Loading...
Building PermitType: SOLAR Subtype: SOLAR RESIDENTIAL I Status: ISSUED Parcel No: 00441500300400 Site Address: 7410 228TH ST SW EDMONDS,WA 98026-8474 Applied: 2/19/2024 Subdivision: 004415, 004888 Lot: 0 Issued: 2/20/2024 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 8/18/2024 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: JOK Scope of Work: GOLDIE- ROOFTOP SOLAR WA State Contractor L & I #: FREEDFW794Q9 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT LEANN MALLOY 15943 NE CAMERON BLVD, (971)808-7776 PERM ITSEATTLE@FREEDOM FOREVER. PORTLAND OR 97230 COM CONTACT FREEDOM FOREVER 15943 NE CAMERON BLVD, (971)808-7776 PermitSeattle@FreedomForever.com WASHINGTON LLC PORTLAND OR 97230 CONTRACTOR FREEDOM FOREVER 15943 NE CAMERON BLVD, (971)808-7776 PermitSeattle@FreedomForever.com WASHINGTON LLC PORTLAND OR 97230 7410 228TH ST SW, EDMONDS OWNER JULIA GOLDIE WA 98026-8474 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # BLD - PERMIT BASE FEE 001.000.322.10.000.00 $100.00 $100.00 2/20/24 R34989 CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 2/20/24 R34989 PERMIT SOLAR - RESIDENTIAL 001.000.345.83.000.00 $38.00 $38.00 2/20/24 R34989 STATE BUILDING CODE SURCHARGE 001.000.237.150 $6.50 $6.50 2/20/24 R34989 RES TOTALS: $189.50 $189.50 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Tuesday, February 20, 2024 10:35:49 AM 1 of 2 SOLARPerCity mit - • • • •: i 1 125 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ELECTRICAL PERMIT FOR 1 Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION INSPECTIONS - Schedule Online at https:Hinspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES X-1 FIRE FINAL X-3 BUILDING FINAL" Printed: Tuesday, February 20, 2024 10:35:49 AM 2 of 2