Loading...
Building PermitType: COMMERCIAL BLDG Subtype: CHANGE OF USE I Status: ISSUED Parcel No: 00575300000500 Site Address: 22600 96TH AVE W EDMONDS,WA 98020-4532 Subdivision: 004507, 005753, 005590, SP 267 (8-86) Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $0.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: ECP- PARTIAL CHANGE OF USE, NO CONST. WA State Contractor L & I #: Applied: 11/3/2023 Issued:2/22/2024 Final: Expiration Date: 2/16/2025 Issued by: NED CONTACTS NAME TYPE NAME ADDRESS I PHONE EMAIL APPLICANT BRYAN SCHUTT 711 STATE STREETS, KIRKLAND (406)250-9963 BRYAN.H.SCHUTT@GMAIL.COM WA 98033 EDMONDS COOPERATIVE 22600 96TH AVE W, EDMONDS BUSINESS PRESCHOOL WA 98020 CONTACT BRYAN SCHUTT 711 STATE STREETS, KIRKLAND (406)250-9963 bryan.h.schutt@gmail.com WA 98033 CONTRACTOR N/A -NO CONSTRUCTION EDMONDS PRESBYTERIAN 22600 96TH AVE W, EDMONDS OWNER CHURCH WA 98020 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # BLD - PERMIT BASE FEE 001.000.322.10.000.00 $100.00 $100.00 11/9/23 R32584 CHANGE OF USE 001.000.345.83.000.00 $482.00 $482.00 11/9/23 R32584 CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 11/9/23 R32584 PERMIT STATE BUILDING CODE SURCHARGE 001.000.237.150 $25.00 $25.00 11/9/23 R32584 - COM TRANSP ENGINEER REVIEW - 001.000.345.83.400.00 $296.00 $296.00 2/22/24 R35029 INDEPENDENT FEE CALC TRANSPORTATION IMPACT - 001.000.345.83.400.00 $120.00 $120.00 2/22/24 R35029 ADMIN FEE - COM-MF TOTALS: $1,068.00 $1,068.00 Im NOW! 1 CONDITION TYPE STATUS NOTES Printed: Thursday, February 22, 2024 10:37:53 AM 1 of 3 •MERCIAL BLDG PermitCity • • • • - •:0i 1 1 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ESC REQUIREMENTS FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD INFORMATION REQUIREMENTS. FIRE FINAL INSPECTION FOR Request final Fire Department Inspection 425-775-7720. NFORMATION Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. INSPECTIONTYPE it COMPLETED RESULT NOTES X-1 FIRE FINAL X-3 BUILDING FINAL" A-1 BUILDING PRECON Printed: Thursday, February 22, 2024 10:37:53 AM 2 of 3 Printed: Thursday, February 22, 2024 10:37:53 AM 3 of 3