Loading...
AttachmentsMEMORANDUM Date: November 6, 2014 To: City of Edmonds, Planning Division Copy: Matt Finch, Edmonds School District From: Robert Harding, DA Hogan & Associates Re: Former Woodway High School - Field Improvements Conditional Use Permit Application HOGAN RECEIVED NOV 17 2014 DEVELOPMEN SE:F,vICE The following statement addresses how the project meets each of the criteria listed in the Edmonds Community Development Code 20.05.010. The proposed project site is located at 23200 100th Ave W., and currently lies within the Park/Open Space and Single Family — Urban 1 Comprehensive Plan Designation. The Site is a former high school site with existing athletic fields. As part of this project, the use will remain the same. The existing softball field will be converted into a synthetic turf multipurpose field. The field is currently used on occasion by the general public but is underutilized due to its current condition. Following construction, the field will be maintained and scheduled by the City of Edmonds Park Department. The project is a partnership between the Edmonds School District, the City of Edmonds and Verdant Healthcare. The project will maintain this as a park site with multiple uses including but not limited to soccer, softball, running/walking, community gardens, as well as many other outdoor activities. Future phases of the project include additional fields, a public restroom and storage facility and field lighting. The entire project will not only help the overall economic health of the City of Edmonds, but also increase physical well being of its citizens by promoting outdoor activities and providing gathering space. With the proposed addition of athletic field lighting, the site will also become a safer place for families during evening hours. The proposed improvements will continue to satisfy the current zoning ordinance for this property. The majority of the site is designed as OS (Open Space) with a small portion of it in the RS-8 (Single Family, 8,000 sf lots). According to the ECDC, the proposed improvements are still considered a "Permitted Primary Use" as it is a local neighborhood/community park that will service the entire community. This Conditional Use Permit shall be personal to the present owner (the Edmonds School District) and non- transferable. Robert Harding DA Hogan & Associates, Inc. 206-285-0400 p 206-459-5473 c D.A. Hogan & Associates, Inc. (206) 285-0400 Tel 119 First Ave. S., Suite 110 (206) 285-0480 Fax Seattle, WA 98104 1*:1:11:311re1 FORMER WOODWAY HIGH SCHOOL MULTIPURPOSE FIELD RENOVATION RECEIVED Project Scope NOVEMBER 2014 NOV 17 2014 K61-DA HOGAN DEVELOPMENT SERVICE' The following is intended as a brief but reasonably complete description of the proposed work as it is understood at the time of this writing. There are many supporting documents in development at this time, which are expected to be available by the time this Narrative is distributed. These documents will provide exceptional detail to the summary below. An index of these documents, as well as a "snap shot" of selected project facts, is appended to the end of the Narrative. Phase 1 Description: • Construct a new synthetic turf field generally in the location of the natural turf existing multi- purpose field. The field will include little league baseball / softball and two multi -purpose rectangular fields that may include soccer and lacrosse to be located in the common outfield of the baseball / softball fields. Field improvements will include subsurface drainage, permeable aggregate, perimeter anchors/nailers and the synthetic turf potentially including an elastic layer pad with markings for soccer, lacrosse and other sports to be determined. We are approaching this as a permeable base, so that storm water detention can be incorporated within the aggregate section, helping to mitigate storm drainage issues anticipated to be required as part of the project permitting. Field surface is anticipated to be approximately 160,000 SF. • Ancillary perimeter/adjacent improvements including wash water irrigation system at field, field equipment such as goals, nets, bases, etc. • Rubberized walking pathway / warning track at the project perimeter that may also be used as a measured running surface for physical education purposes. Warning track is approximately 15,000 SF. • Miscellaneous adjacent pedestrian and vehicular access. • Field perimeter fencing. • Development of sports field lighting and other associated electrical improvements. Design of electrical improvements is intended to establish future pole locations, infrastructure improvements suitable for permitting, and installation of infrastructure including conduits and pole foundations will be included, however the actual lighting system will be deferred to a future phase. • Portable spectator seating • Depending upon funding, construction of Community Garden area consisting of wood chip pathways and either at grade or raised topsoil planting beds. The entire project site for Phase 1 totals approximately 6.84 acres Subsequent Phases of Site Improvements will be constructed at a future date depending upon funding availability and are anticipated to include the following: Phase 2 Description: Construct an identical multipurpose synthetic turf field on the northern portion of the site, generally in the location of the existing cinder running track and soccer/football field. The field will include little league baseball / softball and two multi -purpose rectangular fields that may include soccer and lacrosse to be located in the common outfield of the baseball / softball fields. Field improvements will include subsurface drainage, permeable aggregate, perimeter anchors/nailers and the synthetic turf potentially including an elastic layer pad with markings for soccer, lacrosse and other sports to be determined. We are approaching this as a permeable base, so that storm water detention can be incorporated within the aggregate section, helping to mitigate storm drainage issues anticipated to be required as part of the project permitting. Field surface is anticipated to be approximately 160,000 SF. ® Ancillary perimeter/adjacent improvements including wash water irrigation system at field, field equipment such as goals, nets, bases, etc. ® Rubberized walking pathway / warning track at the project perimeter that may also be used as a measured running surface for physical education purposes. Warning track is approximately 15,000 SF. ® Pedestrian and spectator improvements. The northern field is generally 6-8 ft. lower than the Phase 1 fields. The site plan will take advantage of the elevation change, allowing for spectator areas raise/elevated above the field for superior viewing. The pathway system will be modified to accommodate an ADA path of travel at the field perimeter, and connect the pedestrian pathway system to the southern field constructed in Phase 1. ® To minimize potential future disturbance, the conduit and foundation system for future lighting associated with Phase 2 field will be installed and connected to the infrastructure installed within the Phase 1 improvements. ® If not constructed as part of Phase 1 improvements, a Community Garden area consisting of wood chip pathways and either at grade or raised topsoil planting beds will be constructed at the northern perimeter of the field, providing a separation / buffer from residential properties to the north, and taking advantage of the best solar exposure on the site. Phase 3 Description: Phase 3 Improvements are anticipated to complete the athletic facility improvements and will include: ® A one story restroom and concession building. ® Pedestrian paving improvements to complete connections and accessibility to the restroom/concession building ® Sports field lighting including light poles, luminaires, and lighting controls for all fields. Lighting will consist of poles ranging from 60 ft. to 85 ft. height, with multiple metal halide or LED shielded floodlight fixtures mounted to the tops of the poles. The overall site area, including all phases of work is approximately 468,800 SF, or approximately 10.76 acres. Page 2 of 2 EXHIBIT B FORMER WOODWAY SCHOOL K�—�r]D /�SOFTBALL FIELD RENOVATION A H 0 G A N Vicinity Map & Legal Description NOVEMBER 2014 Legal Description: NOV 17 2014 SEC 36 TWP 27 RGE 03RT-50) SE1/4 NW1/4 PARCEL #: DEVELOPMEN r 5EI, � r 27033600202200 Former Woodway High School ! 23200 1001h Ave W' Edmonds WA, 98020 ♦-------- - - - - - ♦ } Construction f PARKING Access Route ' I I PARKING --------------- \ i ' 1 L 4 r i PROJECT