APPROVED ENG2024-0060 ROW PERMITRIGHT OF WAY EUC PERMIT
PERMIT
EF3
'
City of • • .
121 Sth Ave N, Edmonds WA 98020 ENG2024- 060]
IL
www.edmondswa.gov
Description: ZIPLY-TRANSFER WIRES FROM OLD POLES TO NEW; REMOVE OLD POLES
ISSUED: 03/14/2024
Address: 20406 76TH AVE W EDMONDS WA 98026-6804
EXPIRES: 09/14/2024
Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00614300000100
CONTACTS
NAME TYPE NAME ADDRESS PHONE
APPLICANT ARIANNE MOMMSEN 426 E CASINO RD, EVERETT WA 98208
(402)670-8384
CONTACT ZIPLY FIBER NORTHWEST LLC 426 E CASINO RD, EVERETT WA 98208
(402)670-8384
CONTRACTOR ZIPLY FIBER NORTHWEST LLC 1220 75TH ST SW, EVERETT WA 98203
(425)231-3928
OWNER EDGEWOOD BAPTIST CHURCH- 20406 76TH AVE W, EDMONDS WA 98026
EDMONDS
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE - PER PERMIT
$45.00 $45.00
ENG - INSPECTIONS
$504.00 $504.00
RIGHT-OF-WAY PERMIT - STANDARD $378.00 $378.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: MAJ DATE: 03/14/2024
Printed: Thursday, March 14, 2024 8:39:56 AM 1 of 2
RIGHT OF WAY EUC PERMIT
PERMIT
City of Edmonds
...
- •:� 1 11.1
www.edmondswa.gov • •
CONDITIONS
CONDITION TYPE
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND AND NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
COMPLETE
A-1 JOB START
E-7 TRAFFIC CTRL
X-2 ENGINEERING FINAL**
E-7 CONCRETE SIDEWALK
E-7 RESTOR LIMITS
Printed: Thursday, March 14, 2024 8:39:56 AM 2 of 2
RECEIVED
Lti�y of ED%�O�
ANC. 1 g90
SECTION A
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
Requirements outlined in Right -of -Way permit Handout E63.
Feb 13 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
If any field is not applicable to your project, write "N/A" instead of leaving blank.
All fields required. Incomplete Applications will be denied.
General Info
Project Name 6004301
Site Address or if no site address use PropertyAddress at NW corner of project area: 20406 76th Ave W, Edmonds, WA 98026
Associated Permits: BLD PLN ENG
Owner and Entity Holding Franchise (if applicable)
Name of Company Ziply Fiber Northwest, LLC Franchise Ordinance No: WN U-17
PointofContact Mike Hakahan
Title Engineer
Address426 E Casino Rd
city Everett
State WA
zip 98208
Phone 425-949-0230
Email mike.hakahan@ziply.com
AuthorizedContractor and Agent •below)
NameofCompany Ziply Fiber Northwest, LLC
Primary Name Mike Hakahan
Agent Name Mike Hakahan
Title Engineer
Title Engineer
Mobile 425-949-0230
Address426 E Casino Rd.
Email mike.hakahan@ziply.com
city Everett
I State WA
zip 98208
Secondary Name
Phone 425-949-0230
Title
Email mike.hakahan@ziply.com
Mobile
City of Edmonds Business License No: 313-013-420
Email
State License No: ZIPLYFN782L3
VI Contractor verifies it is currently bonded
Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential 91 Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
0 Utility Franchise Work associated with development (check one of the above boxes as well)
❑ Traffic Control Only (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
❑ Utility Franchise Work (no associated development)
Project Description
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
Telecommunications and broadband provider Ziply Fiber to access poles along 76th Ave W and
transfer existing utility attachments to new poles, remove old poles.
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
JxJ
LF
SF
Alley 72 hours +
LF
JxJ
F
SF
Parking 72 hours +
LF
JxJ
LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
* telecommunications ❑ cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
1.
CompletedDetails of Work to be
Does the utility owner have existin overhead infrastructure in the area of work?
x
•
2.
Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)?
x
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
X
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility system?
X
5.
Does the work involve proposed additions to an aboveground utility system? If es:
x
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
Details of • to be Completed
®i
6. Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
X
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
X
How many are existing? I I How many are to be added?
6b.
Does your project involve poles? If yes:
How many poles are existing in the project area? 2
What is the height of the existing poles? ,
How many poles are to be removed? 2
Are additional poles to be laced? No
How many? 10 1 What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
X
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: � ' ' 4m-la� DATE: 2i9i2024
APPLICANT PRINTED NAME: Eli Hersman
APPLICANT TITLE: TCP Permit Specialist
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT-COM OBL I G- TRANSFER AND REMOVAL
683' FACILITIES TO NEW PUD POLES
JPN #118442
0
Cg
C95
C�
C95E''
SS 2700 26
C95ES 14,1-2000+
XD.2001-2200+
C95ES 14,2201-2700
203RD ST SW
0
HLLKWAX� 1 1 -2 I
SNO CO PUA #9301 Q I
\ POLE PL U
\ BY PUD /
683'
SS 1500 26
95ES 21.1-600+ —
XD.601-700+ LLJ
ES 21.701-1100+ F1 >
O
C95ES 17.1-25+ Q
XD,26-50+
5ES 17.51-200+ _
~
26,1201-1300+ F2 �
XD.201-300
HLLKWAXX 4
REMOVE 25'
AE-STUB 900 24 —
XD. 1 -25+
C95ES 17.26-501,ff
XD, 51 -1 2fi+
C95ES 17,251-�?5+
XD.151 900
AQ
POLE PLI C10
BY
10'L
i
HLLKWAXC 22S1
SNO CO PUD 9702
0 10
C95ES 715
C95ES 2.216-225
686'
SS 2700 26
C95ES 14.1-2000+
XD,2001-2200+
C95ES 14.2201-2700
3
686' LLJ
>
SS 1500 26 Q
C95ES 21.1-600+
XD,601-700+ _
C95ES 21.701-1100+ F-
C95ES 17.1-200+ Lfl
C95ES 26.1201-1300+
C95ES 17,201-300
OF ZIPLY
FOR CITY STREET IMPROVEMENT
RESTORATION LIMITS TO BE DETERMINED WORK SITE ADDRESS:
BY CITY ENGINEERING INSPECTOR 20406 76TH AVE W, LYNNWOOD, WA
�HLLKWAXX 24 THIS PROJECT WILL TRANSFER Z I PY FACILITIES TO NEW PUD
ZIPLY FIBER POLES PLACED FOR CITY ROAD IMPROVEMENT. ZIPLY WILL
TRANSFER FACILITIES, REMOVE COPPER CABLES, DROPS, THAT
CAN BE REMOVED AND PLACE ONE NEW POLE DUE TO SIDEWALK
c1 CONFLICT. ALL POLES, OF WHICH ZIPLY IS LAST ON, WILL BE REMOVED.
