Loading...
APPROVED PLN BLD FIR BLD2023-1471+Building_Elevations+11.16.2023_9.57.31_AM+3904391APPROVED BY PLANNING Dec 05 2023 a r o tj ojroi,c P 7 ro rC Lhe — �.�, k� 4 s Calcana overhead brackets set to 8" air gap clearance to combustables to be used PH75HO weights 120 pounds _ To be fastened to roof framing with supplied hardware - Pe fa c, o c�o Lks g 1 14- i __ 1 _ I I :1 �� Ca O �LL 11-17-2023 Inspector; verify installation per reviewed manufacture PLAN REVIEW specs. APPROVED CONDITIONS: 1. ENSURE ALL MANUFACTURZIER� INSTALLATION INSTRUCTIONS ARE ALL WORK SUBJECT APPROVED Approved FOLLOWED. TO FIELD DFM Chris Burt INSPECTION FOR PLANS MUST BE South County Fire INSPECTOR NOTE: ENSURE HEATERS CODE COMPLIANCE Date: 11/17/2023 ARE INSTALLED WITH REQUIRED ON JOB SITE CLEARANCE FROM COMBUSTIBLE AS , NOTED ON SPEC SHEET. 1� DFM BURT A ��� � i I � � City Of Edmonds —��— Building Department Work MECHANICAL -OUTDOOR HE: Address 610 5TH AVE S Owner IL VIALE Approved Date 11/27/2023 Building Official E�'� C�� Permit Number - -- �LD2023-1471 RECEIVED Nov 16 2023 CITY OFEDMONDS MENT DEVELOPARTMENRVICES