Loading...
Building PermitType: RESIDENTIAL BLDG Subtype: DECK I Status: ISSUED Parcel No: 00594400003702 Subdivision: 005944, 009142 Fire Sprinklers: Valuation: $10,051.00 Code Edition: 0 Scope of Work: COLE- PERGOLA Site Address: 17802 TALBOT RD EDMONDS,WA 98026-5326 Lot: 0 Lot Area: Zoning: Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Applied: 2/12/2024 Issued:3/14/2024 Final: Expiration Date: 3/14/2026 Issued by: BAC I WA State Contractor L & I #: STRUXOW812MB I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT KARMYN RILEY 9116 E SPRAGUE AVE. #547, (206)551-2499 KARMYN.R@STRUXUREPNW.COM SPOKANE WA 99206 CONTACT STRUCTURES NORTHWEST 9116 E SPRAGUE AVE. #547, (206)551-2499 karmyn.r@struxurepnw.com LLC SPOKANE WA 99206 CONTRACTOR STRUXURE OUTDOOR OF 9116 E SPRAGUE AVE., (206)551-2499 brandy.t@struxurepnw.com WASHINGTON SPOKANE WA 99206 17802 TALBOT ROAD, OWNER CHARLES & COLE ELIZAB COLE EDMONDS WA 98026 •' • DESCRIPTION 7BLDRESALUE ACCOUNT AMOUNT PAID PAID DATE RECEIPT # BASED FEE 001.000.345.83.000.00 $301.00 $301.00 3/14/24 R35633 BLD - RES VALUE BASED PLAN 001.000.345.83.000.00 $255.85 $255.85 2/12/24 R34819 REVIEW CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 2/12/24 R34819 PERMIT ENG - INSPECTIONS 001.000.345.83.400.00 $252.00 $252.00 3/14/24 R35633 STATE BUILDING CODE SURCHARGE 001.000.237.150 $6.50 $6.50 3/14/24 R35633 RES TOTALS: $860.35 $860.35 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Thursday, March 14, 2024 4:14:21 PM 1 of 3 'RESIDENTIAL BLDG PermitCity • • • • - EL 98020 1 1 www.edmondswa.gov• 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ESC REQUIREMENTS FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD INFORMATION REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. INSPECTIONS FOR SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INFORMATION www.mybuildingpermit.com LOT LINES STAKED O Lot line stakes must be in place at the time of foundation setback inspection. ORMATION Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspections to verify. These MAXIMUM HEIGHT FOR items must be consistent with the approved plan. If the proposed height of a building is INFORMATION within 12 inches of the maximum height permitted for the zone an elevation survey is required. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. Printed: Thursday, March 14, 2024 4:14:21 PM 2 of 3 r: RESIDENTIAL BLDG Permit PERMIT NUM i City of Edmonds lit.5th 121 Ave N, Edmonds WA 98020 BLD2024-03183 www.edmondswa.gov / 425.771.022 INSPECTIONS - Schedule Online at https://Inspection.mybuildingpermit.com INSPECTIONTYPE Ad B-1 SETBACKS B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" A-1 TESC AND MOBILIZE X-2 ENGINEERING FINAL Printed: Thursday, March 14, 2024 4:14:21 PM 3 of 3