Loading...
Building PermitType: PLUMBING Subtype: RESIDENTIAL PLUMBING I Status: ISSUED Parcel No: 27032500106200 Site Address: 21524 98TH AVE W EDMONDS,WA 98020-3922 Applied: 3/6/2024 Subdivision: KELLOGG SUPPLEMENTAL PLAT OF EDMONDS Lot: 0 Issued: 3/8/2024 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 9/4/2024 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: BAC Scope of Work: PLUMBING -REPLACE TUB W/WALK IN SHOWER-PLB FIXTURES WA State Contractor L & I #: QUALIP*795NU CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT BRYAN HUTCHISON 1112 NW 53RD ST, SEATTLE WA (206)789-7676 BRYANH@QUALITYPLUMBING.CC 98107 CONTACT QUALITY PLUMBING 1112 NW 53RD ST, SEATTLE WA (206)789-7676 bryanh@qualityplumbing.cc 98107 CONTRACTOR QUALITY PLUMBING 1112 NW 53RD, SEATTLE WA (206)789-7676 bryanh@qualityplumbing.cc 98107 OWNER NU'OM H FARIZ 21524 98TH AVE W, EDMONDS (425)220-5848 WA 98020-3922 •' IR, • i k DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE - PER 001.000.321.99.100. 00 $45.00 $45.00 3/8/24 R35459 PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.345.83.000.00 $68.00 $68.00 3/8/24 R35459 TRAP PLUMBING BASE FEE 001.000.322.10.000.00 $57.00 $57.00 3/8/24 R35459 REPIPE - EACH FIXTURE 001.000.345.83.000.00 $17.00 $17.00 3/8/24 R35459 WATER HEATER - INC EXPANSION 001.000.345.83.000.00 $17.00 $17.00 3/8/24 R35459 TANK TOTALS: $204.00 $204.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Friday, March 08, 2024 9:55:22 AM 1 of 2 PLUMBING Permit - City of • • • 980i 1 1 1 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. FOR In addition to the required pressure relief valve an approved listed expansion tank shall EXPANSION TANK INFORMATION be installed on all hot water tanks per UPC 608. GAS PIPE TEST O Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted ORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES B-4 SHOWER PAN B-3 PLUMB ROUGH IN INSPECTOR -CONFIRM SCOPE OF WORK X-0 PLUMBING FINAL" INSPECTOR -CONFIRM SCOPE OF WORK Printed: Friday, March 08, 2024 9:55:22 AM 2 of 2