Loading...
BLD2024-0282_Supplementals_Plumbing_Fixture_Counts_3.1.2024_11.18.29_AM_4095690MyBuildingPermit.com Jurisdiction: Edmonds Project Name: Hurt Bath Remodel Application ID: 1450573 Supplemental Name: Plumbing Fixture Counts Enter the # of plumbing fixtures being - installed, altered, repaired, added or relocated Water Heater - Specify GAS or ELECTRIC - QTY # Plumbing fixture on 1 trap or set of fixtures on 1 trap - Include sinks, toilets, tubs, showers, etc. - QTY # 4 Drains w/in footprint of building - Rainwater systems, roof deck drains, etc. - QTY # Re -pipe -Drain, vent or water piping for each fixture served -QTY# 2 Water service line - Replacement or repair - QTY # Water service line - New - QTY # Water treating equipment (water softener) - QTY # Backflow protective device - 2" and smaller -QTY# Backflow protective device - Over 2" - QTY # Graywater or reclaimed water system - In addition to fixtures - QTY # Non -grease waste pre-treatment interceptor - Oil/water separator - QTY # Medical gas piping system - QTY # Grease trap - HGI inside building -QTY# Gravity grease interceptor - GGI - QTY # Gas piping outlets - QTY #