-HL-EKWAXX 22 — — — — — — — — — — — — — — — — ----
ZIPLY FIBER i /�F*PL
*TRIM OUT AE—STUB 900 24 FROM SS 1500 26 IN MH 4
A*REMOVE 900 PR OUT OF DUCT/RISER
L — ANCHOR AND DG AT NEW PUD POLE
SET ANCHOR 2' IN FROM PUD ANCHOR (10' LEAD) I
HLLKWAXX 21 3-111 *TRANSFER 10M STRAND TO NEW POLE
� *PLUMB TWO (2) 4" CONDUITS TO NEW POLE
:J I *REMOVE POLE/DG/ANCHOR
— — — — — — — — — — — — — — — — — — — — — — —
PERMIT
MUNICIPALITY: LYNNWOOD/EDMONDS
❑ BLANKET ❑ NO PERMIT REOUIRED
® TCP/TRAFFIC
Cif DETAILED(NOT BLANKET)
JOINT POLE
JFN/NJUNS TICKET u- 1-1 8442-------
POLE OWNER:__ PUD/ZIPLY
TO:-------------------------------
FROM:-----------------------------
CONSTRUCTION REQUIREMENTS
® FLAGGING
❑ BRUSHING (LIGHT BRUSHING)
❑ CONTRACTOR
TWO PERMITS NEEDED Feb13 2024
LYNNWOOD,EDMONDS
TCP NEEDED CITY OFEDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
NO NEW POLES SHALL BE PLACED
IN EDMONDS RIGHT-OF-WAY
UNDER THIS PERMIT APPROVAL
*CONST. NOTES
PUD ENGINEER:
KARL HAACK— (425) 670-3208
PROJECT CONTACT:
jEROME (JJ) DIDIER
PERTEET INC. — (360) 480-8851
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROLAND DRAINAGE
CAS CODES
6421.000 3421.304
2421.101 3422.104
2411.001 6422.000
3411.504 2441.001
2441.001
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
TRANSFER EXISTING COPPER DROP TO NEW PUD POLE
B I REMOVE POLE ------------ � �
7 _ ZIPIYT iber
-- _J;8 Applicant shall repair/replace all I— TRANSFER ATTACHMENT
damage to utilities or frontage I D I
i*TRANSFER FIBER DROP IF EXISTING I
improvements in City right-of-way *REMOVE COPPER DROPS TO HOUSE AND REMOVE NID
way
9 per city standards that s caused or L _ � *REMOVE POLE occurs during the permitted project.
L--------------------� T�
_ _ _ _ _ _ _ _ _ _ _ PROJECT6004301 / P-075874 C.O. AREA: LYNNWOOD
J LPL 35' CL 2 TF NUMBER: EXCH. CODE: 51419
ENGINEERING DIVISION I ('` $1 ZIPLY ENGR: MIKE HAKAHAN
APPROVED AS NOTED V -*PL ANCHOR AND DG-8 LEAD b PHONE: 425949.0230
L _ LPL DOUBLE 10' ARMS I CALL BEFORE YOU DIG DRAWN DATE: ATCO ENGR: L.STUTZMAN CNTY: SNOHOMISH
*TRANSFER ATTACHMENTS e-:-:
72 HOURS NOTICE BEBUIBED I-17.2024 PHONE: 360 563-9000 FILE:
-1?011 10A n,04z 03/12/2024 L�cREMOVE POLE _ _ _ _ _ � SCALE: TAX DISTRICT: 3748F DWG 1 OF 2
VV TWNSHP:27N RNG:4E SEC:19
\6004301—OBLIG-20406 76th AVE W 1/24/2024 11:54:24 AM
1404'
SC1 SS 600 24
C95ES 2.901-946+
XD.47+
C95ES 2.948-975+
XD,976-999+
XD.100+
C95ES 2.1001-1095+
XD.196+
C95ES 2.1097-1103+
XD,1104+
C95ES 2.1105-1106+
XD.1107-1109+
C95ES 2.1110-1114+
XD.1115+
C95ES 2,1116+
XD.1117-1118+
C95ES 2.1119-1121+
XD.1122+
C95ES 2.1123-1124+
XD,1125+
C95ES 2.1126-1136+
XD.1137+
C95ES 2.1138-1412+
XD.1413+
C95ES 2,1414-1424+
XD.1425+
C95ES 2.1426-1487+
XD.1488-1500
451'
C2 SS 51 24
XD.601-625+
C95ES 17.626-650+
XD.51
621'
C3 SS 600 24
C95ES 2.501-525+
XD.26-50+
C95ES 2.551-600+
C95ES 2.1-50+
XD.51-75+
C95ES 2.76-159+
XD,160+
C95ES 2.161-175+
XD.176-200+
C95ES 2.201-300+
XD.301-325+
C95ES 2.326-350+
XD.451-475+
C95ES 2.376-400+
XD.501-600
)S gk
,,p I
� 2
y
NEED A 2'X12' EASEMENT FOR
ANCHOR/DG/A TACHMENTO P
4-1
I
I� of
fiR
V9��1118f9'�'111
2161'
Cq LS 100 22
XD.801-850+
C95ES 2.851-853+
XD.54-55+
C95ES 2.856+
XD,57+
C95ES 2.858-897+
XD.98+
C95ES 2.899+
XD.100
4073'
9 C5 LS 200 24
C95ES 2.601-800
- Transmission Line
q�
�p s
NEED AN EASEM
TO PL POLE AND
2'XV In
751'
C6 SS 51 24
XD.601-625+
C95ES 17.626-650+
XD.51
8SS8621'
600 24
C95ES 2.501-525+
XD,26-50+
C95ES 2,551-600+
C95ES 2,1-50+
XD.51-75+
C95ES 2.76-159+
XD,160+
C95ES 2,161-175+
XD.176-200+
Stu. zu, I. zi Iv, r C95ES 2,201-300+
XD.301-325+
C95ES 2.326-350+
XD.451-475+
C95ES 2,376-400+
