Building PermitType: MECHANICAL Subtype: COMMERCIAL MECHANICAL I Status: ISSUED
Parcel No: 27042900302700 Site Address: 22315 HIGHWAY 99 UNIT D EDMONDS,WA 98026 Applied: 2/12/2024
Subdivision: Lot: 0 Issued: 4/3/2024
Fire Sprinklers: Lot Area: Zoning: Final:
Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 4/3/2026
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: BAC
Scope of Work: KIDSTRONG- MECHANICAL -INSIDE ONLY, RTUs BY OTHER CONTRACTOR
I WA State Contractor L & I #: PROJESC831MJ I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
GREG GLIEGE
16410 84TH ST, N.E. D-188, LAKE
(425)754-3141
PROJECTSERVCORP@AOL.COM
STEVENS WA 98258
CONTACT
PROJECT SERVICES
CORP
16410 84TH ST, N.E. D-188, LAKE
(425)754-3141
Projectservcorp@aol.com
STEVENS WA 98258
CONTRACTOR
PROJECT SERVICES CORP
16410 84TH ST NE #D-188, LAKE
(425)754-3141
projectservcorp@aol.com
STEVENS WA 98258
10120 NE 59TH ST, KIRKLAND
OWNER
PACIFIC PLAZA LLC
WA 98033
10 •' •
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
2/16/24
R34980
PERMIT
COMMERCIAL MECH PLAN REVIEW
001.000.345.83.000.00
$189.00
$189.00
4/3/24
R36045
- 3.1.23
FAN CONNECTED TO A SINGLE
001.000.345.83.000.00
$34.00
$34.00
4/3/24
R36045
DUCT
MECH ITEMS WHICH NO FEE IS
001.000.345.83.000.00
$34.00
$34.00
4/3/24
R36045
INDICATED
MECHANICAL BASE PERMIT FEE
001.000.322.10.000.00
j $57.00
j $57.00
j 2/16/24
j
R34980
TOTALS: $359.00
$359.00
• R •
CONDITION TYPE
STATUS
71
NOTES
Printed: Wednesday, April 03, 2024 12:30:40 PM 1 of 2
MECHANICAL
City of • • • PERMIT NU
�w.Edmonds'
•
: 1 1 iD2024-031
1 1
www.edmondswa.govi6
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
INSPECTIONTYPE INSPECTOR
COMPLETED
RESULT
NOTES
B-3 MECH ROUGH IN
X-0 MECH FINAL"
B-5 INSULATION ENERGY
Please request this inspection for duct insulation
Printed: Wednesday, April 03, 2024 12:30:40 PM 2 of 2