Building PermitType: RESIDENTIAL BLDG Subtype: DECK I Status: ISSUED
Parcel No: 00619400301002
Subdivision: 006194
Fire Sprinklers:
Valuation: $18,906.00
Code Edition: 0
Site Address: 1011 B AVE EDMONDS,WA 98020
Lot: 0
Lot Area: Zoning:
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: MCCORMICK-DECK
WA State Contractor L & I #: RCCONCR785QQ
Applied: 6/3/2023
Issued: 7/7/2023
Final:
Expiration Date:1/7/2024
Issued by: NED
CONTACTS
NAME TYPE NAME
ADDRESS
PHONE
EMAIL
APPLICANT
PEGGY MCCORMICK
9792 EDMONDS WAY #222,
(425)361-5965
PEGKEL95@GMAIL.COM
EDMONDS WA 98020
CONTACT
PEGGY MCCORMICK
9792 EDMONDS WAY #222,
(425)361-5965
pegkel95@gmail.com
EDMONDS WA 98020
RC CONSTRUCTION &
PO BOX 55965, SHORELINE WA
CONTRACTOR
REMODEL LLC
98133
OWNER
PEGGY G MCCORMICK
9792 EDMONDS WAY 222,
(425)361-5965
EDMONDS WA 98020
•' � •
DESCRIPTION
7BLDRESALUE
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
BASED FEE
001.000.345.83.000.00
$413.00
$413.00
7/7/23
R29848
BLD - RES VALUE BASED REVIEW
001.000.345.83.000.00
$351.05
$351.05
6/5/23
R29089
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
6/5/23
R29089
PERMIT
STATE BUILDING CODE SURCHARGE
001.000.237.150
$6.50
$6.50
7/7/23
R29848
RES
TOTALS: $815.55
$815.55
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Friday, July 07, 2023 3:33:06 PM 1 of 2
'RESIDENTIAL
BLDG PermitCity
-
• • • •
EL
98020 1 1 . •
www.edmondswa.gov•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
FOR
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
INFORMATION
REQUIREMENTS.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
INSPECTIONS - Schedule Online
at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR COMPLETED
RESULT
NOTES
B-1 SETBACKS
B-2 FOOTINGS
B-4 FRAMING
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
A-1 TESC AND MOBILIZE
X-2 ENGINEERING FINAL
Printed: Friday, July 07, 2023 3:33:06 PM 2 of 2