XD.501-600
204TH ST SW -
X
2161'
LS 100 22
XD.801-850+
1404'
Cg SS 600 24
C95ES 2,901-946+
XD.47+
C95ES 2.948-975+
XD.976-999+
XD.100+
C95ES 2,1001-1095+
XD.196+
C95ES 2.1097-1103+
XD,1104+
C95ES 2,1105-1106+
XD.1107-1109+
C95ES 2,1110-1114+
XD.1115+
C95ES 2.1116+
XD.1117-1118+
C95ES 2,1119-1121+
XD.1122+
C95ES 2.1123-1124+
XD,1125+
C95ES 2,1126-1136+
XD.1137+
C95ES 2,1138-1412+
XD.1413+
C95ES 2.1414-1424+
XD.1425+
C95ES 2.1426-1487+
C95ES 2.851-853+ XD,1488-1500
XD.54-55+
C95ES 2.856+
XD.57+
C95ES 2.858-897+
XD.98+
C95ES 2.899+
XD.100
HLLKWAXX 77855 FTTP PIGTAIL 50OFT
IN:HLLKWAXX H6008.15-16+
XD,3-4
HLLKWAXX 77851 FDT A STRN 4 PORT OUT:
IN:HLLKWAXX H6008.21-24
OUT:
O
00
s
9
O
m
N
2
m
FT-1\EtEMOVE
C12
REMOVE
HLLKWAXX 77853 FTTP PIGTAIL 20OFT
IN:HLLKWAXX H6008.17-20
OUT: I
HLLKWAXX 3 2-46
SNO CO PUD #10066
POLE PL
7F5 BY PUD
E i� l
/204TH ST SW ^
HLLKWAXX 2 2-45
SNO CO PUD #10065 G13
POLE PL
BY PUD REMOVE
cU
REMOVE
*TRANSFER ATTACHMENT
TO-1 JE *TRANSFER ONE 2" RISER
CALL RPbE YOU DIG TRANSFER ANY FIBER DROPS
REMOVE EXISTING COPPER DROPS TO NID
R-1-I INREMOVE POLE
72 HOURS NOTICE REOUIREO
O � �
ono �
P rn
o co o
F
r--
RE MOVE/
C14
0
C'
REMOVE
R9SFs 0
6
9'3
S850 01.2007
F1 YJD
HLLKWAXX FC1032.181-402+
XD.223-288
S5040 01.1990
F2 YGD 16
HLLKWAXX T14.1-16
1844 02.2008
F3 RBN 144
HLLKWAXX H6001.1-16+
HLLKWAXX H6001.26-31+
HLLKWAXX H6001.17-25+
HLLKWAXX H6001.32-136+
XD.137-144
974 06.2008
F4 REIN 48
HLLKWAXX H6008.1-24+
XD,25-48
500 06,2008
F5 FTTP PIGTAIL 50OFT 4
HLLKWAXX H6008.15-16+
XD.3-4
1000 06.2008
F6 FTTP MULTIPORT 6
HLLKWAXX H6008.10-14+
XD.6
REMOVE
165' PL 97
C 1 0 AKF 900 26
XD.1-25+
C95ES 17.26-50+
XD.51-125+
C95ES 17.251-275+
XD.151-900
Z�'9
C95ES E551
C95ES 17.26-50
REMOVE
128' PL 99
C 1 1 AE 50 24
XD. 101 -125+
C95ES 17,626-650
REMOVE
227' PL 80
C 1 2 AE 50 24
XD.101-125+
C95ES 17.626-650
REMOVE
198' PL 80
C 1 3 AE 50 24
XD.101-125+
C95ES 17,626-650
REMOVE
21 0' PL 99
C 1 4 jAKF 25 26 j
C95ES 17,26-50 J
REMOVE
189' PL 2000
C 1 5 AKF 25 24
[C95ES 17.26-501
REMOVE
496' PL 97
C 16 [AKF 25 26
``C95ES 17,26-50]
REMOVE
450' PL 80
C 1 7 AE 25 26
IC95ES 17,626-6501
REMOVE
238' PL 80
C 1 8 AKF 25 26
C95ES 17.26-501
HLLKWAXX 77854 FTTP MULTIPORT
IN:HLLKWAXX H6008.10-14+
XD.6
OUT:
F 6 2h
At
204TH ST SW
18 L-HLLKWAXX 3S1 2-47 %15
SNO CO PUD #1 c4
REMOVE REMOVE
L*TRANSFER ATTACHMENT
TRANSFER ANY FIBER DROPS
*REMOVE EXISTING COPPER DROPS TO NID
*REMOVE CABLE ARM AND POLE
HLLKWAXX 10 2-48
SNO CO PUD .#1
RECEIVED
Feb 13 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
PERMIT
MUNICIPALITY: LYNNWOOD/EDMONDS
❑ BLANKET ❑ NO PERMIT REQUIRED
® TCP/TRAFFIC
(I DETAILED(NOT BLANKET)
JOINT POLE
JFN/NJUNS TICKET #_118442 --------
POLE OWNER: __ PUD/Z 1 PLY --------
TO: -------------- -----------------
FROM:-----------------------------
CONSTRUCTION REQUIREMENTS
Z FLAGGING
❑ BRUSHING (LIGHT BRUSHING)
❑ CONTRACTOR
TWO PERMITS NEEDED
LYNNWOOD,EDMONDS
TCP NEEDED
*CONST. NOTES
PUD ENGINEER:
KARL HAACK- (425) 670-3208
PROJECT CONTACT:
jEROME (JJ) DIDIER
PERTEET INC. - (360) 480-8851
CAS CODES
6421.000
3421.304
2421.101
3422.104
2411.001
6422.000
3411.504
2441.001
2441.001
Ziplyf iber
r fl1,JJ C L. I V .V. nn- L IIIIIIE000
NUMBER:6004301 / P-075874 EXCH. CODE: 51419
ZIPLY ENGR: MIKE HAKAHAN
PHONE: 425 949-0230
DRAWN DATE: ATCO ENGR: L.STUTZMAN CNTY: SNOHOMISH
1-17-2024 PHONE: 360 563-9000 FILE:
SCALE: TAX DISTRICT: 3748F DWG 2 OF 2
TWNSHP:27N RNG:4E SEC:19
\6004301-OBLIG-20406 76th AVE W 1/24/2024 11:56:22 AM
20305 76th Ave W I O
Edmonds, Washington
• Google Street View
Aug 2023 See more dates
I 7� ti1
1igk ' �s� ... ;� ' , ,• ,.ter. t
ot
6.
