Loading...
APPROVED PLN BLD BLD2023-1647+Site_Plan+12.27.2023_1.39.06_PM+3972338APPROVED BY PLANNING APPROVED PLANS MUST BE CA19-�C� ON JOB SITE Feb 21 2024 NORTH ALL WORK SUBJECT Robert Franklin Residence — 515 Pine St Edmonds WA 98020 TO FIELD INSPECTION FOR Contractor: Greenwood Heating & Home Services CODE COMPLIANCE Blue Box: Install 24KW Generac Generator Blue Lines: Undercover Patio Orange Line (Short): Window Orange Line (long, by Patio): sliding door ftl:4 0R 4.1 amooks— -- RECEIVED Dec 27 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT The Following Documents and Plans to be on Site OBTAIN ELECTRICAL at Time of Inspection: PERMIT FROM STATE LABOR & 1. Manufacturer Installation Requirements 2. Site Plan Showing the Height and Setback of the Mechanical INDUSTRIES Unit 3. L & I Electrical Permit and Inspection to be Completed at time of Clty Inspection City Of Edmonds Building Department Work GENERATOR Address 515 PINE ST Owner FRANKLIN ----- -------------- Approved Date 1/02/2024 --- Building Official 7).W., t W. -M OfA. Permit Number BLD2023-1647 Generator Location to be installed and . i secure pad to ground. t, r'�+ � • Drill 3/8" hole in pad on two opposite corners r- r • Insert 16"-18" 3/8" all thread into hole with nut and washer on top of all thread. 13FT to property line 1 • Pound all thread down into 16FTto street ground until nut and washer t �r , are firm onto pad. pnRL Zone Comer Flag _ ANNII SMN0P_V4yc4gd Actual Front Sides Rear Other Height Gas Meter �k