-, - ERH-6""�� _ LT;k. =2 , --SINGLE HT: ,105,' ' -EM ; 4- MAINTENANCE,' , , ;sHO- -._•_-•.-'�••'•,.-- ":.-_. - "-.--;-_- '--•_-•�; �-_' •-�".-'_--_� -;__": • , � •--__"-_ -' '_- - - I �_ "St HT _ MAINTENANC OP. OPEN TO StRIlCTUF2 A$OV�,' CUSTODIAL -CUSTODIAL'. ._ . STORAGE CUSTODIAL _ 106 EH=-1"•.-STORAGE ; I ERH-1' ER 1-�." ERH-3 LEVEL 1 H SCALE: 3/16" = 1'-0" VAC PIPING PLAN KEYNOTES: ALL UNITS PROVIDED WITH INTEGRAL CONDENSATE PUMP. CONDENSATE TO BE PUMPED UP AS HIGH AS POSSIBLE IN CEILING SPACE THEN DRAINED BY GRAVITY TO DRAIN OR MOP SINK AS SHOWN. REFRIGERANT PIPE ROUTING SHOWN FOR CONCEPTUAL PURPOSES ONLY. REFER TO VRF PIPING TREES ON SHEET M2.2 FOR MORE DETAILS. 2 REF. PIPES ARE ROUTED FROM HRU TO EACH FCU BUT ONLY ONE PIPE SHOWN HERE FOR CLARITY. ACKSON I MAIP RCHITECTUR 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 WWW.JACKSONMAIN.COM COFFMAN N G I N E E R S 1101 2nd Ave., Suite 400 1 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com LASTING creativity I results I relationships RECEIVED Oct 14 2021 V /1 QDEPARTMENT CITY OF EDMONDS DEVELOPMENT SERVICES z O o G 00 � W Q � 0)W J Q LL QQ� O Q0�U) Q - Q z Q Q Q W J�Q 2 U co LUw U) 0 z(D Z .. C7 o N C� G W >- co J � � � Q W LL m Q QQQ) J Z () � Q CC G W Q Q Z O � Q O � ti � Q 0-W J z o� H F_ �m U U) H w 2 o� w a z WN Q U') p O 21 PROJECT NO.: 210887 PROJECT MGR.: ON DRAWN BY: CEI CHECKED BY: ON LEVEL 1 HVAC PIPING PLAN M1 3 ■ JACKSON I MAIN ARCHITECTURE P.S. © 2021 SHEET NOTES: VRF & D0/ 1 2 3 4 5 LEVEL 2 HVAC PIPING PLAN SCALE: 3/16" = 1'-0' O KEYNOTES: ALL UNITS PROVIDED WITH INTEGRAL CONDENSATE PUMP. CONDENSATE TO BE PUMPED UP AS HIGH AS POSSIBLE IN CEILING SPACE THEN DRAINED BY GRAVITY TO DRAIN OR MOP SINK AS SHOWN. CONDENSATE FOR FUTURE UNITS IN LEASABLE OFFICE TO BE ROUTED TO TAILPIECE OF SINK OR LAV LOCATED IN LEASABLE OFFICE SPACE. REFRIGERANT PIPE ROUTING SHOWN FOR CONCEPTUAL PURPOSES ONLY. REFER TO VRF PIPING TREES ON SHEET M2.2 FOR MORE DETAILS. ® ALL 3 REF PIPES FOLLOW SAME ROUTE BUT ONLY ONE PIPE IS SHOWN HERE FOR CLARITY. 2 REF PIPES ARE ROUTED FROM HRU TO EACH FCU BUT ONLY ONE PIPE SHOWN HERE FOR CLARITY. © REF PIPING ROUTED TO LEVEL 2 FCU'S. REFER TO VRF PIPING TREE ON SHEET M2.2. RECEIVED Oct 14 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CD Z_ 0 J m ACKSON I MAI RCHITECTUR 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 WWW.JACKSONMAIN.COM COFFMAN N G I N E E R S 1101 2nd Ave., Suite 400 1 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com LASTING creativity I results I relationships V 0 Z 0 L LL 0 0 0- LL 0 O Q CO L 0 Q U) Q � � z�0 L Q UcciLU U) o w>-co ��Q0 0 J ry Q) U0 <0 Oaf 0— IZI- L J z o_ H F- ~ � m U U) H w o � w a O z WN Q U') p O 21 PROJECT NO.: 210887 PROJECT MGR.: ON DRAWN BY: CEI CHECKED BY: ON LEVEL 2 HVAC PIPING PLAN M1.4 JACKSON I MAIN ARCHITECTURE P.S. © 2021 ')HEET NOTES: - - W14x38 E 1111111242 E 2 SOUTH ELEVATION VIEW M2.1 SCALE: 1/4" = 1'-0" .O. STRUCT. ROOF 37'-411 LEVEL02 29'-011 B.O. STRUCT. L 02 27'-3" LEVEL 01 14'-A� 011 KEYNOTES: PROVIDE FIELD INSTALLED HEAT TRACED DRAIN PAN UNDERNEATH WALL MOUNTED CONDENSING UNITS TO KEEP DEFROST WATER FROM DRAINING ON THE UNIT BELOW. ACKSON I MAIP RCHITECTUR 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 WWW.JACKSONMAIN.COM COFFMAN N G I N E E R S 1101 2nd Ave., Suite 400 1 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com LASTING creativity I results I relationships RECEIVED Oct 14 2021 V /1 QDEPARTMENT CITY OF EDMONDS DEVELOPMENT SERVICES Z O o O p w � co rn w 0 J Q LL 0Q� O 0 `) Quo ~ zoo � O wQ� J�o U co w C) 0 Z CD O z U) CVO Caw> -co �J��Q w � LL EnQQ� 00 J z () � 2i Q w0-) < z z 00 0 �tio 2 �Q 0- tw J Z O H ~ d m U U) U) ~ w m � w o� z WN Q U')p O 21 PROJECT NO.: 210887 PROJECT MGR.: ON DRAWN BY: CEI CHECKED BY: ON SECTIONS AND ELEVATIONS M201 JACKSON I MAIN ARCHITECTURE P.S. © 2021 CITY MUL MIGRAM SYMBOL LEGEND DISPLAY RIP N MEAD Rk I SYSTEM SCHEMATIC DWG. POWER WIRE RER PIPE soe—a3ovjso1k FUse PIPING AND CONTROLS SYMBOL BRANCH PIPE MODEL NAME J 1 CMY-R301 S-G SYMBOL LIQUID PIPEIGAS PIPE SIZE P1 114 1112 P2 318 1518 P3 1314 1718 SYMBOL MODEL NUMBER MA TAR-40MAAU ow n-2 1 N ?A8-2 FMi P3 CU-1 TU RYE0963AN40AN [CU-1 ] uu� 051 \S/ J1 HRU-01 TCMBG1012SJ11 N4 052 SW4 Function 935 OFF LLL P1 P1 P1 P2 P1 P1 N N F N N F N N TPLFYPO05FM140A TPLFYPO05FM140A TPLFYPO05FM140A TPLFYP024EM140A TPLFYPO15FM140A TPLFYPO15FM140A TPLFYP024EM140A . .. .. .. .. .. .. . .FCU-01 ..FCU-02 ..FCU-03 ..FCU-04 ..FCU-12a ..FCU-12b ..FCU-13 NOTE: PIPING TREE PROVIDED FOR PRELIMINARY INFORMATION ONLY. VRF MANUFACTURER SHALL PROVIDE ACTUAL TREE USED FOR PIPING SIZING INSTALLATION BASED ON ACTUAL FIELD LENGTHS AND ELBOWS. 208-230N/M FUSE P3 J1 �J HRU-02 �./ TCMBG0108SJ11N4 CU-2 TU RYE0963AN40AN [CU-2] SW4 Function 935 OFF �P1 _1P1 P1 P2 N N F___1 N 1 1 Gp10 Gp11 Gp12 Gp13 Gp14 Gp15 Gp16 TPLFYPO12FM140A TPLFYPO12FM140A TPLFYPO12FM140A TPLFYPO12FM140A TPLFYPO18EM141A TPEFYPO15MH142A TPLFYP030EM140A .. .. .. .. .. .. . .FCU-05 ..FCU-06 ..FCU-07 ..FCU-08 ..FCU-09 ..FCU-10 ..FCU-11 VRF SYSTEM PIPING & WIRING SCHEMATIC SCALE: NO SCALE NJ I ivl ACKSON I MAIP RCHITECTUR 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 WWW.JACKSONMAIN.COM COFFMAN N G I N E E R S 1101 2nd Ave., Suite 400 I Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com LASTING creativity I results I relationships RECEIVED Oct 14 2021 V /1 QDEPARTMENT CITY OF EDMONDS DEVELOPMENT SERVICES Z O o W Q co 0) W 0 J Q LL 0 O U' C) 0 O N� I..L z Q O w J (y) Q U cy) uw 0 Z CD z U) CD N Co G 0 L>- co LL W0 G� a z viz U) U) W0-) < z 00 Q 0 2 0— t W J z o ~ a m U) U U) U) ~ w W a o� z WN Q LO p O 21 PROJECT NO.: 210887 PROJECT MGR.: ON DRAWN BY: CEI CHECKED BY: ON VRF SYSTEM SCHEMATIC M202 JACKSON I MAIN ARCHITECTURE P.S. © 2021 STRAP HANGER- ��3 8" MINIMUM INSIDE RADIUS�� PROVIDE 1/4" BEAD AROUND COLLAR FOR CLAMP CATCH SMACNA APPROVED CLAMP - LOAD RATED GL FASTENERS BAND SAME SIZE AS HANGER STRAP z CV qL REDUCER WHERE OVERSIZED DUCT IS INDICATED ON GIRD SCHEDULE. (MOST LOCATIONS) CEILING —DIFFUSER: REFER TO DRAWINGS, SHEDULES, SPECIFICATIONS FOR TYPE AND SIZE. 1 DIRECT DIFFUSER CONNECTION DETAIL M2.3 SCALE: NONE ACOUSTIC -LINED 2" LARGER THAN LARGEST PLENUM (TYPICAL) DUCT OR SPIN -IN CONNECTION BUT NOT LESS THAN 12" FLAT OVAL OR ROUND VRF FAN COIL DUCTWORK (SEE FLOOR PLANS) TRANSITION AS REQUIRED 1 I I 1 RETURN OPENING ON 1 TOP OF PLENUM I I LJ 1 1F -1I I 1 1 1 FILTER SIDE ACCESS I I 1�' CLOSED CELL FOAM 1 J (ARMACELL) ACOUSTIC LINING ON FIRST 6'-0" OF DISCHARGE DUCT \ MINIMUM 28" CLEAR FOR SERVICE, MORE WHERE REQUIRED BY N.E.C. s FAN COIL UNIT DETAIL M2.3 SCALE: NONE II01►1Apill" I AIRFLOW ' ACCEPTABLE ROUND DUCT TAKE -OFFS \ \ CONICAL SPIN -IN (MIN. 2" LARGER) \ PROVIDE A VOLUME DAMPER \ FOR EVERY DIFFUSER AND \ \ GRILLE. LOCATE DAMPER AS \ \ FAR AS PRACTICAL, AND WITH NOT LESS THAN 6 LINEAR FEET OF DUCT, FROM DIFFUSER OR GRILLE. LOCATE DAMPERS ON DIFFUSER OR GRILLE (TYP). RECORD DRAWINGS AND REFER TO ACCEPTABLE COORDINATE WITH AIR CONNECTION DETAILS BALANCER HANGEn n' BAND 50"0 OR LESS OVER 50"0 HANGER STRAPS OR RODS MAX. DUCT 0 IN. [mm] QUANTITY/SIZE IN. [mm] MAX. LOAD LBS. [kg] MAX. SPACING IN. [mm] 26 [650] ONE 1 [25] x 22 GA STRAP 260 [119] 144 [3600] 36 [900] ONE 1 [25] x 18 GA STRAP 420 [190] 144 [3600] 50 [1250] ONE 1 [25] x 16 GA STRAP 700 [317] 144 [3600] 60 [1500] TWO 3/8 [10]0. RODS 1320 [598] 144 [3600] 84 [2100] TWO 1/2 [13]0 RODS 2500 [1133] 144 [3600] NOTE: 1. TABULATED DATA FROM SMACNA ALLOWS FOR DUCT REINFORCING AND INSULATION, BUT NO EXTERNAL LOAD. 2 ROUND DUCT HANGER DETAIL M2.3 SCALE: NONE R SHALL EQUAL OR BE GREATER THAN W. VAN 1 /3W qw, R SHALL EQUAL OR BE GREATER THAN 1/3VA ROUND TRUNK DUCT ATTACH DIFFUSER BC TRUNK DUCT W/ POP CHFFTMFTAI SCRPAI SEAL AIRTIGHT ALL AROUND BOOT VOLUME DAMPER SUPPLY GRILLE SIDEWALL DIFFUSER - DOUBLE DEFLECTION W/ VERTICAL OUTER VANES SHEETMETAL OUTLET BOOT SAME SIZE AS DIFFUSER FRAME (_3 DUCT MOUNTED DIFFUSER DETAIL M2.3 SCALE: NONE R SHALL --� EQUAL OR GREATER G / THAN 1/6W. STANDARD RADIUS OR SHORT RADIUS ELBOW SHORT RADIUS ELBOW LONG RADIUS ELBOW WITH ONE VANE WITH TWO VANES NOTES: 1. THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND. 2. ALL STANDARD RADIUS ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS ELBOWS. ALL SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE CONSTRUCTED, SUPPORTED AND FASTENED AS RECOMMENDED BY SMACNA. s DUCT RADIUS ELBOW DETAIL M2.3 SCALE: NONE METAL PAN WALL CLIP 45' STORM LOUVER COMBINATI DAMPER k U CHANNEL FRAME PARALLEL BLADE MOTORIZED DAMPER CONCEALED LINKAGE BIRDSCREEN MOTOR ACTUATOR 1-1/4 X 1-1/4 X 3/16 ANGLE IRON SUPPORTS —NUTS AND WASHERS BOTH / SIDES OF ANGLE (TYP). STRUCTURAL JOIST W1 NOTES: 1. ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA. 2. WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE REGARDLESS OF W DIMENSION, UNLESS OTHERWISE NOTED. 3. ALL SINGLE THICKNESS VANES SHALL HAVE A 2" [50mm] RADIUS, 1 1/2" [40mm] MAXIMUM SPACE BETWEEN VANES, AND A 3/4" [20mm] TRAILING EDGE. 4. WHEN W EQUALS W2, AND W1 IS GREATER THAN 20" [500mm], VANES SHALL BE DOUBLE VANE TYPE, UNLESS OTHERWISE NOTED. (_4MITERED DUCT ELBOWS WITH VANES M2.3 SCALE: NONE SWAY BRACE, BOTH DIRECTIONS @ 90° 3/8" THREADED STEEL RODS SUPPORT FROM BLDG STRUCTURE LENGTHS OF RODS TO SUIT SPACE AVAILABLE STEEL SPRING ANC RUBBER IN SHEAR TYPE VIBRATION ISOLATORS MOTOR (TO BE LOCATED ON THE SIDE FOR MIXED -FLOW INLINE FANS) MOUNTING BRACKET FLEX. CONNECTION (TYP) — AIR FLOW E 1/2" BOLT AND NUT W/ DUCTWORK 2" 1/2 WASHER. MOUNTING BRACKET \ X / / \ BOLTS 1/2" THREADED ROD CONNECT DUCTWORK TO FAN WITH 1/8" THICK (TYP). NEOPRENE GASKET (_7 RECTANGULAR DUCT HANGER DETAIL M2.3 SCALE: NONE CONSTRUCT TRANSFER DUCT TO PROVIDE "LINE OF SIGHT" NOISE PATH ARCHITECTURAL SPACE PARTITON/SEPARATION ® SUPPORT DUCT > 4 FOOT MINIMUM, 8 FOOT FROM STRUCTURE MAXIMUM LENGTH AND 130' CLIP ANGLES (TYPICAL) MAXIMUM CUMULATIVE EXTENDED SILL /� CHANGE OF DIRECTION FOR -` FLEX DUCT. PROVIDE AT LEAST NOTES: 90' CHANGE OF DIRECTION 1. LOUVER/DAMPER ASSEMBLIES TO BE NOT LESS THAN ONE WHERE POSSIBLE FOR ASSEMBLED AT LOUVER%� STRAP HANGER FOR EACH ACOUSTICAL CONSIDERATION MANUFACTURER FACTORY. ��� PROVIDE ELBOWS FLEX DUCT 2. CLIP ANGLES AND EXTENDED SILL TO TO CREATEE A "Z" DUCT = �� (TYPICAL) BE PROVIDED BY LOUVER MANUFACTURER. NOTE: 3. MOTOR ACTUATORS TO BE SIZED AND INTERNAL ACOUSTIC INSTALLED BY LOUVER MANUFACTURER. LINING - SEE PLANS FOR 1. DO NOT USE FLEXIBLE DUCT IF NOT INDICATED ON PLANS. 4. INSTALLATION OF LOUVER TO BE IN LINING THICKNESS PROVIDE SHEETMETAL DUCT, RECTANGULAR IF NEEDED FOR - ACCORDANCE WITH LOUVER SPACE CONSTRAINTS. MANUFACTURER'S RECOMMENDATIONS. SHEETMETAL TRANSFER DUCT - SEE PLANS FOR SIZES CONNECTING DUCT FOR DIFFUSERS AND GRILLES DETAIL M2.3 SCALE: NONE 10 LOUVER DAMPER DETAIL M2.3 SCALE: NONE 11 Z-TYPE TRANSFER DUCT DETAIL M2.3 SCALE: NONE 8 CENTRIFUGAL INLINE FAN DETAIL M2.3 SCALE: NONE ACKSON I MAID A.RC 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 WWW.JACKSONMAIN.COM COFFMAN N G I N E E R S 1101 2nd Ave., Suite 400 1 Seattle, WA 98101 ph 206.623.0717 I fax 206.624.3775 coffman.com LASTING creativity I results I relationships RECEIVED Oct 14 2021 QDEPARTMENT CITY OF EDMONDS DEVELOPMENT SERVICES Z 0 0 � W Q W CK-JQ m Q 0 0 U) Q 0 z � 0 � 0 W JMo 2 0- CU Co w V J 0 Z C� 0 Z (n 2E in w >- 0 co � J �3:Q LL W Q Q z c)2z 0 CC G w0z Q �Q0 O O ti 2 0 w J Z O H ~ d m U U U � 0 ry w a O z LU N Q Lo ❑ o 10/5/21 PROJECT NO.: 210887 PROJECT MGR.: ON DRAWN BY: CEI CHECKED BY: ON DETAILS M203 JACKSON I MAIN ARCHITECTURE P.S. © 2021 SHEET NOTES: Room Checksums By COFFMAN ENGINEERS, INC. 100 Lobby COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 7 / 14 Mo/Hr: 7/15 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 80 / 64 / 66 OADB: 81 OADB: 25 SADB 55.0 90.0 Ra Plenum 75.0 70.0 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.4 70.0 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 75.4 70.0 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00 Glass Solar 1,832 0 1,832 48 1,780 53 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 242 0 242 6 303 9 Glass/Door Cond -2,374 -2,374 65.23 Cooling Heating Wall Cond 50 0 50 1 57 2 Wall Cond -155 -155 4.26 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 153 153 Floor 0 0 0 0.00 0 Floor -458 -458 12.57 Terminal 153 153 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 153 153 Infiltration 63 63 2 35 1 Infiltration -261 -261 7.16 Sec Fan 0 0 Sub Total =_> 2,186 0 2,186 58 2,175 65 Sub Total =_> -3,247 -3,247 89.23 Nom Vent 20 20 AHU Vent 20 20 Internal Loads Internal Loads Infil 5 5 Lights 306 76 382 10 306 9 Lights 0 0 0.00 MinStoplRh 15 15 People 500 0 500 13 250 7 People 0 0 0.00 Return 178 178 Misc 0 0 0 0 0 0 Misc 0 0 0.00 Exhaust 25 25 Sub Total =_> 806 76 882 23 556 17 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 0 0 0 0 0 0 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 238 0 238 6 132 4 Ventilation Load -110 -110 3.02 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 494 494 13 494 15 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -11 -11 0 OA Preheat Diff. -282 7.75 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 13.1 13.1 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.00 cfm/ft' 1.36 1.36 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfmlton 483.72 