JAVY
s "�rk-
f.
1• . !t . • 1 i� RAC ' r � � .. �- - , " !'' - "
GO
T•
203 ST SW
Goggle
kr-96C —Aug2023 02024Goog6 United States Terms Privacy Report problem
20406 76th Ave W O
Edmonds, Washington •
• Google Street View ; �"�•.
Aug 2023 See more dates
IC
I At
.76th Ave W • 204th St
.r `,r- L4
Transfer attachments t•
new 1 .{� r+ry. • .
pole, remove • • • •
)]
s
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
LEGEND:
OS
SIGNALIZED INTERSECTION
OCONE
(CANDLESTICK)
®
TYPE III BARRICADE
WORKTRUCK
WORK ZONE LIMITS
OWE
WARNING SIGN
ARROW BOARD
REQUIRED)
(WHERE
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
FLAGGER-SPOTTER
FLAGGER STATION
—
JURISDICTION LINE
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
RAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
SIGN LEGEND:
PHASE 1
a z
ROAD BIKE BIKES LANE RIGHT LANE MERGE CENTER LANE KEEP SIDEWALK
WORK CLOSED> < CLOSED WITH CLOSED < > CLOSED
AHEAD AHEAD AHEAD TRAFFIC AHEAD � MAY USE ONLY
RIGHT FULL LANE
W20-1 BIKE CLOSED W20-5R BIKE MERGE W1-4L W20-5C R4-7B R4-11 W14R R3-5r R9-9
ANY WORK AFFECTING TRANSIT
OPERATI❑NS OR FACILITIES CONTACT CIC
@ 425-348-7100
ASK FOR C❑NSTRUCTI❑N SUPERVIS❑R
PR❑VIDE ONE WEEK N❑TIFICAI❑N FOR
BUS STOP IMPACTS
ARROW
\ PREPARATORY
ACADEMY
LANE SHIFT
203RD ST SW 202ND PL SW
(25 MPH) TRAFFIC CONTROL INSPECTION SHALL BE 25 MPH
REQUIRED WHENEVER WORK ZONE IS SET UP I r
W20-1\ CITY OF
xF_ � 4 EDMOND S
POLE 1,
GRASS GRASS GRAB -,.
SIDEWALK SIDEWALK SIDEWALK BUS STOP 1 D/W
BIKE LANE BIKE LANE BIKE LANE
r-1 $ 1 • • • •1 ��
D
o
BIKE LANE BIKE LANE
SIDEWALK
n�
GRASS
GRA55
�I
FR
WORK DETAILS:
TRANSFER EXISTING COPPER DROP
O TO NEW POLE, REMOVE OLD POLE.
SPOTTER NEEDED FOR PEDESTRIAN
TRAFFIC AND DRIVEWAY ACCESS,
I
RECEIVED
Feb 13 2024
CITY OF EDMONDS
PRIVATE 204TH ST SW DEVELOPMENT SERVICES
DEPARTMENT
ROAD (25 MPH)
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH)
25 30 35
40
45
50
55
60
64
70
LENGTH (feet)
155 1 200 1 250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
1m
GRASS
LANE SHIFT
GRASS
• • • • • • • • 0 O 0 O -• 4
o O •
--60' BIKE TAPE
R4-11 ,
MERGE
CLOSED
I
��
�'1
BIKE LANE
c�
c)
Mn11F 11 I I I
R3-5r\R3-5r R4-7B \R3-5r \ GRASS GRASS GRASS
76TH AVE W
LR4-7BJ
' OPENINJ (30 MPH / 20 MPH SCHOOL) END SCHOOL ZONE
CONTRACTOR TO C❑ORDINATE WITH COLLEGE
PLACE ELEMENTARY SCHOOL, COLLEGE PLACE
MIDDLE SCHOOL, AND ARROW PREPARATORY
ACADEMY 72 HOURS IN ADVANCE
CITY OF
LYNNWOOD
NOTE:
MON. - FRI. = 7:00am TO 4:00pm
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER
TANGENT
50/70 1 40
1 80
35/45 30
60
25/30 20
40
MINIMUM LANE SHIFT TAPER LENGTH = L/2 (feet)
LANE
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
10
55
75
105
135
225
250
275
300
325
350
11
60
85
115
150
250
275
305
330
370
385
12
65
90
125
160
270
300
330
360
390
420
ENGINEERING DIVISION
APPROVED AS NOTED f
jd] V03/12/2024 202ND ST SW
-pV (25 MPH)
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
lit " O
ATCO COMMUNICATIONS SERVICES. LLC
www.atcoteiecom.com
360.563.9000
708 First Street
Snohomish, WA 98290 J
ziPylfiber
Everett, WA 98206
CD (M O U)
CD 0 0� ~
U)
ui
� H
v
N
O 06
WLU
2
W
Q �
O
v
0
z
Q
0
cz
z
0
U
U
LL
LL
Q
ff
w
n
DATE:
2.2.2024
REVIEWED BY:
M. LUNA
WTCS# 013184
DESIGNED BY:
E. HERSMAN
ATCO CONTACT:
512-627-6114
eli.hersman@atcotelecom.com
SCALE:
SHEET:
1"=70'
02
NO: 2OF7
LEGEND:
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
OS
SIGNALIZED INTERSECTION
OCONE
(CANDLESTICK)
®
TYPE III BARRICADE
WORKTRUCK
WORK ZONE LIMITS
OWE
WARNING SIGN
ARROW BOARD
REQUIRED)
(WHERE
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
FLAGGER-SPOTTER
FLAGGER STATION
— JURISDICTION LINE
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
IAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATIOP
4PPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORI'
