Loading...
REV3 REVIEWED BLD2023-0027+75_PERCENT_CALC_WORKSHEET+8.8.2023_5.51.37_PM+3714665Permit A BLD2023-0027 r Address: 633 Alder Street, Edmonds, WA 98020 .............. REViEWEo Lawson Andrew Hill, Elise Hill BY Home Owner: CITY OF EDMONDS BUILDING DEPARTMENT; Edmonds Remodel .....•...•.....•...•.....•...•.....•...•...•.•. Contractor: ibis form may be used to help establish the percentage of demolition work performed to an existing home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing home's replacement cost (5O% in a flood zone), the structure will be required to be rebuilt to the standards of new construction. See ECDC 19.00,045 Replacement cost of existing home $ $511,900 House ; 1297 ft2 @ 5325 M2 - approx. adjustment for window cost = 5409,525 How was the value determined? Garage =585ft2 Cw) 175Pt2= 102 375 - 511,9DD Value of Existing Replacement cast of Component Component Percentage Removed removed component Notes Foundation 5 75,000.00 23.2% $ 17,375.00 Floor Framing S 40,D00.00 22.5% $ 9,000.00 Floor insulation 5 3,000.00 100.0% $ 3,OOD.D0 Wall Framing $ 80,000.00 31.3% $ 25,000.DD Wall Insulation $ 9.000,00 55.6% $ 5,000.00 Siding $ 15,000.00 100.0% $ 15.000.00 Roof Framing $ 28,850.00 43.3% $ 125D0.00 Ring 5 25,000.00 40.0% S 10,000.00 Attic Insulation S 3.500.00 100.0% $ 3,500.00 Windows $ 13,000.00 100.0% $ 13,01[10.00 Doors $ 10,000.00 80.0% 5 8,000.00 Plumbing $ 30,000.00 50.0% $ 15.000.00 Electrical 5 25,000.00 60.0% $ 15.000.00 HVAC $ 30,000,00 100.0% $ 30,000.00 Dry wall $ 30,UO0-DO 66.7% $ 20,DDO.00 Cahinets $ 45,000-00 22.2% $ 10,000.00 Painting, Flooring and Finishes $ 49,550.00 50.5% $ 25,000,00 Other $ 0.0% $ Percentage Removed (Total of Column 4 divided by Column 2) equals 46.2 Owner 4k, W-� Aug 8, 2023 Date Contractor Date