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'/ton 354.66 Btu/heft' 33.84 -32.49 Grand Total =_> 3,724 66 3,790 100.00 3,357 100.00 Grand Total ==> -3,357 -3,639 100.00 No. People 1.0 8.9/1000 ft2 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWB/HR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft2 (%) MBh cfm °F OF Main Clg 0.3 3.8 3.4 153 75.4 62.6 65.9 55.0 54.2 62.4 Floor 112 Main Htg -3.4 153 70.0 90.0 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 20 63.1 54.7 51.3 63.1 54.7 51.3 Int Door 1 Preheat 0.0 0 0.0 0.0 ExFlr 19 Total 0.3 3.8 Roof 0 0 0 Humidif 0.0 0 0.0 0.0 Wall 181 117 65 Opt Vent -0.3 20 52.2 65.0 Ext Door 0 0 0 1 Total -3.6 Project Name: TRACE® 700 v6.3.5 calculated at 04:25 PM on 09/10/2021 Dataset Name: 210887_POE_091021.TRC Alternative - 1 System Checksums Report Page 1 of 22 Room Checksums By COFFMAN ENGINEERS, INC. 200 Lobby COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 7 / 15 Mo/Hr: 7 / 15 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 81 / 64 / 63 OADB: 81 OADB: 25 SADB 55.0 87.3 Ra Plenum 75.0 70.0 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.5 70.0 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total RetlOA 75.5 70.0 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 186 0 186 6 186 7 Roof Cond -135 -135 5.26 Glass Solar 1,454 0 1,454 48 1,454 55 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 199 0 199 7 199 8 Glass/Door Cond -1,577 -1,577 61.54 Cooling Heating Wall Cond 73 0 73 2 73 3 Wall Cond -198 -198 7.72 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 120 120 Floor 0 0 0 0.00 0 Floor 0 0 0.00 Terminal 120 120 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 120 120 Infiltration 52 52 2 35 1 Infiltration -261 -261 10.17 Sec Fan 0 0 Sub Total =_> 1,965 0 1,965 65 1,948 74 Sub Total =_> -2,171 -2,171 84.70 Nom Vent 20 20 AHU Vent 20 20 Internal Loads Internal Loads Infil 5 5 Lights 306 76 382 13 306 12 Lights 0 0 0.00 MinStop/Rh 12 12 People 500 0 500 17 250 9 People 0 0 0.00 Return 145 145 Misc 0 0 0 0 0 0 Misc 0 0 0.00 Exhaust 25 25 Sub Total =_> 806 76 882 29 556 21 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 0 0 0 0 0 0 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 196 0 196 6 132 5 Ventilation Load -110 -110 4.29 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 OvlUndr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -13 -13 0 OA Preheat Diff. -282 11.01 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 16.7 16.7 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.00 cfm/ft' 1.07 1.07 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 474.95 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'/ton 443.62 Btu/heft' 27.05 -22.88 Grand Total =_> 2,967 63 3,030 100.00 2,635 100.00 Grand Total ==> -2,281 -2,563 100.00 No. People 1.0 8.9/1000 ft2 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft2 (%) MBh cfm °F °F Main Clg 0.3 3.0 2.7 120 75.5 62.7 65.9 55.0 54.1 61.9 Floor 112 Main Htg -2.3 120 70.0 87.3 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 20 63.1 54.7 51.3 63.1 54.7 51.3 Int Door 1 Preheat 0.0 0 0.0 0.0 ExFlr 0 Total 0.3 3.0 Roof 112 0 0 Humidif 0.0 0 0.0 0.0 Wall 177 96 54 Opt Vent -0.3 20 52.2 65.0 Ext Door 0 0 0 Total -2.6 Project Name: TRACE® 700 v6.3.5 calculated at 04:25 PM on 09/10/2021 Dataset Name: 210887_POE_091021.TRC Alternative-1 System Checksums Report Page 8 of 22 Room Checksums By COFFMAN ENGINEERS, INC. 108 Supervisor Office COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 7 / 14 Mo/Hr: 7/15 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 80 / 64 / 66 OADB: 81 OADB: 25 SADB 55.0 71.2 Ra Plenum 75.0 70.0 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.9 70.0 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 75.9 70.0 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00 Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 0 0 0 0 0 0 Glass/Door Cond 0 0 0.00 Cooling Heating Wall Cond 0 0 0 0 0 0 Wall Cond 0 0 0.00 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 108 108 Floor 0 0 0 0.00 0 Floor 0 0 0.00 Terminal 108 108 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 108 108 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 0 0 Sub Total =_> 0 0 0 0 0 0 Sub Total =_> 0 0 0.00 Nom Vent 25 25 AHU Vent 25 25 Internal Loads Internal Loads Infil 0 0 Lights 552 138 689 23 552 23 Lights 0 0 0.00 MinStoplRh 11 11 People 1,000 0 1,000 33 500 21 People 0 0 0.00 Return 133 133 Misc 1,160 0 1,160 39 1,160 49 Misc 0 0 0.00 Exhaust 25 25 Sub Total =_> 2,712 138 2,850 95 2,212 93 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 0 0 0 0 0 0 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 189 0 189 6 165 7 Ventilation Load -137 -137 28.03 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -26 -26 -1 OA Preheat Diff. -353 71.97 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 23.1 23.1 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.00 cfm/ft' 0.54 0.54 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfmlton 430.79 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'/ton 804.61 Btu/heft' 14.91 -2.43 Grand Total =_> 2,901 112 3,013 100.00 2,377 100.00 Grand Total ==> -137 -490 100.00 No. People 2.0 9.9/1000 ft2 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWB/HR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft2 (%) MBh cfm OF OF Main Clg 0.3 3.0 2.5 108 75.9 62.8 65.9 55.0 53.3 58.9 Floor 202 Main Htg -0.1 108 70.0 71.2 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 25 63.1 54.7 51.3 63.1 54.7 51.3 Int Door 1 Preheat 0.0 0 0.0 0.0 ExFlr 0 Total 0.3 3.0 Roof 0 0 0 Humidif 0.0 0 0.0 0.0 Wall 0 0 0 Opt Vent -0.4 25 52.2 65.0 Ext Door 0 0 0 1 Total -0.5 Project Name: TRACE® 700 v6.3.5 calculated at 04:25 PM on 09/10/2021 Dataset Name: 210887_POE_091021.TRC Alternative - 1 System Checksums Report Page 6 of 22 Room Checksums By COFFMAN ENGINEERS, INC. 201 Office 1 COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 7 / 17 Mo/Hr: 7 / 18 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 79 / 62 / 57 OADB: 77 OADB: 25 SADB 55.0 76.9 Ra Plenum 75.0 70.0 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.3 70.0 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 75.3 70.0 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 792 0 792 5 759 5 Roof Cond -514 -514 8.54 Glass Solar 7,280 0 7,280 43 7,583 48 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 338 0 338 2 225 1 Glass/Door Cond -3,089 -3,089 51.31 Cooling Heating Wall Cond 514 0 514 3 569 4 Wall Cond -541 -541 8.99 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 715 715 Floor 0 0 0 0.00 0 Floor 0 0 0.00 Terminal 