APPROVED RESPONSE FROM STRUCTURAL EOR BLD2021-1493COASTAL CIRCLE 2212 QUEEN ANNE AVE N #337 SEATTLE, WA 98109 DATE: 11/19/2021 TO: DONOVAN AKAU FROM: Applicant: BRANDON BOEHM Owner: M & SMITH H & MCK MCKINLEY RE: Plan Check: BLD2021-1493 Project Address: 9532 231ST PL SW Project: MCKINLEY/SMITH-INTERIOR REMODEL Project Information Applicant: Brandon Boehm Applicant Phone: (206) 890-0043 Applicant Email: coastalcircle.contactC&amail.com Structural Engineer: Nick Carter Structural Engineer Phone: (206) 264-7784 EXT 203 Owner: Haley & Max McKinley City of Edmonds Reviewer: Donovan Akau Reviewer Phone: (425) 771-0220 Please contact directly (call/email) for any additional clarification and/or questions. Donovan Akau, 1. It appears that the sunken living room is being altered to a leveled floor to the existing adjoining spaces. Please provide a detail as to the construction of what appears to be a newly proposed wood floor framing over the existing crawl space. Please see the correction response from the Structural Engineer. 2. It is apparent that the new relocated door located at the garage/dwelling swings over the elevation change. Please make corrections of the door swing or provide a landing that meets section R311 of the 2018 International Residential Code (IRC). RESUB Dec 07 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Door swing direction has been revised to meet section R311 of the 2018 IRC. Please see sheets A2.0-2.1. 3. The hangers found on the structural plan sheets S2.1 and S3.0, appears to conflict with each other. Sheet S2.1 indicates a HHUS hanger and sheet S3.0 indicates a LUS Series hanger. Please clarify and or correct, the type of hangers that will be used on sheets S2.1 and S3.0. Please see the correction response from the Structural Engineer. 4. The details found on the structural plan sheet S3.0 does not clearly demonstrate the positive connections for post to existing footing, post to beam, and new footing to existing footing. Please clearly demonstrate theses connections on sheet S3.0 Please see the correction response from the Structural Engineer. 5. It appears that there is no clear load path found on the plans that are proposed for this project. Please clearly demonstrate on the plans, how the load path from the footing to the beams found in the level 2 framing are to be constructed. Please see the correction response from the Structural Engineer. Sheets with Revisions: • A2.0 • A2.1 • S2.0 • S2.1 • S3.0 BYKONEN CARTER QUINN A STRUCTURAL ENGINEERING MEMORANDUM Date: December 3, 2021 To: Peak General Contracting 2212 Queen Anne Ave N #337 From: Nicholas Carter/Steven Nickolas Project: McKinley Residence Project #: BO Seattle, WA 98109 copyto: file Attn: Brandon Boehm Re: Permit Corrections Cycle #1 Below are the structural responses to the Plan Review Comments (#1, #3-5), for the plan check #BLD2021-1493 dated November 19, 2021. 1. Refer to new detail 3/S3.0 for overfram ing detail. 3. The two hangers noted are for different attachments. The HHUS7.25/10 hanger is used to attach the LVL beam running east/west to the LVL beam running north/south. The LUS hangers are used to attach the existing 2x10 joists to the new LVL beams. 4. LVL beams are connected to stud stacks that will fit inside the existing interior/exterior walls per detail 8/S3.0. Refer to updated detail 3/S3.0 showing the connection between the existing wall and new footing. Dowels between the existing and new footings have been added to the plans on sheet S2.0. 5. Prior to this remodel, the existing joists at Level 2 were supported on bearing walls. These walls have been removed and replaced with LVL beams shown on sheet S2.1. These beams are supported by new stud stacks in the existing walls or by a hanger attached to a new LVL beam. The beam to stud stack connection is per detail 8/S3.0. Detail 11/S3.0 has been added to the plans and shows the condition where the LVL beam running east/west is supported by the LVL beam running north/south. The stud stacks supporting the LVL beams are located within the existing walls, which are supported by the exterior existing footings or the interior existing crawl space walls. The existing footings below the crawl space walls will be removed and replaced with larger sized footings in order to support the point loads from the stud stacks. The connection between the interior existing crawl space walls and the new footings is per detail 3/S3.0. ► 2033 Sixth Avenue #995 Seattle, WA 98121 206-264-7784 www.BCQ-SE.com If there are any additional questions, please do not hesitate to contact us. Nicholas Carter nvc@bcq-se.com