Loading...
2022-05-16 - Sunset Ave N Residence - RC415421 7dayOTTO ROSENAU & ASSOCIATES, INC. Geotechnical Engineering, Construction Inspection & Materials Testing CONCRETE REPORT Job Number: 22-0366 Report Number: RC415421 Permit Number: BLD2021-1482 Project: Sunset Ave N Residence Client: American West Coast Construction Address: 322 Sunset Ave N, Edmonds Date: 05/16/2022 Inspector(s): Jonathan Andrews Description/Location: Footing for residence per S3.0 details: S2.2 and S2.3 Note: spread footings not placed today. Ufer ground installed prior to placement. Work inspected to approved plans and project documents. Rebar Verified: Yes 5/16/2022 Jonathan Andrews (Grade 60) Mfg: Cascade Placement Data Design ❑d Actual ❑ Batch Weights/Cubic Yard Supplier: Smokey Point Cement (Ibs/type): 564# Type: 1/11 Mix Number: PG60A40 Fine Agg. (Ibs): 1848# Slump Spec: PG60A40 Coarse Agg. (Ibs/size): Slag (Ibs): W/C Ratio Spec: 4"+-1" Coarse Agg. (Ibs/size): Air Spec: 0.50 Coarse Agg. (Ibs/size): Total Yards: 5%+-1.5% Fly Ash (Ibs): Placed Via: Line Pump Water (Ibs or gal): 284# Consolidated: Yes Admixtures (specify): 5.40 oz. AEA Required Strength: 2500 psi @ 28 days Sampling and Testing Data Time Cubic Water Slump Air % Conc.Temp Ambient Truck Ticket ASTM C 172, C 31 Made Yards Added C 143 C 231 C 1064 Temp No. No. Cast Samples: 1-4 10:45 am 40.00 7 gal. 4.0" 5.5% 65°F 51 °F 3368 272748 Weather: Overcast Slump Range: 4.0" Air % Range: 5.5% Date Samples Picked Up: 5/17/2022 Initial Curing Method: ASTM c31, Exclude c31-12.1.5 Initial Curing Tmp: ASTM c31, Exclude c31-10.1.2 Comments Placed per ACI criteria. REINFORCING/PLACEMENT: Conforms: W Does Not Conform: ❑ COMPRESSIVE TEST RESULTS Fracture Type Specimen Test Field Age Size Daily Average Weight Max Load Strength (other Number Date Cure (Days) (in.) Area (Sq.ln.) Diam. (In.) (Lbs.) (Lbs.) (psi) than cone) 1 05/23/2022 7 4 x 8 12.57 4.00 8.2 41,610 3310 5 = Discarded Tested in general accordance to: ASTMC39 ❑d ASTMC617 ❑ ASTMC1231 ❑ Copies to: Date: 2022.05.26 Client ❑� Engineer ❑ Others (� c ❑ Owner ❑ Contractor Technical Responsibility: 05:56:46 -07�00� ❑ Architect W Building Dept Isaac Ruoff, Project Manager This report applies only to the items tested or reported and is the exclusive property of Otto Rosenau & Associates, Inc. Reproduction of this report except in full, without written permission from our firm is strictly prohibited. 6747 M.L. King Way S., Seattle, Washington 98118 - Phone (206) 725-4600 - Fax (206) 723-2221 Form No.: ADMIN-62-04 (Rev 09/06) Page 1 of 1