715 715 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 715 715 Infiltration 127 127 1 47 0 Infiltration -994 -994 16.51 Sec Fan 0 0 Sub Total =_> 9,052 0 9,052 53 9,182 58 Sub Total =_> -5,138 -5,138 85.35 Nom Vent 45 45 AHU Vent 45 45 Internal Loads Internal Loads Infil 20 20 Lights 1,166 291 1,457 9 1,166 7 Lights 0 0 0.00 MinStop/Rh 72 72 People 2,000 0 2,000 12 1,000 6 People 0 0 0.00 Return 781 781 Misc 4,266 0 4,266 25 4,266 27 Misc 0 0 0.00 Exhaust 65 65 Sub Total =_> 7,432 291 7,724 45 6,432 41 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 0 0 0 0 0 0 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 282 0 282 2 103 1 Ventilation Load -247 -247 4.11 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 OvlUndr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -24 -24 0 OA Preheat Diff. -635 10.55 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 6.3 6.3 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.00 cfm/ft' 1.67 1.67 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 503.88 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'/ton 300.83 Btu/heft' 39.89 -14.10 Grand Total =_> 16,766 267 17,033 100.00 15,718 100.00 Grand Total ==> -5,385 -6,020 100.00 No. People 4.0 9.4/1000 ft2 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft' (%) MBh cfm °F °F Main Clg 1.4 17.0 15.9 715 75.3 62.6 65.9 55.0 54.5 63.8 Floor 427 Main Htg -5.4 715 70.0 76.9 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 45 63.1 54.7 51.3 63.1 54.7 51.3 Int Door 1 Preheat 0.0 0 0.0 0.0 ExFlr 0 Total 1.4 17.0 Roof 427 0 0 Humidif 0.0 0 0.0 0.0 Wall 409 188 46 Opt Vent -0.6 45 52.2 65.0 Ext Door 0 0 0 Total -6.0 Project Name: TRACE® 700 v6.3.5 calculated at 04:25 PM on 09/10/2021 Dataset Name: 210887_POE_091021.TRC Alternative - 1 System Checksums Report Page 9 of 22 KEYNOTES: iT/ ACKSON I MAI RCHITECTUR 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 WWW.JACKSONMAIN.COM COFFMAN N G I N E E R S 1101 2nd Ave., Suite 400 1 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com LASTING creativity I results I relationships RECEIVED Oct 14 2021 CITY OF EDMONDS DEVELOPMENT SERVICES QDEPARTMENT Z O C) _ > L 0 VJ w3:a' c) w CK-JQ LL C) O 0�U) Q 0 Q O wJMo O CU cy) w V 0 Z C� 0 Z u, L trl >- o co w fj� LL m oJ� Q Q Z v�Z Q N� L.L CC G w 0 Z ^O OQ L.L 2 0 I..L 0- w J Z O I- ~ H 2 W m U U toUJI ~ W D_ O Z W N H Q � o F1 PROJECT NO.: 210887 PROJECT MGR.: ON DRAWN BY: CEI CHECKED BY: ON HVAC LOAD CALCS M301 JACKSON I MAIN ARCHITECTURE P.S. © 2021 SHEET NOTES: Room Checksums By COFFMAN ENGINEERS, INC. 203 Office 2 COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 7 / 18 Mo/Hr: 7/18 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 77 / 60 / 52 OADB: 77 OADB: 25 SADB 55.0 75.3 Ra Plenum 75.0 70.0 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.3 70.0 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 75.3 70.0 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 269 0 269 4 269 4 Roof Cond -182 -182 9.23 Glass Solar 4,115 0 4,115 59 4,115 64 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 57 0 57 1 57 1 Glass/Door Cond -789 -789 40.05 Cooling Heating Wall Cond 328 0 328 5 328 5 Wall Cond -255 -255 12.96 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 292 292 Floor 0 0 0 0.00 0 Floor 0 0 0.00 Terminal 292 292 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 292 292 Infiltration 1 1 0 16 0 Infiltration -352 -352 17.85 Sec Fan 0 0 Sub Total =_> 4,770 0 4,770 69 4,785 75 Sub Total =_> -1,577 -1,577 80.09 Nom Vent 20 20 AHU Vent 20 20 Internal Loads Internal Loads Infil 7 7 Lights 412 103 515 7 412 6 Lights 0 0 0.00 MinStoplRh 29 29 People 1,000 0 1,000 14 500 8 People 0 0 0.00 Return 319 319 Misc 669 0 669 10 669 10 Misc 0 0 0.00 Exhaust 27 27 Sub Total =_> 2,081 103 2,184 31 1,581 25 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 0 0 0 0 0 0 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 4 0 4 0 46 1 Ventilation Load -110 -110 5.58 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -9 -9 0 OA Preheat Diff. -282 14.33 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 6.9 6.9 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.00 cfm/ft' 1.93 1.93 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfmlton 503.85 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'/ton 260.76 Btu/heft' 46.02 -13.04 Grand Total =_> 6,855 94 6,949 100.00 6,412 100.00 Grand Total ==> -1,687 -1,969 100.00 No. People 2.0 13.2/1000 ft2 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWB/HR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft2 (%) MBh cfm °F OF Main Clg 0.6 7.0 6.5 292 75.3 62.6 65.9 55.0 54.5 63.7 Floor 151 Main Htg -1.7 292 70.0 75.3 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 20 63.1 54.7 51.3 63.1 54.7 51.3 Int Door 1 Preheat 0.0 0 0.0 0.0 ExFlr 0 Total 0.6 7.0 Roof 151 0 0 Humidif 0.0 0 0.0 0.0 Wall 152 48 32 Opt Vent -0.3 20 52.2 65.0 Ext Door 0 0 0 1 Total -2.0 Project Name: TRACE® 700 v6.3.5 calculated at 04:25 PM on 09/10/2021 Dataset Name: 210887_POE_091021.TRC Alternative - 1 System Checksums Report Page 10 of 22 Room Checksums By COFFMAN ENGINEERS, INC. 205 Office 4 COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 7 / 18 Mo/Hr: 7 / 18 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 77 / 60 / 52 OADB: 77 OADB: 25 SADB 55.0 75.1 Ra Plenum 75.0 70.0 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.3 70.0 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total RetlOA 75.3 70.0 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 267 0 267 4 267 4 Roof Cond -181 -181 9.41 Glass Solar 4,115 0 4,115 59 4,115 64 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 57 0 57 1 57 1 Glass/Door Cond -789 -789 41.09 Cooling Heating Wall Cond 315 0 315 5 315 5 Wall Cond -209 -209 10.87 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 291 291 Floor 0 0 0 0.00 0 Floor 0 0 0.00 Terminal 291 291 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 291 291 Infiltration 1 1 0 16 0 Infiltration -349 -349 18.20 Sec Fan 0 0 Sub Total =_> 4,756 0 4,756 69 4,771 75 Sub Total =_> -1,527 -1,527 79.57 Nom Vent 20 20 AHU Vent 20 20 Internal Loads Internal Loads Infil 7 7 Lights 410 102 512 7 410 6 Lights 0 0 0.00 MinStop/Rh 29 29 People 1,000 0 1,000 14 500 8 People 0 0 0.00 Return 318 318 Misc 669 0 669 10 669 10 Misc 0 0 0.00 Exhaust 27 27 Sub Total =_> 2,079 102 2,181 31 1,579 25 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 0 0 0 0 0 0 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 4 0 4 0 46 1 Ventilation Load -110 -110 5.73 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 OvlUndr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -9 -9 0 OA Preheat Diff. -282 14.70 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 6.9 6.9 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.00 cfm/ft' 1.94 1.94 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 503.80 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'/ton 259.69 Btu/heft' 46.21 -12.79 Grand Total =_> 6,838 94 6,931 100.00 6,395 100.00 Grand Total ==> -1,637 -1,919 100.00 No. People 2.0 13.3/1000 ft2 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft2 (%) MBh cfm °F °F Main Clg 0.6 6.9 6.5 291 75.3 62.6 65.9 55.0 54.5 63.7 Floor 150 Main Htg -1.6 291 70.0 75.1 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 20 63.1 54.7 51.3 63.1 54.7 51.3 Int Door 1 Preheat 0.0 0 0.0 0.0 ExFlr 0 Total 0.6 6.9 Roof 150 0 0 Humidif 0.0 0 0.0 0.0 Wall 133 48 36 Opt Vent -0.3 20 52.2 65.0 Ext Door 0 0 0 Total -1.9 Project Name: TRACE® 700 v6.3.5 calculated at 04:25 PM on 09/10/2021 Dataset Name: 210887_POE_091021.TRC Alternative - 1 System Checksums Report Page 12 of 22 Room Checksums By COFFMAN ENGINEERS, INC. 204 Office 3 COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 7 / 18 Mo/Hr: 7/18 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 77 / 60 / 52 OADB: 77 OADB: 25 SADB 55.0 75.1 Ra Plenum 75.0 70.0 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.3 70.0 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 75.3 70.0 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 267 0 267 4 267 4 Roof Cond -181 -181 9.41 Glass Solar 4,115 0 4,115 59 4,115 64 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 57 0 57 1 57 1 Glass/Door Cond -789 -789 41.09 Cooling Heating Wall Cond 315 0 315 5 315 5 Wall Cond -209 -209 10.87 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 291 291 Floor 0 0 0 0.00 0 Floor 0 0 0.00 Terminal 291 291 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 291 291 Infiltration 1 1 0 16 0 Infiltration -349 -349 18.20 Sec Fan 0 0 Sub Total =_> 4,756 0 4,756 69 4,771 75 Sub Total =_> -1,527 -1,527 79.57 Nom Vent 20 20 AHU Vent 20 20 Internal Loads Internal Loads Infil 7 7 Lights 410 102 512 7 410 6 Lights 0 0 0.00 MinStoplRh 29 29 People 1,000 0 1,000 14 500 8 People 0 0 0.00 Return 318 318 Misc 669 0 669 10 669 10 Misc 0 0 0.00 Exhaust 27 27 Sub Total =_> 2,079 102 2,181 31 1,579 25 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 0 0 0 0 0 0 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 4 0 4 0 46 1 Ventilation Load -110 -110 5.73 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -9 -9 0 OA Preheat Diff. -282 14.70 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 6.9 6.9 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.00 cfm/ft' 1.94 1.94 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfmlton 503.80 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'/ton 259.69 Btu/heft' 46.21 -12.79 Grand Total =_> 6,838 94 6,931 100.00 6,395 100.00 Grand Total ==> -1,637 -1,919 100.00 No. People 2.0 13.3/1000 ft2 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWB/HR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft2 (%) MBh cfm OF OF Main Clg 0.6 6.9 6.5 291 75.3 62.6 65.9 55.0 54.5 63.7 Floor 150 Main Htg -1.6 291 70.0 75.1 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 20 63.1 54.7 51.3 63.1 54.7 51.3 Int Door 1 Preheat 0.0 0 0.0 0.0 ExFlr 0 Total 0.6 6.9 Roof 150 0 0 Humidif 0.0 0 0.0 0.0 Wall 133 48 36 Opt Vent -0.3 20 52.2 65.0 Ext Door 0 0 0 1 Total -1.9 Project Name: TRACE® 700 v6.3.5 calculated at 04:25 PM on 09/10/2021 Dataset Name: 210887_POE_091021.TRC Alternative - 1 System Checksums Report Page 11 of 22 Room Checksums By COFFMAN ENGINEERS, INC. 206 Office 5 COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 7 / 18 Mo/Hr: 7 / 18 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 77 / 60 / 52 OADB: 77 OADB: 25 SADB 55.0 75.1 Ra Plenum 75.0 70.0 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.3 70.0 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 75.3 70.0 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 270 0 270 4 270 4 Roof Cond -183 -183 9.50 Glass Solar 4,115 0 4,115 59 4,115 64 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 57 0 57 1 57 1 Glass/Door Cond -789 -789 40.94 Cooling Heating Wall Cond 315 0 315 5 315 5 Wall Cond -209 -209 10.83 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 291 291 Floor 0 0 0 0.00 0 Floor 0 0 0.00 Terminal 291 291 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 291 291 Infiltration 1 1 0 17 0 Infiltration -354 -354 18.37 Sec Fan 0 0 Sub Total =_> 4,759 0 4,759 69 4,774 75 Sub Total =_> -1,534 -1,534 79.64 Nom Vent 20 20 AHU Vent 20 20 Internal Loads Internal Loads Infil 7 7 Lights 415 104 519 7 415 6 Lights 0 0 0.00 MinStop/Rh 29 29 People 1,000 0 1,000 14 500 8 People 0 0 0.00 Return 319 319 Misc 669 0 669 10 669 10 Misc 0 0 0.00 Exhaust 27 27 Sub Total =_> 2,084 104 2,188 32 1,584 25 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 0 0 0 0 0 0 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 4 0 4 0 46 1 Ventilation Load -110 -110 5.71 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 OvlUndr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -9 -9 0 OA Preheat Diff. -282 14.65 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 6.9 6.9 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.00 cfm/ft' 1.92 1.92 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 503.77 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'/ton 262.76 Btu/heft' 45.67 -12.67 Grand Total =_> 6,847 95 6,942 100.00 6,404 100.00 Grand Total ==> -1,644 -1,926 100.00 No. People 2.0 13.2/1000 ft2 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft2 (%) MBh cfm °F °F Main Clg 0.6 6.9 6.5 291 75.3 62.6 65.9 55.0 54.5 63.7 Floor 152 Main Htg -1.6 291 70.0 75.1 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 20 63.1 54.7 51.3 63.1 54.7 51.3 Int Door 1 Preheat 0.0 0 0.0 0.0 ExFlr 0 Total 0.6 6.9 Roof 152 0 0 Humidif 0.0 0 0.0 0.0 Wall 133 48 36 Opt Vent -0.3 20 52.2 65.0 Ext Door 0 0 0 Total -1.9 Project Name: TRACE® 700 v6.3.5 calculated at 04:25 PM on 09/10/2021 Dataset Name: 210887_POE_091021.TRC Alternative - 1 System Checksums Report Page 13 of 22 KEYNOTES: iT/ ACKSON I MAI RCHITECTUR 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 WWW.JACKSONMAIN.COM COFFMAN N G I N E E R S 1101 2nd Ave., Suite 400 1 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com LASTING creativity I results I relationships RECEIVED Oct 14 2021 CITY OF EDMONDS DEVELOPMENT SERVICES QDEPARTMENT Z O C) _ > L 0 VJ w3:a' c) w CK-JQ LL C) O 0�U) Q 0 Q O wJMo O CU cy) w V 0 Z C� 0 Z u, L trl >- o co w fj� LL m oJ� Q Q Z v�Z Q N� L.L CC G w 0 Z ^O OQ L.L 2 0 