Loading...
APPROVED BLD2023-1014+Transportation_Impact_Form+8.9.2023_3.44.23_PM+3717086RECEIVED APPENDIX A Aug 10 2023 BLD2023-1014 Page 1 of 2 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Transportation Impact Analysis Worksheet PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 Name of Proposed Project: StillHouse Coffee Owner/Applicant Applicant Contact Person: StillHouse Coffee Robert Miller Name Name 558 Main Street S suite 108 1501 Latitude Circle Street/Mailing Address Street/Mailing Address Edmonds, WA 98020 Anacortes WA 98221 City State Zip City State Zip Telephone: 425.822.0100 Telephone: 425.822.0100 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Contact Name Telephone: E-mail: 1. PROJECT DESCRIPTION a. Location - Street address: 558 Main Street S., suite 108 (Attach a vicinity map and site plan.) b. Specify existing land use: commercial specialty retail c. Specify proposed type and size of development: Coffee Shop - tenant improvement (# of residential units andlor square footage of building) d. Date construction will begin and be completed: Aug 25, 2023 - Nov. 15, 2023 e. Define proposed access locations: existing off plaza HANDOUT UPDATED 09.02.2021 APPENDIX A Page 2 of 2 f. Define proposed sight distance at site egress locations: parking directly In front Of plaza 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC 3.36.130. ❑ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 impact fee rate shall be used. Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use $ X Prior Use $ X New Use Fee: $ - Prior Use Fee: $ $ 1 ❑ NEW DEVELOPMENT Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use $ X — IX NO CHANGE ❑ INDEPENDENT FEE CALCULATION Fee FEE NOT REQUIRED UNDER THIS PERMIT. TI FEES WERE PAID UNDER BLD2019-0529/BLD2019-0530. MITIGATION FEE RECOMMENDATION: $ INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee) $ TOTAL TRANSPORTATION IMPACT FEE $ 8/23/2023 City of Edmot...a, „vision Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 09.02.2021