Building PermitType: PLUMBING Subtype: COMMERCIAL PLUMBING I Status: ISSUED
Parcel No: 00580700002206 Site Address: 21420 HIGHWAY 99 EDMONDS,WA 98020
Subdivision: BLA PLN20110037, 005807, SP S-98-44 Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $0.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: MCDONALDS- PLUMBING FOR REMODEL BLD2023-1468
Applied: 11/16/2023
Issued: 3/1/2024
Final:
Expiration Date: 8/28/2024
Issued by: NED
I WA State Contractor L & I #: CAHILPH795RP I
CONTACTS
NAME TYPE
NAME
TO
ADDRESS
PHONE
I
EMAIL
APPLICANT
AMANDA MARTIN
1940140TH AVE W 420,
(425)967-8409
AMARTIN@PMDGINC.COM
LYNNWOOD WA 98036
CONTACT
PM DESIGN GROUP
1940140TH AVE W 420,
(425)967-8409
amartin@pmdginc.com
LYNNWOOD WA 98036
CONTRACTOR
CAHILL PLUMBING
23313 208TH AVE SE, MAPLE
(425)432-1977
email@gmail.com
VALLEY WA 98038
PO BOX 182571, COLUMBUS OH
OWNER
MCDONALDS CORP
43218
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE -PER
001.000.321.99.100.00
$45.00
$45.00
11/16/23
R32724
PERMIT
COMMERCIAL PLUMBING - PLAN
001.000.345.83.000.00
$126.00
$126.00
3/1/24
R35151
REVIEW
EACH PLUMBING FIXTURE ON ONE
001.000.345.83.000.00
$85.00
$85.00
3/1/24
R35151
TRAP
PLUMBING BASE FEE
001.000.322.10.000.00
$57.00
$57.00
11/16/23
R32724
TOTALS: $313.00
$313.00
77
CONDITION TYPE
STATUS
NOTES
Printed: Friday, March 01, 2024 11:32:38 AM 1 of 2
PLUMBING Permit
-
City of • • •
98020 1 � . •
www.edmondswa.gov -
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
INSPECTIONS
- Schedule Online
at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR
COMPLETED
RESULT
NOTES
B-3 PLUMB ROUGH IN
X-0 PLUMBING FINAL"
B-3 PLUMB GROUND WK
B-5 CROSS CONNECTION
Printed: Friday, March 01, 2024 11:32:38 AM 2 of 2