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
PHASE 2
a z
SIGN LEGEND:
ROAD BIKE > <i > BIKES KEEP
RIGHT LANE LANE MERGE CENTERLANSIDEWALK
WORK CLOSED CLOSED WITH CLOSED � CLOSED
AHEAD AHEAD AHEAD TRAFFIC LFULL
USE AHEAD
LANE < > < RIGHT ONLY
W20-1 W20-5R BIKE CLOSED W1-4L BIKE MERGE R4-11 W1-4R W20-5C R4-7B R3-5r R9-9
ANY WORK AFFECTING TRANSIT
❑PERATI❑NS OR FACILITIES CONTACT CIC
@ 425-348-7100
ASK FOR C❑NSTRUCTI❑N SUPERVIS❑R
PR❑VIDE ONE WEEK N❑TIFICAI❑N FOR
BUS STOP IMPACTS ARROW
\ PREPARATORY
ACADEMY
5' LANE SHIFT TAPE
POLE 22S1
R4-78F W1-4R� R9-9�MH 4�
GRASS
a
\ a ' • • • • o \120 0•
• • ��-•�—
I
— it
BIKE LANE A
BIKE LANE
SIDEWALK SIDEWALK
E000ou
\\GRASS \\
SS GRASS
GRASS R4
`W20-1 `W20-5C
X X
W20-1
W20—
WORK DETAILS:
ACCESS MH 4 AND REMOVE CABLE
FROM DUCT AND RISER,
SPOTTER NEEDED FOR PEDESTRIAN
TRAFFIC AND DRIVEWAY ACCESS,
3
Q Vu
PRIVATE 204TH ST SM
ROAD (25 MPH)
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH)
25 30 35
40
45
50
55
60
64
70
LENGTH (feet)
155 1 200 1 250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
216'
Gaass
BUS STOP
BIKE I
�--•--•--_ram
I IF11p'�yi/.1�:�
11111�11111111111
203RD ST SW
(25 MPH)
TRAFFIC CONTROL INSPECTION SHALL BE
REQUIRED WHENEVER WORK ZONE IS SET UP
CITY OF
EDMOND S
x
W20-1
b4
5' LANE SHIFT TAPE
8' BIKE TAPE X X
X
it
W1-4L W20—SR
W20 1
R4-11 BIKE
MERGE
BIKE
GRASS
_....
�,�,-- DM sI
CLOSED
O • •
•
nv BIKE LANE •
•BIK�LA BIKE LANE
-`
C=C>
GRASS
CITY OF
LYNNWOOD
202ND PL SW
(25 MPH)
_ 76TH AVE W
(30 MPH)
O
ATCO COMMUNICATIONS SERVICES. LLC
www.otcoteiecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
ziPylfiber
Everett, WA 98206
(M O to
CD o 0'� ~
to
ui
N
z 06
O
WLU
2
LU
Q
2
H
C7
O
C)
0
GRASS GRASS GRASS
23-5r R4-76
(30 MPH7/ 20AMPH SCHOOL) END SCHOOL ZONE m
w
�
o
CONTRACTOR TO C❑❑RDINATE WITH COLLEGE z
Q
PLACE ELEMENTARY SCHOOL, COLLEGE PLACE
MIDDLE SCHOOL, AND ARROW PREPARATORY U
U
ACADEMY 72 HOURS IN ADVANCE
Q
CL
CL
ENGINEERING DIVISION RECEIVED
APPROVED AS NOTED
Feb 13 2024
DATE:
NOTE:
MON. - FRI. = 7:00am TO 4:00pm
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER
I TANGENT
50/70 40
80
35/45 30
60
25/30 20
40
MINIMUM LANE SHIFT TAPER LENGTH = L/2 (feet)
LANE
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
10
55
75
105
135
225
250
275
300
325
350
11
60
85
115
150
250
275
305
330
370
385
12
65
90
125
160
270
300
330
360
390
420
"I il WL.-111,44z 03/12/2024 CITY OF EDMONDS
VV DEVELOPMENT SERVICES
DEPARTMENT
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
a
Z o_
U
Q o
m
0
o
L�_ o
O
cz
z
O
U
U
LL—
LL-
w
L� g
z
LU
_J
LL
2.2.2024
REVIEWED BY:
M. LUNA
WTCS# 013184
DESIGNED BY:
E. HERSMAN
ATCO CONTACT:
512-627-6114
eli.hersman@atcotelecom.com
SCALE:
SHEET:
1"=70'
03
1
NO: 3 OF 7
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
LEGEND:
OS
SIGNALIZED INTERSECTION
OCONE
(CANDLESTICK)
®
TYPE III BARRICADE
WORKTRUCK
WORK ZONE LIMITS
OWE
WARNING SIGN
ARROW BOARD
REQUIRED)
(WHERE
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
FLAGGER-SPOTTER
a8o
FLAGGER STATION
— JURISDICTION LINE
GRASS
SIDEWALK
BIKE I
{{BIKE LANE
GRASS n
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
4AKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
PHASE 3
a=
SIGN LEGEND:
BIKE BIKESROAD RIGHT LANE LANE MERGE • CENTER LAN KEEP SIDEWALK
WORK CLOSED CLOSED WITH CLOSED CLOSED
AHEAD AHEAD AHEAD TRAFFIC MAY USE AHEAD
FULL LANE RIGHT ONLY
W20-1 W20-5R BIKE CLOSED W1-4L BIKE MERGE W20-7A R4-11 W1-4R W20-5C R4-7B R3-5r R9-9
ANY WORK AFFECTING TRANSIT
❑PERATI❑NS OR FACILITIES CONTACT CIC
@ 425-348-7100
ASK FOR C❑NSTRUCTI❑N SUPERVIS❑R
PR❑VIDE ONE WEEK N❑TIFICAI❑N FOR ARROW
BUS STOP IMPACTS PREPARATORY
ACADEMY
R4-7B 5' LANE SHIFT TAPE
GRASS
SIDEWALK
BIKE LAN;
• 0 0 0 . O1
—-- :.0— ,
BIKE LANE
SIDEWAL
GRASS
LO-7A
WORK DETAILS:
PLACE RISERS AND TRANSFER
Q ATTACHMENTS TO NEW POLE,
REMOVE OLD POLE.