I..L 0- w J Z O I- ~ H 2 W m U U toUJI ~ W D_ O Z W N H Q � o F1 PROJECT NO.: 210887 PROJECT MGR.: ON DRAWN BY: CEI CHECKED BY: ON HVAC LOAD CALCS M302 JACKSON I MAIN ARCHITECTURE P.S. © 2021 SHEET NOTES: Room Checksums By COFFMAN ENGINEERS, INC. 208 Office 6 COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 8 / 17 Mo/Hr: 8 / 17 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 77 / 62 / 59 OADB: 77 OADB: 25 SADB 55.0 75.9 Ra Plenum 75.0 70.0 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.2 70.0 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 75.2 70.0 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 410 0 410 3 410 3 Roof Cond -303 -303 6.42 Glass Solar 11,343 0 11,343 74 11,343 79 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 187 0 187 1 187 1 Glass/Door Cond -2,760 -2,760 58.38 Cooling Heating Wall Cond 469 0 469 3 469 3 Wall Cond -392 -392 8.29 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 655 655 Floor 0 0 0 0.00 0 Floor 0 0 0.00 Terminal 655 655 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 655 655 Infiltration 77 77 1 31 0 Infiltration -587 -587 12.41 Sec Fan 0 0 Sub Total =_> 12,485 0 12,485 82 12,440 86 Sub Total =_> -4,042 -4,042 85.49 Nom Vent 35 35 AHU Vent 35 35 Internal Loads Internal Loads Infil 12 12 Lights 688 172 860 6 688 5 Lights 0 0 0.00 MinStoplRh 65 65 People 1,000 0 1,000 7 500 3 People 0 0 0.00 Return 702 702 Misc 669 0 669 4 669 5 Misc 0 0 0.00 Exhaust 47 47 Sub Total =_> 2,357 172 2,529 17 1,857 13 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 0 0 0 0 0 0 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 225 0 225 1 92 1 Ventilation Load -192 -192 4.07 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -12 -12 0 OA Preheat Diff. -494 10.44 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 5.3 5.3 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.00 cfm/ft' 2.60 2.60 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfmlton 515.94 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft2/ton 198.58 Btu/heft' 60.43 -18.76 Grand Total =_> 15,068 161 15,228 100.00 14,389 100.00 Grand Total ==> -4,234 -4,728 100.00 No. People 2.0 7.9/1000 ft2 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWB/HR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft2 (%) MBh cfm °F OF Main Clg 1.3 15.2 14.6 655 75.2 62.6 65.9 55.0 54.7 64.4 Floor 252 Main Htg -4.2 655 70.0 75.9 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 35 63.1 54.7 51.3 63.1 54.7 51.3 Int Door 1 Preheat 0.0 0 0.0 0.0 ExFlr 0 Total 1.3 15.2 Roof 252 0 0 Humidif 0.0 0 0.0 0.0 Wall 328 168 51 Opt Vent -0.5 35 52.2 65.0 Ext Door 0 0 0 1 Total -4.7 Project Name: TRACE® 700 v6.3.5 calculated at 04:25 PM on 09/10/2021 Dataset Name: 210887_POE_091021.TRC Alternative - 1 System Checksums Report Page 14 of 22 Room Checksums By COFFMAN ENGINEERS, INC. 211 Audit COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 7 / 14 Mo/Hr: 7 / 15 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 80 / 64 / 66 OADB: 81 OADB: 25 SADB 55.0 77.9 Ra Plenum 75.0 70.0 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.4 70.0 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total RetlOA 75.4 70.0 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 118 0 118 4 138 6 Roof Cond -100 -100 8.73 Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 0 0 0 0 0 0 Glass/Door Cond 0 0 0.00 Cooling Heating Wall Cond 0 0 0 0 0 0 Wall Cond 0 0 0.00 Partition/Door 34 34 1 34 2 Partition/Door -34 -34 2.97 Diffuser 100 100 Floor 0 0 0 0.00 0 Floor 0 0 0.00 Terminal 100 100 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 100 100 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 0 0 Sub Total =_> 152 0 152 5 172 8 Sub Total =_> -134 -134 11.70 Nom Vent 20 20 AHU Vent 20 20 Internal Loads Internal Loads Infil 0 0 Lights 227 57 283 10 227 10 Lights 0 0 0.00 MinStop/Rh 10 10 People 1,000 0 1,000 36 500 23 People 0 0 0.00 Return 120 120 Misc 1,160 0 1,160 42 1,160 53 Misc 0 0 0.00 Exhaust 20 20 Sub Total =_> 2,387 57 2,444 88 1,887 86 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 0 0 0 0 0 0 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 182 0 182 7 132 6 Ventilation Load -110 -110 9.60 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 OvlUndr Sizing -618 -618 54.04 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -9 -9 0 OA Preheat Diff. -282 24.66 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 20.1 20.1 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.00 cfm/ft' 1.20 1.20 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 432.20 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'/ton 359.82 Btu/heft' 33.35 -13.79 Grand Total =_> 2,721 47 2,768 100.00 2,191 100.00 Grand Total ==> -862 -1,144 100.00 No. People 2.0 24.1/1000 ft2 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft2 (%) MBh cfm °F °F Main Clg 0.2 2.8 2.2 100 75.4 62.6 65.9 55.0 53.1 58.2 Floor 83 Main Htg -0.9 100 70.0 77.9 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 124 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 20 63.1 54.7 51.3 63.1 54.7 51.3 Int Door 1 Preheat 0.0 0 0.0 0.0 ExFlr 0 Total 0.2 2.8 Roof 83 0 0 Humidif 0.0 0 0.0 0.0 Wall 0 0 0 Opt Vent -0.3 20 52.2 65.0 Ext Door 0 0 0 Total -1.1 Project Name: TRACE® 700 v6.3.5 calculated at 04:25 PM on 09/10/2021 Dataset Name: 210887_POE_091021.TRC Alternative - 1 System Checksums Report Page 16 of 22 Room Checksums By COFFMAN ENGINEERS, INC. 209 Archive Room COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 8 / 14 Mo/Hr: 9/14 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 78 / 64 / 66 OADB: 76 OADB: 25 SADB 55.0 77.9 Ra Plenum 75.0 70.0 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.6 70.0 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 75.6 70.0 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 327 0 327 6 229 5 Roof Cond -320 -320 12.96 Glass Solar 1,987 0 1,987 33 2,448 51 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 28 0 28 0 0 0 Glass/Door Cond -460 -460 18.61 Cooling Heating Wall Cond 282 0 282 5 326 7 Wall Cond -223 -223 9.01 Partition/Door 65 65 1 65 1 Partition/Door -65 -65 2.64 Diffuser 221 221 Floor 0 0 0 0.00 0 Floor 0 0 0.00 Terminal 221 221 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 221 221 Infiltration 89 89 1 12 0 Infiltration -619 -619 25.05 Sec Fan 0 0 Sub Total =_> 2,778 0 2,778 47 3,081 64 Sub Total =_> -1,687 -1,687 68.27 Nom Vent 40 40 AHU Vent 40 40 Internal Loads Internal Loads Infil 13 13 Lights 726 182 908 15 726 15 Lights 0 0 0.00 MinStoplRh 22 22 People 2,000 0 2,000 34 1,000 21 People 0 0 0.00 Return 273 273 Misc 0 0 0 0 0 0 Misc 0 0 0.00 Exhaust 