Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
SEE REV3 APPROVED BLD RESUB3 BLD2023-0027 75% Demo Form Signed
BLD2023-0027 Permit # FLU 162-� -qpg� v ................................................ REVIEWED BY CITY OF EDMONDS ��� BUILDING DEPARTMENT' Address: RESUB Home Owner:p 1y , I I JZ S� I�G1fn May 26 2023 CITY OF EDMONDS %_ 1 1 - ,I DEVELOPMENT SERVICES Contractor: COY i ©(y,�l DEPARTMENT This form may be used to help establish the percentage of demolition work performed to an existing home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing home's replacement cost (50% in a flood zone), the structure will be required to be rebuilt to the standards of new construction. See ECDC 19.00.045 Replacement cost of existing home $ S7--3 96b How was the value determined? X Component Value of Percentage Rep acement otes J Existing removed cost of removed Component component Foundation 2 Floor Framing 410.Mb I ' Floor insulation 000 06 ° Wall Framing pop Ozo Wall Insulation op0 siding 06 Roof Framing An Roofing b Attic Insulation ° OD Windows O ° Doors 1 Plumbing D00 b Electrical /o 6 b HVAC Drywall Cabinets ° Painting, Flooringf and Finishes % fib Other 5z3-'.900 4 236�SO Total Percentage Removed (Total of Column a divided by Column 2) equals f!� % Date S In 20 i 3 Owner � z2-- ° -ram Date Contractor ��3