REMOVE CABLE BETWEEN POLE 22S1
0 AND POLE 1,
SPOTTER NEEDED FOR PEDESTRIAN
TRAFFIC AND DRIVEWAY ACCESS,
POLE
GRASS
7 O - L
O O O O O O O
OUPO
o �O
203RD ST SW
(25 MPH)
BIKE LANL O
O O
_0 0 o0.2oo-411-0--o
202ND PL SW
TRAFFIC CONTROL INSPECTION SHALL BE (25 MPH)
REQUIRED WHENEVER WORK ZONE IS SET UP
CITY OF
E'DMOND S
i7 U
5' LANE SHIFT TAPER—{— 6a' BIKE
GRA"
JJGL BALK
B7SSSI77KE LANE
O
m
W20-7A Wi-4L W20-5R
R4-11 BIKE BIKE
GRA MERGE CLOSED GRAS O
5p W DOOM
O BIKE LANE
a � �
D/WSTop'4D/W
D/WD/W
R4-78
3RA5�
GRASS
R3—
GSr55R4-78R3-5r76TH
GRASS
GRASS
7R4_7B
R3
AVE Ww2o-7A
PENIN (30 MPH / 20 MPH
SCHOOL) END SCHOOL
ZONE
TRAFFIC HALT
NO MORE THEN 5 MIN, ACROSS
76TH AVE W
TO ALLOW AERIAL REMOVAL
CONTRACTOR TO C❑❑RDINATE
WITH COLLEGE
POLE
PLACE ELEMENTARY SCHOOL,
COLLEGE PLACE
MIDDLE SCHOOL, AND ARROW
PREPARATORY
ACADEMY 72 HOURS IN
ADVANCE
In
PRIVATE 204TH ST SW
ROAD (25 MPH)
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH)
25 30 35
40
45
50
55
60
64
70
LENGTH (feet)
155 200 250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
RECEIVED
Feb 13 2024
CITY OF EDMONDS
CITY OF
LYNNWOOD
DEVELOPMENT SERVICES
DEPARTMENT
NOTE:
MON. - FRI. = 7:00am TO 4:00pm
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER
TANGENT
50/70 40
80
35/45 30
60
25 / 30 20
40
MINIMUM LANE SHIFT TAPER LENGTH = L/2 (feet)
LANE
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
10
55
75
105
135
225
250
275
300
325
350
11
60
85
115
150
250
275
305
330
370
385
12
65
90
125
160
270
300
330
360
390
420
�2
000000
E�
ENGINEERING DIVISION
APPROVED AS NOTED
%i1 UlQ✓.,7a1.,,np 03/12/2024 202ND ST SW
Vill (25 MPH)
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
lit " O
ATCO COMMUNICATIONS SERVICES. LLC
www.atcoteiecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
ziPylfiber
Everett, WA 98206
CD (M O U)
CD U)
ui
N
O 06
LU
LU
W
Q �
2
C,
C)
0
3
a
a
U
0
m
0
0
0
ff
G
w
To
DATE:
2.2.2024
REVIEWED BY:
M. LUNA
WTCS# 013184
DESIGNED BY:
E. HERSMAN
ATCO CONTACT:
512-627-6114
eli.hersman@atcotelecom.com
SCALE:
SHEET:
1"=70
04
NO: 4OF7
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
LEGEND:
OSIGNALIZED
INTERSECTION
OCONE
(CANDLESTICK)
®
TYPE III BARRICADE
WORK TRUCK
WORK ZONE LIMITS
WARNING SIGN
ARRW BOARD
REQUIRED)
(WHERE
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
FLAGGER-SPOTTER
FLAGGER STATION
— - - —
JURISDICTION LINE
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
SIGN LEGEND:
ROAD BE ROAD EDWORK PREPARED CLOSED TO STOP AHEAD AHEAD ONLY
W20-1 W20-71B W20-7A W20-3 K-6664 R3-5r
ANY WORK AFFECTING TRANSIT
❑PERATI❑NS OR FACILITIES CONTACT CIC
@ 425-348-7100 ASK FOR CONSTRUCTION SUPERVIS❑R PREPARATORYARROW
OW
CITY OF PR❑VIDE ONE BUS STEP IMPACTS AI❑N FORACADEMY
E'DMOND S
x x
76TH AVE W W20-7A
w2o-76
(30 MPH / 20 MPH SCHOOL) jW20-3
GRASS GRASS GRASS { GRASS
0/W SIGEWALK c FWAiK SIDEWALK BUSSTOP
a
UPO
— —
— — r
—
=
—
O
o
BIKE LANE
BIKE LANE
SIDEWALK
SIDEWALK
D�
GRASS
W20-3
W20-7B
W20-7AW20-1LW20—,l
X
X
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH)
25
30
35
40
45
50
55
60
64
70
LENGTH (feet)
155
200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
PHASE 4
a z
WORK DETAILS:
TRANSFER ATTACHMENTS AND FIBER
DROPS TO NEW POLE, REMOVE
0 EXISTING COPPER DROPS AND OLD
POLE.
( REMOVE CABLE.
