Loading...
BLD2024-0192_Other_2.13.2024_11.33.44_AM_4056779PV Single Line String 1 11 modules String 2 10 modules String 3 9 modules String 4 8 modules String 5 7 modules 0 EEquipment Schedule A 20 JENVOY I + + 20A/2p I — — — — — A 20A/2p I 1 20A/2p + + In 20A/2p I I——————-20A/2p I 20A/2p + + I I � + � + I + + 0 0 I I Generation Panel Bus: 125A Location: Exterior /A\ Ref. Category Equipment QTY 1 Modules REC410AA Pure 45 2 Inverters Enphase IQ8M-72-M-US 45 3 Jbox JBox 2 4 Loadcenters MLO, 125A, 240V, 1ph, Nema 3R, Surface, 12 space (min.) 1 Breakers 2p20A 6 Monitoring Enphase IQ Monitoring 1 Misc. Enclosure for IQ Gateway NEMA 3 1 0 Conductor Schedule Storage Single Line F ------ 3 I ----I r—— — — — — — AB I I I I I I I A I I I I I I 30A/2p I I --— — — — — — — Z 30A/2p Battery Disconnect, r—— — — — — — — Located within 10' of net meter Service entrance conductors 4/0 XHHW-2 (L1 & L2) 2/0 XHHW-2 (N) TESLA Gateway2 with 200A Internal Panelboard Solar OCPD:80A Battery OCPD:60A NEC 705.12 B 3 (3) ^ 200A I I I — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — I 4/0 XHHW-2 (11-1 & 11-2) I 2/0 XHHW-2 (N) #6 THWN-2 200A/2p (EGC) nverter Specs Watts u Output AC Voltage #of Inverters OCPD Branch ll Enphase IQ8M-72-M-US 325 1.35 240 45 20 ****N/A**** 0 0 0 0 0 ****N/A**** 0 0 0 0 0 Module Specs Watts w Imp Vmp voc Isc REC410AA Pure 410 9.61 42.7 49 10.35 Temp. Adjusted 0 0 38.9 52.8 0 Summary Distance (ft) Current @125% Operating Voltage Voltage Drop V. Drop (total) A (2)#12 CU, (1)#6 EGC, Q Cable, AIR 46.2 18.56A 240V 0.62% 1.70% B (2)#12 CU, (1)#10 EGC, QCable, AIR 6 18.56A 240V 0.15% C (6)#10 CU, (1)#8 N, (1)#10 EGC, THWN-2, 0.7S"EMT(min) 25 18.56A 240V 0.38% D (4)#10 CU, (1)#8 N, (1)#10 EGC, THWN-2, 0.75"EMT(min) 35 13.SA 240V 0.39% E (2)#4 CU, (1)#8 N, (1)#8 EGC, THWN-2, 1"EMT(min) 10 75.94A 240V 0.16% Protected Loads Panel (Existing) Main Service Panel (1ph 240V Service) Main Breaker: 200A Bus Rating:200A 0 Equipment Schedule Ref. Category Equipment QTY 1 Gateway Tesla Backup Gateway2: Service Rated 1 Breakers 200A Main Breaker (Eaton CSR2200N) 1 Misc. Tesla 200A Internal Panelboad Kit 1 Breakers 2p80A, 2p60A 2 Battery Tesla Powerwall 2, 13.5 kWh 2 Misc. Powerwall Stack Kit 1 3 Loadcenters MLO, 125A, 240V, 1ph, Nema 3R, Surface, 4 space (min.) 1 Breakers 12p3OA, 2p30A �--41 Disconnect I 60A 600V 2 Pole I Heavy Duty, No Fuse, Lockable 1 1 0 Conductor Schedule ■ = A & R Scope `,'I'' = Existing or A&RSOLAR Others Scope 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT lO FER ANY RIGHT IN OR LICENSEUSE et Meter COR THE INFORMATION DISCLOSEDTHEREINIT NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. Inverter Specs Watts Output AC Voltage # of Inverters OCPD LAI J�d Tesla Powerwall 2 5000 1 24 240 2 30 Summary Distance (ft) Current @125% Operating Voltage Voltage Drop V. Drop (total) A (4)#10 CU, (2)#10 N, (1)#10 EGC, THWN-2, & com wire, 1"EMT(min) 10 30A 240V 0.25% 0.45% B (2)#6 CU, (1)#6 N, (1)#10 EGC, THWN-2, & com