Loading...
APPROVED BLD2021-1482+SI FORMS+1.13.2022_9.47.27_AM+2618956SPECIAL INSPECTION AND TESTING AGREEMENT Permit #: BLD2021-1482 Project: CB Hotel I LLC, 332 Sunset Avenue North Prior to issuance of a permit, this form must be completed in its entirety and returned to the City for approval. The completed form must have signatures of acknowledgment by all parties. DUTIES AND RESPONSIBILITIES Special Inspection Firm and Special Inspectors: The Special Inspection firm of AAR Testing and Inspection, Inc. will perform special inspection for the following types of work (separate forms must be submitted if more than one firm is to be employed): ■ Monitor and test structural fill placement and soil compaction ■ Observe bearing capacity at foundation locations ■ Observe slab -on -grade preparation ■ Monitor foundation drainage placement ■ Observe excavation stability NOTE: AAR Testing and Inspection, Inc. will be contracted to perform special inspections of the CONCRETE related work. Another special inspections company will be contracted to perform special inspections of the STEEL related work. \\edmsvr-userfs\userprof`6\dakau\Desktop\Comments Letters and Special Inspection forms 2019\Special Inspection forms\SI 2021-1487 CB ENV47983601-6 6JC'lb�8-edi�7/E�DB 01/13/2022 09:25 AMPST 3 t)ecial Inspections, Testing & Structural Observation Schedule IMPECUM ITEMS I CCINI"Q'#JO+tIS I PERIL IC I TF5nM Concrete Construction (IBC 1705.3) Concrete strength Reirrforcing placement Anchor bolts & holdowns Embedded items x Preparation of test specimens Concrete placement x X x x Steel Constructlon U C 1705.2 & AISC 3fi0 Fabrication x Erection x Nigh -Strength Bolts (IBC 1704.3.3) x Weldin MC 1705.2 AISC 360 & AWS D1,1 Single -pass fillet ,~ 5f16" x Welded headed studs Stair & railing x Light gage metal Embedded plate Anchoring Systems (MC 1705.3) Powder -actuated fasteners x Wood Construction (MC 1705.51 Sill plate anchor bolts x Floor diaphragm nailing x Shearwall nailing x Drag strut installation Holdown installation x Concrete construction x Woad construction x U SPEC?IM SCHEDULE N)M: '1. Items marked with an "x" shall be inspected In acoordarrce wlth IBC 1704 by a certlFled special Inspector from an agency approved by the jurisdiction, '2. Special inspection shall not be required for work clone In an approved farricator's shop per 1 1704.2.5. verify approval with jurisdiction prior to fabrication. �3. Continuous special inspection requires the inspector shall be on site at all limes that work requiring special inspection is performed, periodic special inspection} shall allow inspection at the intervals necessary to confirm that work requiring special inspection is in compliance with the requirements, '. All welds shall be visually inspected. All complete penen don welds shall be tested ultrasonically, 16, Periodic special inspection shall be allowed. '7. All complete penellahon welds shall be tested Atrasonlrally, \\edmsvr-userfs\userprof5\dakau\Desktop\Comments Letters and Special Inspection forms 2019\Special Inspection forms\SI 2021-1487 CB ENV479836013MIM8-cJZiEbB 01 /13/2022 09:25 AM PST All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector and the firm are qualified by education and experience to perform the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection unless they have been approved by the City. Inspection records shall include: A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. Contractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at the jobsite for the use of the special inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. Building Department: The building department shall review any revisions and addenda. The City inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Design Professionals: The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to ensure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. \\edmsvr-userfs\userprof5\dakau\Desktop\Comments Letters and Special Inspection forms 2019\Special Inspection forms\SI 2021-1487 CB ENV479836013MIM8-cJZiEbB 01 /13/2022 09:25 AM PST ACKNOWLEDGMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner: Chris Burdett Signature 64cccc 'zWe t Date 01 /07/2022 Ron Colwill 01/13/2022 Contractor: Signature Date: Arch./Eng: Ron Skinner Special Insp. TJ Gounden Special Insp. Agency Signaturqq0,zQ,Qag,�,,, 6De Date: 01/07/2022 Signature T��d n Date: AAR Testing and Inspection, Inc. ACCEPTED FOR THE CITY OF EDMONDS BUILDING DIVISION Date: 01 /07/2022 \\edmsvr-userfs\userprof5\dakau\Desktop\Comments Letters and Special Inspection forms 2019\Special Inspection forms\SI 2021-1487 CB ENV47983601-YYVM8-cJZiEbB 01 /13/2022 09:25 AM PST Envelope Data Subject: Burdett Sunset House - Edmonds, WA Special Inspection Documents: BLD2021-1482_SPECIAL_INSPECTION_AGREEMENT - AAR Testing.pdf Document Hash: 62815045 Envelope ID: ENV47983601-9702-CCEC-0493-EEDB Sender: Blake Fisher Sent: 01/07/2022 12:21 PM PST Status: Completed Status Date: 01/13/2022 09:25 AM PST Recipient(s) / Roles Name / Role Blake Fisher Ron Skinner TJ Gounden Ron Colwill Chris Burdett Address blake@blakefisherarchitecture.com r.skinner@ssseng.com dispatch@aartesting.com ronwcotwitt@gmaii.com CHRIS.BURDETT@cbre.com Document Events Name / Roles Email I Blake Fisher blake@blakefisherarchitecture.com Ron Skinner r.skinnerCssseng.com TJ Gounden Chris Burdett Ron Colwill dispatch@aartesting.com CHRIS. BURDETT@cbre.com ronwcotwitt@gmail.com Ron Colwill ronwcolwillCgmail.com Type Sender Signer Signer Signer Signer IP Address I Date Event 67.160.0.233 01/07/2022 12 (Created :21 PM PST 50.34.85.234 01/07/2022 12 Signed :43 PM PST 23.25.130.194 01 /07/2022 13 Signed 34 PM PST 50.46.195.153 01 /07/2022 14 Signed :41 PM PST 67.160.0.233 01/13/2022 09 Resent :08 AM PST 73.239.218.98 01/13/2022 09 Signed J :25 AM PST 01/13/2022 09 Status - Completed :25 AM PST Signer Signatures Signer Name / Roles Signature Ron Skinner,�j TJ Gounden ei�t� Foorcear Chris Burdett doh 21/ cofcs�P2 FSOTII WeiM, II