APPROVED ENG BLD2023-0686+Transportation_Impact_Form+6.7.2023_10.35.21_AM+3593676APPENDIX A
Page 1 of 2
Transportation Impact Analysis Rlun
ECEIVED
Wo r ks h eet oEPaRE.
PERMITTING & DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771.0220
www.edmondswa.gov
Name of Proposed Project:
Owner/Applicant
17921 Bothell -Everett Hwy Suite 100
Name
17921 Bothell -Everett Hwy Suite 100
Street/Mailing Address
City
Applicant Contact Person:
Rhonda Clancy
Name
Street/Mailing Address
State Zip City
Telephone: (425) 438-8444 Telephone: (425) 939-1164
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
RAM Engineering, Inc. Rob Long, PE
Firm Name Contact Name
Telephone: (425) 678-6960
1. PROJECT DESCRIPTION
State Zip
E-mail: RobL@RAMengineeringlnc.com
a. Location - Street address: 23907 91 st PI W Edmonds Wa 98026
(Attach a vicinity map and site plan.)
b. Specify existing land use: Single Family Residential
c. Specify proposed type and size of development: Single Family Residential, One Lot/SFR
(# of residential units and/or square footage of building)
d. Date construction will begin and be completed: Start July 2023 / End May 2024
e. Define proposed access locations:
APPENDIX A
Page 2 of 2
2
f. Define proposed sight distance at site egress locations:
Access driveway from new plat road 91st PI W (low volume residential road),
adequate access sight distance.
MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC
18.82.130.
❑ CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used.
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
New Use $ X
Prior Use $ X
Fee
i
New Use Fee: $ 1 - I Prior Use Fee: $ 1 =
$
® NEW DEVELOPMENT
ITE Land Use Category
New Use I SFR, ITE 210
❑ OTHER
Lots 1, 2 and 7 will take credit for the three existing
houses removed by the site development.
Per Unit
Fee Rate
$ 6,249.14 1 X
Units in
square feet,
# of dwelling,
vfb. etc.
1
MITIGATION FEE RECOMMENDATION:
INDEPENDENT FEE CALCULATION: $240.00 + consultant fee
$
TOTAL TRANSPORTATION IMPACT FEE
$
ENGINEERING DIVISION
• DTED
City of Edmonds, Engineering Division Approv, Date
16/29/2022
' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.