53 53 Sub Total =_> 2,726 182 2,908 49 1,726 36 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 0 0 0 0 0 0 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 281 0 281 5 39 1 Ventilation Load -220 -220 8.89 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -35 -35 -1 OA Preheat Diff. -564 22.83 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 18.1 18.1 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.00 cfm/ft' 0.83 0.83 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfmlton 446.13 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft2/ton 538.14 Btu/heft' 22.30 -9.29 Grand Total =_> 5,785 147 5,932 100.00 4,846 100.00 Grand Total ==> -1,907 -2,472 100.00 No. People 4.0 15.0/1000 ft2 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWB/HR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft2 (%) MBh cfm OF OF Main Clg 0.5 5.9 4.8 221 75.6 62.7 65.9 55.0 53.5 59.7 Floor 266 Main Htg -1.9 221 70.0 77.9 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 238 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 40 63.1 54.7 51.3 63.1 54.7 51.3 Int Door 1 Preheat 0.0 0 0.0 0.0 ExFlr 0 Total 0.5 5.9 Roof 266 0 0 Humidif 0.0 0 0.0 0.0 Wall 119 28 24 Opt Vent -0.6 40 52.2 65.0 Ext Door 0 0 0 1 Total -2.5 Project Name: TRACE® 700 v6.3.5 calculated at 04:25 PM on 09/10/2021 Dataset Name: 210887_POE_091021.TRC Alternative - 1 System Checksums Report Page 15 of 22 Room Checksums By COFFMAN ENGINEERS, INC. 216 Break Room COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 8 / 10 Mo/Hr: 7 / 10 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 70 / 60 / 63 OADB: 71 OADB: 25 SADB 55.0 72.4 Ra Plenum 75.0 70.0 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.2 70.0 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 75.2 70.0 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond -22 0 -22 0 9 0 Roof Cond -302 -302 9.64 Glass Solar 3,965 0 3,965 20 4,054 22 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond -112 0 -112 -1 -111 -1 Glass/Door Cond -789 -789 25.16 Cooling Heating Wall Cond 256 0 256 1 283 2 Wall Cond -241 -241 7.69 Partition/Door 42 42 0 42 0 Partition/Door -42 -42 1.33 Diffuser 857 857 Floor 0 0 0 0.00 0 Floor 0 0 0.00 Terminal 857 857 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 857 857 Infiltration 7 7 0 -59 0 Infiltration -584 -584 18.64 Sec Fan 0 0 Sub Total =_> 4,137 0 4,137 20 4,218 22 Sub Total =_> -1,958 -1,958 62.47 Nom Vent 60 60 AHU Vent 60 60 Internal Loads Internal Loads Infil 12 12 Lights 685 171 857 4 685 4 Lights 0 0 0.00 MinStop/Rh 86 86 People 2,000 0 2,000 10 1,000 5 People 0 0 0.00 Return 929 929 Misc 13,236 0 13,236 65 13,236 70 Misc 0 0 0.00 Exhaust 72 72 Sub Total =_> 15,921 171 16,092 79 14,921 79 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 0 0 0 0 0 0 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 37 0 37 0 -297 -2 Ventilation Load -330 -330 10.52 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 OvlUndr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -13 -13 0 OA Preheat Diff. -847 27.01 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 7.0 7.0 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.00 cfm/ft' 3.42 3.42 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 507.99 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'/ton 148.72 Btu/heft' 80.69 -12.49 Grand Total =_> 20,095 158 20,253 100.00 18,842 100.00 Grand Total ==> -2,288 -3,134 100.00 No. People 4.0 15.9/1000 ft2 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft2 (%) MBh cfm °F °F Main Clg 1.7 20.3 18.8 857 75.2 62.6 65.9 55.0 54.5 63.8 Floor 251 Main Htg -2.3 857 70.0 72.4 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 152 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 60 63.1 54.7 51.3 63.1 54.7 51.3 Int Door 1 Preheat 0.0 0 0.0 0.0 ExFlr 0 Total 1.7 20.3 Roof 251 0 0 Humidif 0.0 0 0.0 0.0 Wall 146 48 33 Opt Vent -0.9 60 52.2 65.0 Ext Door 0 0 0 Total -3.1 Project Name: TRACE® 700 v6.3.5 calculated at 04:25 PM on 09/10/2021 Dataset Name: 210887_POE_091021.TRC Alternative - 1 System Checksums Report Page 18 of 22 KEYNOTES: iT/ ACKSON I MAI RCHITECTUR 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 WWW.JACKSONMAIN.COM COFFMAN N G I N E E R S 1101 2nd Ave., Suite 400 1 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com LASTING creativity I results I relationships RECEIVED Oct 14 2021 CITY OF EDMONDS DEVELOPMENT SERVICES QDEPARTMENT Z O C) _ > L 0 VJ w3:a' c) w CK-JQ LL C) O 0�U) Q 0 Q O wJMo O CU cy) w V 0 Z C� 0 Z u, L trl >- o co w fj� LL m oJ� Q Q Z v�Z Q N� L.L CC G w 0 Z ^O OQ E 2 0 I..L 0 w J Z O I- ~ H 2 W m U U toUJI ~ W D_ O Z W N H Q � o F1 PROJECT NO.: 210887 PROJECT MGR.: ON DRAWN BY: CEI CHECKED BY: ON HVAC LOAD CALCS M303 JACKSON I MAIN ARCHITECTURE P.S. © 2021 SHEET NOTES: Room Checksums By COFFMAN ENGINEERS, INC. 217 Leaseable Office COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 7 / 11 Mo/Hr: 7/10 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 74 / 61 / 60 OADB: 71 OADB: 25 SADB 55.0 78.5 Ra Plenum 75.0 70.0 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.6 70.0 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 75.6 70.0 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 272 0 272 2 25 0 Roof Cond -886 -886 11.67 Glass Solar 7,738 0 7,738 46 8,798 58 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond -182 0 -182 -1 -352 -2 Glass/Door Cond -2,497 -2,497 32.88 Cooling Heating Wall Cond 631 0 631 4 568 4 Wall Cond -930 -930 12.24 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 689 689 Floor 0 0 0 0.00 0 Floor 0 0 0.00 Terminal 689 689 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 689 689 Infiltration 84 84 0 -173 -1 Infiltration -1,713 -1,713 22.56 Sec Fan 0 0 Sub Total =_> 8,542 0 8,542 51 8,867 59 Sub Total =_> -6,027 -6,027 79.35 Nom Vent 80 80 AHU Vent 80 80 Internal Loads Internal Loads Infil 35 35 Lights 2,010 502 2,512 15 2,010 13 Lights 0 0 0.00 MinStoplRh 69 69 People 2,000 0 2,000 12 1,000 7 People 0 0 0.00 Return 804 804 Misc 3,655 0 3,655 22 3,655 24 Misc 0 0 0.00 Exhaust 115 115 Sub Total =_> 7,665 502 8,167 49 6,665 44 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 0 0 0 0 0 0 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 191 0 191 1 -396 -3 Ventilation Load -440 -440 5.79 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -72 -72 0 OA Preheat Diff. -1,129 14.86 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 11.6 11.6 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.00 cfm/ft' 0.94 0.94 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfmlton 491.10 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'/ton 524.80 