Loading...
Water_Availability_Certificate 21600 HWY 99of EDAg0NO� SECTION A WATER AVAILABILITY APPLICATION Complete and submit this form through www.MyBuildingPermit.com. Submit as a new application using the following prompts: Application Type — Utilities, Activity Type — Utility Availability, Scope of Work — Water Main. Applicant Contact/Applicant Name Robert Fix Phone Number 206-762-3311 Email permits@mckinstry.com Address 5005 3rd Ave S city Seattle state WA zip 98134 Property Project Name Kruger Building Renovation Address21600 Highway 99 cin'Edmonds state WA zip 98026 Parcel No. 00580700002900 Does the property currently have water service? ❑ Yes (City of Edmonds water) ❑ No Describe project (number of buildings, number of units, number of stories per building): Two story Tire sarinkler TI. In what phase is the project? ❑ Design Review ❑ Preliminary Plat ❑ Building Permit ❑ Rezone or Other Associated permit application number(s), if applicable: SECTION B Exemptions from Utility Availabilit units or less with combo water/fire check one of the following: residence; 2) Multi -family project of four 7ision (four single-family lots or less). Please ❑ A utility availability study IS NOT requested/required. The applicant certifies that this project is exempt from needing a study as described above and is not requesting a full utility availability study at this time. Please sign below and submit this form through www.MyBuildingPermit.com. ❑ A utility availability study IS requested/required for the project, and associated fees will be due. Please submit the complete application through www.MyBuildingPermit.com. APPLICANT SIGNATURE: DATE: 3/14/2024 APPLICANT PRINTED NAME: Baley Norton Form Updated 3/28/2023 SECTION C i. Z a. Water will be provided by service only to an existing 6" °' (size) water main that is (feet) from the site. OR ❑ b. Water service will require an improvement to the water system of: ❑ (1). feet of water main to reach the site; and/or ❑ (2). The construction of a distribution system on the site; and/or ❑ (3). Other (describe) 2. 0 a. The water system is in conformance with a City approved water comprehensive plan. OR ❑ b. The water system improvement will require a water comprehensive plan amendment. (This will cause a delay in permit issuance and approval.) 3. 0 a. The proposed project is within the corporate limits of the City, or has been granted Boundary Review board approval for extension of service outside the City, or is within the City approved service area of a private water purveyor. OR ❑ b. Annexation or Boundary Review Board approval will be necessary to provide service. 4. 0 a. Water is/or will be available at the rate of flow and duration indicated below at no less than 20 psi - Measured at the nearest fire hydrant 43 feet from the building/property (or as marked on attached map) Rate of Flow Duration ❑ Less than 500 gpm. (approximately gpm) ❑ Less than one (1) hour ❑ 500 to 999 gPm ❑ 1500 gpm or more ❑ One (1) to two (2) hours ❑ Two (2) hours or more ❑ Flow test of gpm ❑ Other Z Calculation of 1421.37 gpm (Commercial building permits require flow test or calculation) OR ❑ b. Water system is not capable of providing fire flow. Water Agency Certification Comments/Conditions: Static Pressure: 102.69 psi Residual Pressure at Available Flow: 97.73 psi Maximum Flow: 1421.37 gpm I hereby certify that the above information is true. This certification shall be valid for one year from the date of signature. City of Edmonds Jenelle Ho (Agency Name) (Signatory Printed Name) Associate Engineer Dlgllally sI,n,l 1, Jenelle Ho he Jenelle Ho Cityof Ed o257CU=Eng1-eering5CN9JeneClle Ho (Title) (Signature/Date) Form Updated 3/28/2023