wire, 1"EMT(min) 10 60A 240V 1 0.20% a Q O co00 c�M�m M O E� M p N V)`�' a U (D (6 O rl Vow 0 v7 �z O C: O ■^ O O E L Ln N 70 LU a,,I: 00 REVISIONS Rev. #: I Date: General Notes: Designed by: Tyler M. Project Manager: Utility: SnoPUD Will MacArthur 1. EGC Where exposed to physical damage will be (206) 307-1741 #6AWG Bare CU Current Date:Feb 12, 2024 2. If installing conduit on the roof, maintain greater than 7/8" above the surface 3. NEC 690.12: Rapid Shutdown initiated by AC El Single Line Disconnect Enphase IQ8M-72-M-US ****NSA**** ****NSA**** Module Soecs REC410AA Pure Temp. Adjusted MLPE or RSD? Equipment Mppt Input Module # Modules per String # Strings # of Mods per group # of Mods/inverter # of Inverters Total # of Modules PV Electrical Calculations Watts Output # of OCPD Total AC Comb. EGC AC voltage Array Specs (Adjusted for Temperature ll Inverters Branch out. A OCPD AC 325 1.35 240 45 20 60.8 80 #8 1 nverter 0 0.00 0 0 0 Mppt Input 0 0.00 0 0 0 Amperage (Imp) W(a-t)ts Imp � Voc Isc Temp. Coef V(oc) D Voltage (Vmp) 410 9.61 42.7 49 10.35 -0.24 #10 Max Voltage(DC) 38.9 52.8 Max Amps (DC) ***Select*** L11PIIO3C Il{CJI VI-/L-IVI-VJ L11pIIO3C Il{(JIVI-/L-IVI-VJ L11P11C33C Il{(JIVI-/L-IVI- 1 2 1 3 4 1 2 3 4 1 1 2 1 3 REC410AA Pure REC410AA Pure REC410AA Pure 1 0 0 0 1 0 0 0 1 0 0 1 0 0 0 1 0 0 0 1 0 0 1 0 0 0 1 0 0 0 1 0 0 1 1 1 11 8 26 45 Enphase IQ8M-72-M-US Enphase IQ8M-72-M-US 1 2 3 1 2 3 9.61 0.00 0.00 9.61 0.00 0.00 38.9 0.0 0.0 38.9 0.0 0.0 Enphase IQ8M-72-M-US 1 2 3 9.61 0.00 0.00 38.9 0.0 0.0 11 11 11 11 11 11 1® 1 11 1 11 1® 1 11 1 11 1 1 11 1 11 0 Max Array Power(STC): 18.45kW DC Max Continuous AC Power: 14.625kW AC Interconnection Calcs Main Breaker 200 Bus Bar 200 Max PV OCD AI lowed 40 PVOCPD Device Used 80 Tap or Breaker? Tap Site Conditions ASHRAE Site: Seattle Low Temp(°F) 19 High Do' Temp (°F) 84 High 0.4%Temp (°F) 91 Ref. Conductor Description Distance AL CU Wire Gauge QTY Phase Neutral Neutral EGC (AWG) Wire Type Conduit Min. Conduit 90°C Rating Temp Correct. Fill Derate Derated 75°C Rating Current Operating Voltage Drop ft Conductors AWE Qn Type Ampacity 125% Voltage A Microinverter Branch 46.2 CU #12 2 N/A N/A #6 QCable AIR N/A 30 1 100% 30.00 25 18.6 240 0.62% B Branch to Jbox 6 CU #12 2 N/A N/A #10 QCable AIR N/A 30 1 100% 30.00 25 18.6 240 0.15% C Jbox1 to Combiner 25 CU #10 6 #8 1 #10 THWN-2 EMT 0.75" 40 1 80% 32.00 35 18.6 240 0.38% D Jbox2 to Combiner 35 CU #10 4 #8 1 #10 THWN-2 EMT 0.75" 40 1 80% 32.00 35 13.5 240 0.39% E Combiner to Interconnect 10 Cu #4 2 #8 1 #8 THWN-2 EMT 1" 95 1 100% 95.00 85 75.9 240 0.16% F G H I J DC Voltage Drop 0.00% AC Voltage Drop 1.70% Total Voltage Drop 1.70% &*41. A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. U a M � � o Ln O 00 l0 � Ln U) > Eo fu �Q VpU ova' CA -a YC)� O O E L.Ln a;:j- -0 w C6 ,--I REVISIONS Rev. #: I Date: Designed by: Tyler M. Project Manager: Will MacArthur (206)307-1741 Current Date:Jan 29, 2024 E2 Electrical Calculations