Building PermitType: COMMERCIAL BLDG Subtype: CHANGE OF USE I Status: ISSUED
Parcel No: 00434500000100 Site Address: 9726 EDMONDS WAY A EDMONDS,WA 98020- Applied: 2/15/2024
5940
Subdivision: 004345, 003914
Fire Sprinklers: No
Valuation: $0.00
Code Edition: 2018
Lot Area: 39243
Occupancy Type: B
No. Stories: 0
Scope of Work: EVA SPA- CHANGE OF USE NO P/M NO CONST.
Lot: 0
Zoning: WMU
Construction Type: VB
# of Dwelling Units: 0
WA State Contractor L & I #:
Issued:3/13/2024
Final:
Expiration Date: 3/8/2025
Issued by: NED
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
LARRY JOHNSON
9726 EDMONDS WAY SUITE A,
(206)910-1888
LLEEJJ4@GMAIL.COM
EDMONDS WA 98020
9726 EDMONDS WAY SUITE A,
CONTACT
EVA SPA
(206)910-1888
Ileejj4@gmail.com
EDMONDS WA 98020
CONTRACTOR
OWNER
BERSCHAUER WALTER &
19934 NW HOOD POINT RD,
OWNER
DIANNE
SEABECK WA 98380
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT#
CHANGE OF USE
001.000.345.83.000.00
$482.00
$482.00
2/16/24
R34981
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
2/16/24
R34981
PERMIT
PARK IMPACT - COM ADMIN FEE
001.000.345.83.000.00
$120.00
$120.00
3/12/24
R35577
STATE BUILDING CODE SURCHARGE
001.000.237.150
$25.00
$25.00
3/12/24
R35577
- COM
TOTALS: $672.00
$672.00
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Wednesday, March 13, 2024 8:59:40 AM 1 of 3
•MERCIAL BLDG PermitCity
• • • • -
•:0iBLD2024-0212
www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
ESC REQUIREMENTS
FOR
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
INFORMATION
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
Approval of this permit is not an assurance of full compliance of the Building Code.
LIFE SAFETY INSPECTION
FOR
Verification of code compliance is limited to the elements of construction visible to the
INFORMATION
City Inspector.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
Sound or noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding
SOUND AND NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites and activities must comply with the noise limits of Chapter 5.30, unless a variance
has been granted pursuant to ECC 5.30.120.
Printed: Wednesday, March 13, 2024 8:59:40 AM 2 of 3
Printed: Wednesday, March 13, 2024 8:59:40 AM 3 of 3