Loading...
BLD2024-0386_Supplementals_Plumbing_Fixture_Counts_3.18.2024_6.28.18_PM_4142704MyBuildingPermit.com Jurisdiction: Edmonds Project Name: JOHN LANGE FIRE REMODEL Application ID: 1460133 Supplemental Name: Plumbing Fixture Counts Enter the # of plumbing fixtures being - installed, altered, repaired, added or relocated Water Heater - Specify GAS or ELECTRIC - QTY # Plumbing fixture on 1 trap or set of fixtures on 1 trap - Include sinks, toilets, tubs, showers, etc. - QTY # 3 Drains w/in footprint of building - Rainwater systems, roof deck drains, etc. - QTY # Re -pipe -Drain, vent or water piping for each fixture served -QTY# 2 Water service line - Replacement or repair - QTY # Water service line - New - QTY # Water treating equipment (water softener) - QTY # Backflow protective device - 2" and smaller -QTY# Backflow protective device - Over 2" - QTY # Graywater or reclaimed water system - In addition to fixtures - QTY # Non -grease waste pre-treatment interceptor - Oil/water separator - QTY # Medical gas piping system - QTY # Grease trap - HGI inside building -QTY# Gravity grease interceptor - GGI - QTY # Gas piping outlets - QTY #