w SPOTTER NEEDED FOR PEDESTRIAN
TRAFFIC AND DRIVEWAY ACCESS,
203RD ST SW TRAFFIC HALT NO MORE THEN 5 MIN. ACROSS
(25 MPH) PRIVATE ROAD TO ALLOW AERIAL CR❑SSING
GRASS GRASS
K-6664 FLAGGER TO ESCORT LOCAL
RESIDENTIAL TRAFFIC
THROUGH WORK AREA
GRASS
' CITY OF
P°`�' LYNNWOOD
Q
� x
PRIVATE
A
_
MATCH LINESEE SHEET_ "A"
( 6)
NOTE:
MON. - FRI. = 7:00am TO 4:00pm
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER
TANGENT
50/70 40
80
35/45 30
60
25/30 20
40
MINIMUM SHOULDER TAPER LENGTH = L/3 (feet)
SHOULDER
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
8
40
40
60
90
120
130
150
160
170
190
10
40
60
90
90
150
170
190
220
220
240
USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8'
RACT❑R TO COORDINATE WITH COLLEGE
ELEMENTARY SCHOOL, COLLEGE PLACE
)LE SCHOOL, AND ARROW PREPARATORY
ACADEMY 72 HOURS IN ADVANCE
76TH AVE W
(30 MPH)
TRAFFIC CONTROL INSPECTION SHALL BE
REQUIRED WHENEVER WORK ZONE IS SET UP
ENGINEERING DIVISION RECEIVED
APPROVED AS NOTED Feb 13 2024
Jp�X ��, y �Q 03/12/2024 CITY M E T ONDS
SERVICES
ERVI
— DEVELOPMENT SERVICES DV
DEPARTMENT
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
j"a
ATCO COMMUNICATIONS SERVICES, LLC
www.otcoteiecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
ziPylfiber
Everett, WA 98206
0
(M
V
0
0
IY
LU
m
z
U
LU
O
IY
CL
N
O
00
rn
ui
0
z
O
2
0
LU
LU
Q
I—
I-
Q0
0
C>
N
N
w
Of
0
0
Q
U
LU
O
a-
Q
n
W
w
n
DATE:
2.5.2024
REVIEWED BY:
M. LUNA
WTCS# 013184
DESIGNED BY:
E. HERSMAN
ATCO CONTACT:
512-627-6114
eli.hersman@atcotelecom.com
SCALE:
SHEET:
1"=70'
05
NO: 5OF7
LEGEND:
0
SIGNALIZED INTERSECTION
OCONE
(CANDLESTICK)
®
TYPE III BARRICADE
WORKTRUCK
WORK ZONE LIMITS
OWE
WARNING SIGN
ARROW BOARD
REQUIRED)
(WHERE
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
FLAGGER-SPOTTER
FLAGGER STATION
— JURISDICTION LINE
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
1AKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
PHASE 5
a z
SIGN LEGEND:
BIKE BIKESROAD LANE MERGE KEEP SIDEWALK SIDEWALKCLOSED
RIGHT LANE Sb CLOSED CENTER LAN
WORK CLOSED CLOSED
WITH AHEAD CLOSED cRos
AHEAD AHEAD TRAFFIC MAY USE <* <�
FULL LANE RIGHT ONLY
> < >
W20-1 BIKE CLOSED W20-5R BIKE MERGE W14L R4-11 W14R W20-5C R4-7B R3-5r R9-9
WORK DETAILS:
PLACE ANCHOR AND DOUBLE ARMS,
Qt TRANSFER ATTACHMENTS TO NEW
POLE, REMOVE OLD POLE.
SPOTTER NEEDED FOR PEDESTRIAN
TRAFFIC AND DRIVEWAY ACCESS,
R4—
a o a a
• nn
SIDEWALK I SIDEWALK O 11 11 11nlr O
�1 I�CLOSED �\ '—,BIKE
R4-11 III II`I L
ANY WORK AFFECTING TRANSIT
❑PERATI❑NS OR FACILITIES CONTACT CIC
@ 425-348-7100
ASK FOR C❑NSTRUCTI❑N SUPERVIS❑R
PR❑VIDE ONE WEEK N❑TIFICAI❑N FOR
BUS STOP IMPACTS
COLLEGE PLACE
MIDDLE SCHOOL
BIKE TAPER—%-85' LANE SHIFT
CITY OF
EDMOND S
76TH AVE W
(30 MPH / 20 MPH SCHOOL)
GRASS GRASS R3-5r�
SIDEWALK AL
SIDEWALK
BIKE LANE
O O O-t�•
SCHOOL ENTRANCE
PRIVATE ROAD
SIDEWALK
GRASS
POLE
COLLEGE PLACE
CITY OF ELEMENTARY SCHOOL
CONTRACTOR TO C❑❑RDINATE WITH COLLEGE
L YNN WO OD PLACE ELEMENTARY SCHOOL, COLLEGE PLACE
MIDDLE SCHOOL, AND ARROW PREPARATORY
ACADEMY 72 HOURS IN ADVANCE
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH)
25 30 35
40
45
50
55
60
64
70
LENGTH (feet)
155 200 250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
NOTE:
MON. - FRI. = 7:00am TO 4:00pm
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER
TANGENT
50/70 40
80
35/45 30
60
25/30 20
40
MINIMUM LANE SHIFT TAPER LENGTH = L/2 (feet)
LANE
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
10
55
75
105
135
225
250
275
300
325
350
11
60
85
115
150
250
275
305
330
370
385
12
65
90
125
160
270
300
330
360
390
420
ARROW
PREPARATORY
ACADEMY
-11a (R) R4-7B R4-713W20-5C-\l W20-1-\j
GR, hh
SIDEWALK BUS TOP
BIKE LANE
• r-I r-I r-I1
O • 1 [ ' )
II II I li�r BUS "W
Wi-4R
—9/
?0_1
5' LANE SHIFT
3
�
w2o-1
I
Q
b4
PRIVATE
204TH ST SW
ROAD
(25 MPH)
O
ATCO COMMUNICATIONS SERVICES, LLC
www.atcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
ziPIy fiber
Everett, WA 98206
(M O to
ui
o
N
Z off$
O
2
LU >
Q
2
LU
Q �
I—
I-
Q0
C>
N
W
w
m
�
z
Q
U
U
Z
O
LU
LU
O
O
U
O
RECEIVED
a
J
Feb 13 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
i�
a
Z a
U
Q o
m
O
o
L� (.0
0
z
O
U
U
1�
Cw
L� g
z
LU
_J
ILL
DATE:
2.2.2024
REVIEWED BY:
M. LUNA
WTCS# 013184
DESIGNED BY:
E. HERSMAN
ATCO CONTACT:
512-627-6114
eli.hersman@atcotelecom.com
SCALE:
SHEET:
1"=70'
07
NO: 7OF7
j'StSW
14
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
UCu1 k4I ct r d I II
Body',M1rork, PLLC
9�
D
ra -
202nd St SW 202nd St SW —
202nd PI SW 202nd PI SW `•"
Barva-Bless Adult
Family Home
v
rn
D
203rd St S
0
it Q
2041h PI SW Edgewood Church
.,
CD
206th St SW
-J
Q
e
w
+M
Li
Esther M. Hill, LMP
19
206th St SW
I,041h St SW 204th St SW 2041h St SW
t gCollege Place
Elementary Scho:_.I
w
a
D
FD
WORK AREA
0
Basketball Courts
'Athletic Field
