Loading...
ENG2023-0524_WATER AVAILABILITY APPLICATIONRECEIVED Oct 13 2023 WATER AVAILABILITY APPLICATION CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Complete and submit this form through vvray Mv%ttldin I'ermit.com. Submit as a new application using the following prompts: Application Type - Utilities, Activity Type - Utility Availability, Scope of Work - Water Main. SECTION A Applicant hifortriatioii Contact/Applicant Name f < n e-t f Phone Number Email ca sP ' Ci k-L, �� r Address - i`d % City State zip Property• • Project Name — v —� H Ge'�'Li Address 7 rt C Jt .r City E ew'N -7 I State zip 0 Z 0 Parcel No. (--., 043 G { / ( 0 a r'r 0 Does the property currently have water service? 'Yes (City of Edmonds water) ❑ No Describe project (number of buildings, number of units, number of stories per building): ?5 . -�-' "—f- e� •. x z in what phase is the project? ❑ Design Review ❑ Preliminary Plat Building Permit ❑ Rezone or Other Associated permit application number(s), if applicable: SECTION B Exemptions from Utility Availability Study: 1) Single-family residence; 2) Multi -family project of four units or less with combo water/fire lines; 3) Short plat subdivision (four single-family lots or less). Please check one of the following: A utility availability study IS NOT requested/required. The applicant certifies that this project is exempt from needing a study as described above and is not requesting a full utility availability study at this time. Please sign below and submit this form through,�iv-,v,IY vBttiiditi�zPerniit.coni. ❑ A utility availability study IS requested/required for the project, and associated fees will be due. Please submit the complete application through .v-�v.1VivEuil i c Perinit.coni. APPLICANT SIGNATURE: DATE: APPLICANT PRINTED NAME: `` C> (5 0 Y_ Form Updated 3/28/2023