Building PermitType: MECHANICAL Subtype: RESIDENTIAL MECHANICAL I Status: ISSUED
Parcel No: 00649900003200 Site Address: 21102 SHELL VALLEY RD EDMONDS,WA 98026-
6949
Applied: 4/5/2024
Subdivision: 003736, 006499 Lot: 0 Issued: 4/5/2024
Fire Sprinklers: Lot Area: Zoning: Final:
Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 4/5/2026
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: 10K
Scope of Work: MECHANICAL - REPLACE GAS FURNACE AND ADD AC- 36"
WA State Contractor L & I #: WASHIES85NS
CONTACTS
NAME TYPE NAME
ADDRESS
PHONE
EMAIL
3909 196TH ST SW, LYNNWOOD
PERMITS@WASHINGTONENERGY.CO
APPLICANT
KAREN MATHENEY
(206)378-6648
WA 98036
M
WASHINGTON ENERGY
3909 196TH ST SW, LYNNWOOD
CONTACT
(206)378-6648
permits@washingtonenergy.com
SERVICES COMPANY,
LLC
WA 98036
WASHINGTON ENERGY
3909 196TH ST SW, LYNNWOOD
PERMITS@WASHINGTONENERGY.CO
CONTRACTOR
(206)378-6708
SERVICES
WA 98036
M
21102 SHELL VALLEY RD,
OWNER
COLLEEN TOMA
EDMONDS WA 98026
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE RECEIPT#
AC OR HEAT PUMP - 1.75 BTU OR
001.000.345.83.000.00
$57.00
$57.00
4/5/24
R36163
LESS
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
4/5/24
R36163
PERMIT
FURNACE OR FIREPLACE
001.000.345.83.000.00
$34.00
$34.00
4/5/24
R36163
MECHANICAL BASE PERMIT FEE
001.000.322.10.000.00
$57.00
$57.00
4/5/24
R36163
TOTALS: $193.00
$193.00
• •
CONDITION TYPE
STATUS
NOTES
Printed: Friday, April 05, 2024 4:13:16 PM 1 of 2
MECHANICAL
City of • • • PERMIT NUM -
�...-,7
121 5th Ave N, Edmonds' : 1 1 i455
www.edmondswa.gov1 1
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
Installation, use and maintenance of equipment and components shall be per
EQUIPMENT USAGE
FOR
manufacturer's specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufacture's installation instructions on site for Building Inspector.
FOR
Heat pumps, AC units and similar equipment greater than 36 inches in height are not
SIDE YARD EQUIPMENT
INFORMATION
allowed within required building setbacks.
INSPECTIONS
- Schedule Online
at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR
COMPLETED
RESULT
NOTES
B-3 GAS PIPING TEST
B-3 MECH ROUGH IN
X-0 MECH FINAL"
Printed: Friday, April 05, 2024 4:13:16 PM 2 of 2