College Place
Middle School
El.I
Baseball Field
ID
ID
VICINITY
Mill Creek Hall
Fr: r-I,-
9
Cit°r of Lynnwc
P.t.inicipal Gol
RECEIVED
Feb 13 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
O
ATCO COMMUNICATIONS SERVICES. LLC
www.atcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290 /
ziPy
I fiber
Everett, WA 98206
(.0 z
o u
Q
F
C c
p C,
Z a
O
p u
w
a
w E-
>
Q
0
,It
0
N
w LU
� p
z Q Z
U U O
O O U
CL CL o
_W
Cn
i
0
U
DATE:
2.2.2024
REVIEWED BY:
M. LUNA
WTCS# 013184
DESIGNED BY:
E. HERSMAN
ATCO CONTACT:
512-627-6114
eli.hersman@atcotelecom.com
SCALE:
SHEET:
NOT TO
SCALE
-
NO: 1 OF 7
LEGEND:
OSIGNALIZED
INTERSECTION
OCONE
(CANDLESTICK)
®
TYPE III BARRICADE
WORK TRUCK
WORK ZONE LIMITS
WARNING SIGN
ARRW BOARD
REQUIRED)
(WHERE
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
FLAGGER-SPOTTER
FLAGGER STATION
— - - —
JURISDICTION LINE
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
SIGN LEGEND:
ROAD ROAD ROAD
WORK CLOSED CLOSED
AHEAD AHEAD LOCAL
TRAFFIC
ONLY
W20-1 W20-7A W20-3 K-6664
CITY OF
LYNNWOOD
PRIVATE ROAD
Lo
FLAGGER TO ESCORT LOCAL
RESIDENTIAL TRAFFIC W20-7A
w I THROUGH WORK AREA
2I 2
v POLE 2
w GRASS
LUDW x
V)
POLE
GRASS
GRASS
Q I
204TH ST SW
(25 MPH)
W
z_
J
= I
CONTRACTOR TO C❑❑RDINATE
WITH COLLEGE
RECEIVED
PLACE ELEMENTARY SCHOOL,
MIDDLE SCHOOL, AND ARROW
COLLEGE PLACE
PREPARATORY
�I
ACADEMY 72 HOURS IN
ADVANCE
Feb 13 2024
Q
CITY M E T SERVICES
DEVELOPMENT SERVICES
C
G
COLLEGE PLACE
ELEMENTARY SCHOOL
DEPARTMENT
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH)
25
30
35
40
45
50
55
60
64
70
LENGTH (feet)
155
200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
NOTE:
MON. - FRI. = 7:00am TO 4:00pm
0
PRIVATE ROAD
PHASE 4
b
73RD AVE W
(25 MPH)
5J GRASS
W20-1 u
PIED E551
W20-3
2
W20-7A x�
/�� x
J�X I W20-7A %K-
POLE
GRASS
10
FLAGGER TO ESCORT LOCAL
RESIDENTIAL TRAFFIC
THROUGH WORK AREA
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER
TANGENT
50/70 40
80
35/45 30
60
25/30 20
40
MINIMUM SHOULDER TAPER LENGTH = L/3 (feet)
SHOULDER
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
8
40
40
60
90
120
130
150
160
170
190
10
40
60
90
90
150
170
190
220
220
240
USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8'
0 O 0
x
GRASS
WORK DETAILS:
TRANSFER ATTACHMENTS AND FIBER
DROPS TO NEW POLE, REMOVE
0 EXISTING COPPER DROPS AND OLD
POLE,
20 REMOVE CABLE,
SPOTTER NEEDED FOR PEDESTRIAN
TRAFFIC AND DRIVEWAY ACCESS,
TRAFFIC HALT NO MORE THEN 5 MIN, ACROSS
PRIVATE ROAD TO ALLOW AERIAL CR❑SSING
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
O
ATCO COMMUNICATIONS SERVICES, LLC
www.atcoteiecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
ziPylfiber
Everett, WA 98206
(M
o
O
rn
to
C
Q
=
a
Z U
cn
o
N
CD
M
Z
2
o6
>
>
o
n O
1� O
0
ILL
Q
w
Q
�
O
2
H
O
r`
O
C>
`
z
O
N
O
U
U
w
w
L�
L�
m
�
o
Q
z
U
Q
U
z
O
w
z
OO
o
UILL
O
ILL
DATE:
2.5.2024
REVIEWED BY:
M. LUNA
WTCS# 013184
DESIGNED BY:
E. HERSMAN
ATCO CONTACT:
512-627-6114
eli.hersman@atcotelecom.com
SCALE:
SHEET:
1"=70'
06
NO: 6 OF 7
RECEIVED
// Feb 13 2024
CITY OF EDMONDS CITY OF EDMONDS MyBuildingPermit.com
DEVELOPMENT SERVICES
DEPARTMENT
Right -of -Way Application #1440762 - 6004301
Applicant
First Name Last Name Company Name
Arianne Mommsen Ziply Fiber Northwest LLC
Number Street Apartment or Suite Number E-mail Address
426 E Casino Rd grpatcopermits@ziplyfiber.com
City State Zip Phone Number Extension
Everett WA 98208 (402) 670-8384
Contractor
Company Name
ZIPLY FIBER NORTHWEST LLC
Number Street Apartment or Suite Number
1220 75th St SW
City State Zip Phone Number Extension
Everett WA 98203 (425) 231-3928
State License Number License Expiration Date UBI # E-mail Address
ZIPLYFN782L3 5/25/2024 iyini i4gn caitlin.reid@ziply.com
Project Location
Number Street Floor Number Suite or Room Number
20406 76TH AVE W
City Zip Code County Parcel Number
EDMONDS 98026 00614300000100
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions)_
Work Location
Property Owner
First Name Last Name or Company Name
EDGEWOOD BAPTIST CHURCH-EDMONDS
Number Street Apartment or Suite Number
20406 76TH AVE W
City State Zip
EDMONDS WA 98026
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 2/9/2024 Submitted By: Arianne Mommsen
Page 1 of 2
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1440762 - 6004301
Project Contact
Company Name: Ziply Fiber Northwest LLC
Name: Dawn Frank Email: grpatcopermits@ziplyfiber.com
Address: 426 E Casino Rd Phone #: (402) 670-8384
Everett WA 98208
Project Type Activity Type Scope of Work
Utility Purveyor Utility Work Disturbance of Surface
Project Name: 6004301
Description of Work: Accessing poles along 76th Ave W and transfer existing utility attachments to new
poles, remove old poles.
Project Details
Project Information
Job Number
6004301
Page 2 of 2