Btu/heft' 22.87 -10.32 Grand Total =_> 16,399 431 16,829 100.00 15,136 100.00 Grand Total ==> -6,466 -7,595 100.00 No. People 4.0 5.4/1000 ft2 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWB/HR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft2 (%) MBh cfm °F OF Main Clg 1.4 16.8 15.4 689 75.6 62.7 65.9 55.0 54.4 63.2 Floor 736 Main Htg -6.5 689 70.0 78.5 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 80 63.1 54.7 51.3 63.1 54.7 51.3 Int Door 1 Preheat 0.0 0 0.0 0.0 ExFlr 0 Total 1 A 16.8 Roof 736 0 0 Humidif 0.0 0 0.0 0.0 Wall 531 152 29 Opt Vent -1.1 80 52.2 65.0 Ext Door 0 0 0 1 Total -7.6 Project Name: TRACE® 700 v6.3.5 calculated at 04:25 PM on 09/10/2021 Dataset Name: 210887_POE_091021.TRC Alternative - 1 System Checksums Report Page 19 of 22 Room Checksums By COFFMAN ENGINEERS, INC. 220 Corridor COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 7 / 15 Mo/Hr: 7 / 16 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 81 / 64 / 63 OADB: 80 OADB: 25 SADB 55.0 77.9 Ra Plenum 75.0 70.0 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 77.1 70.0 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total RetlOA 77.1 70.0 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 877 0 877 30 956 37 Roof Cond -635 -635 41.66 Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 0 0 0 0 0 0 Glass/Door Cond 0 0 0.00 Cooling Heating Wall Cond 0 0 0 0 0 0 Wall Cond 0 0 0.00 Partition/Door 14 14 0 14 1 Partition/Door -14 -14 0.89 Diffuser 119 119 Floor 0 0 0 0.00 0 Floor 0 0 0.00 Terminal 119 119 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 119 119 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 0 0 Sub Total =_> 890 0 890 31 969 37 Sub Total =_> -648 -648 42.55 Nom Vent 35 35 AHU Vent 35 35 Internal Loads Internal Loads Infil 0 0 Lights 1,439 360 1,799 62 1,439 55 Lights 0 0 0.00 MinStop/Rh 12 12 People 0 0 0 0 0 0 People 0 0 0.00 Return 154 154 Misc 0 0 0 0 0 0 Misc 0 0 0.00 Exhaust 35 35 Sub Total =_> 1,439 360 1,799 62 1,439 55 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 0 0 0 0 0 0 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 276 0 276 10 208 8 Ventilation Load -192 -192 12.62 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 OvlUndr Sizing -189 -189 12.41 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -82 -82 -3 OA Preheat Diff. -494 32.42 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 29.4 29.4 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.00 cfm/ft' 0.23 0.23 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 495.46 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'/ton 2,193.58 Btu/heft' 5.47 -2.89 Grand Total =_> 2,605 278 2,883 100.00 2,616 100.00 Grand Total ==> -1,030 -1,523 100.00 No. People 0.0 0.0/1000 ft' COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft2 (%) MBh cfm °F °F Main Clg 0.2 2.9 2.8 119 77.1 63.2 65.9 55.0 55.0 65.5 Floor 527 Main Htg -1.0 119 70.0 77.9 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 49 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 35 63.1 54.7 51.3 63.1 54.7 51.3 Int Door 1 Preheat 0.0 0 0.0 0.0 ExFlr 0 Total 0.2 2.9 Roof 527 0 0 Humidif 0.0 0 0.0 0.0 Wall 0 0 0 Opt Vent -0.5 35 52.2 65.0 Ext Door 0 0 0 Total -1.5 Project Name: TRACE® 700 v6.3.5 calculated at 04:25 PM on 09/10/2021 Dataset Name: 210887_POE_091021.TRC Alternative - 1 System Checksums Report Page 22 of 22 Room Checksums By COFFMAN ENGINEERS, INC. 218 Commission Meeting Rm COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 7 / 14 Mo/Hr: 7/15 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 80 / 64 / 66 OADB: 81 OADB: 25 SADB 55.0 72.4 Ra Plenum 75.0 70.0 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.5 70.0 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 75.5 70.0 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 1,019 0 1,019 4 1,196 7 Roof Cond -866 -866 17.73 Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 0 0 0 0 0 0 Glass/Door Cond 0 0 0.00 Cooling Heating Wall Cond 0 0 0 0 0 0 Wall Cond 0 0 0.00 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 768 768 Floor 0 0 0 0.00 0 Floor 0 0 0.00 Terminal 768 768 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 768 768 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 0 0 Sub Total =_> 1,019 0 1,019 4 1,196 7 Sub Total =_> -866 -866 17.73 Nom Vent 205 205 AHU Vent 205 205 Internal Loads Internal Loads Infil 0 0 Lights 1,963 491 2,454 10 1,963 12 Lights 0 0 0.00 MinStoplRh 77 77 People 16,000 0 16,000 67 8,000 47 People 0 0 0.00 Return 973 973 Misc 4,369 0 4,369 18 4,369 26 Misc 0 0 0.00 Exhaust 205 205 Sub Total =_> 22,332 491 22,823 95 14,332 85 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 0 0 0 0 0 0 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 224 0 224 1 1,352 8 Ventilation Load -1,126 -1,126 23.06 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat -103 -103 0 OA Preheat Diff. -2,892 59.22 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 26.7 26.7 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.00 cfm/ft' 1.07 1.07 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfmlton 384.63 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'/ton 360.06 Btu/heft' 33.33 -6.79 Grand Total =_> 23,575 387 23,963 100.00 16,879 100.00 Grand Total ==> -1,992 -4,884 100.00 No. People 32.0 44.5/1000 ft2 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWB/HR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft2 (%) MBh cfm OF OF Main Clg 2.0 24.0 17.0 768 75.5 62.7 65.9 55.0 51.9 53.3 Floor 719 Main Htg -2.0 768 70.0 72.4 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 205 63.1 54.7 51.3 63.1 54.7 51.3 Int Door 1 Preheat 0.0 0 0.0 0.0 ExFlr 0 Total 2.0 24.0 Roof 719 0 0 Humidif 0.0 0 0.0 0.0 Wall 0 0 0 Opt Vent -2.9 205 52.2 65.0 Ext Door 0 0 0 1 Total -4.9 Project Name: TRACE® 700 v6.3.5 calculated at 04:25 PM on 09/10/2021 Dataset Name: 210887_POE_091021.TRC Alternative - 1 System Checksums Report Page 20 of 22 KEYNOTES: iT/ ACKSON I MAI RCHITECTUR 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 WWW.JACKSONMAIN.COM COFFMAN N G I N E E R S 1101 2nd Ave., Suite 400 1 Seattle, WA 98101 ph 206.623.0717 1 fax 206.624.3775 coffman.com LASTING creativity I results I relationships RECEIVED Oct 14 2021 CITY OF EDMONDS DEVELOPMENT SERVICES QDEPARTMENT Z O C) _ > L 0 VJ w3:a' c) w CK-JQ LL C) O 0�U) Q 0 Q O wJMo O CU cy) w V 0 Z C� 0 Z u, L trl >- o co w fj� LL m oJ� Q Q Z v�Z Q N� L.L CC G w 0 Z ^O OQ E 2 0 I..L 0- "Zi- w J Z O I- ~ H 2 W m U U toUJI ~ W D_ O Z W N H Q � o F1 PROJECT NO.: 210887 PROJECT MGR.: ON DRAWN BY: CEI CHECKED BY: ON HVAC LOAD CALCS M304 JACKSON I MAIN ARCHITECTURE P.S. © 2021