APPROVED ENG2024-0075 ROW PERMITRIGHT OF WAY EUC PERMIT
PERMIT NUMBER
City of Edmonds
- N, Edmonds WA 98020 ENG2024-0075
www -. •. i
Description: PUD - REPLACE BO POLE FOR EXPIRED PERMIT ENG2022-0096
ISSUED: 04/08/2024
Address: 1450 OLYMPIC VIEW DR EDMONDS WA 98020-2690
EXPIRES: 10/08/2024
Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00531904600100
NAME TYPE NAME ADDRESS PHONE
APPLICANT MOE MATTHEWS PO BOX 1107, EVERETT WA 98206 (425)783-5681
CONTACT PUD PO BOX 1107, EVERETT WA 98206 (425)239-8210
CONTRACTOR SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-4353
OWNER ORTEGA GREGG L & FRASIER J ALIX 12421 123RD AVE NE, LAKE STEVENS WA 98258
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE - PER PERMIT
$45.00 $45.00
ENG - INSPECTIONS
$252.00 $252.00
RIGHT-OF-WAY PERMIT - STANDARD $378.00 $378.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: MAJ DATE: 04/08/2024
Printed: Monday, April 08, 2024 12:55:29 PM 1 of 2
RIGHT OF WAY EUC PERMIT
PERMIT NU E
City of Edmonds
www.edmondswa.gov • •
CONDITIONS
CONDITION TYPE
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND AND NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
COMPLETE
A-1 JOB START
E-7 TRAFFIC CTRL
X-2 ENGINEERING FINAL**
Printed: Monday, April 08, 2024 12:55:29 PM 2 of 2
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
Requirements outlined in Right-of-Wgy permit Handout E63.
RECEIVED
IAFMNKIM11
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
If any field is not applicable to your project, write "N/A" instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General •
Project Name REPLACE 2 BAD ORDER POLES
Site Address or if no site address use Property Address at NW corner of project area: 1450 OLYMPIC VIEW DR. EDMONDS WA 98026
Associated Permits: BLD PLN ENG
Owner and Entity Holdingapplicable)
Name of Company SNOHOMISH COUNTY PUD Franchise Ordinance No: N/A
Point of Contact ANDREW RIFE
Title ENG TECH III
Address 1802 75TH ST SW
City EVERETT
State WA
Zip 98203
Phone 425-783-8559
Email ASRIFE@SNOPUD.COM
Contractor and AuthorizedAgent of •wner (see note below)•
Name of Company SNOHOMISH COUNTY PUD
• • During Construction
Primary Name ANDREW RIFE
Agent Name ANDREW RIFE
Title ENG TECH III
Title ENG TECH III
Mobile 425-783-8559
Address 1802 75TH ST SW (PO BOX 1107, Everett, WA 98206)
Email ASRIFE@SNOPUD.COM
City EVERETT
State WA
Zip 98203
Secondary Name
Phone 425-783-8559
Title
Email PERMITS@SNOPUD.COM
Mobile
City of Edmonds Business License No:
Email
State License No: 313-005-741
Cf Contractor verifies it is currently bonded
Contractor verifies it currently has general liability insurance
NOTE: ECDC18.6o.o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as well)
'Traffic Control Only (no associated development)
XUtility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 Of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
1. PUD CREWS WILL BE REPLACING 2 BAD ORDER POLES IN EDMONDS FOR SYSTEM MAINTENANCE.
2. NO TREE WORK REQUIRED.
3. NO IMPACT TO PEDESTRIAN TRAFFIC
4. NO ASPHALT OR CONCRETE CUTS
5. WORK TO DONE ON SOFT SURFACE AREAS.
PLEASE REFERENCE EX I'ENU2022-096
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
x
LF
SF
Alley 72 hours +
LF
x
LF
SF
0
Parking 72 hours +
LF
x
LF
SF
0
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
❑ telecommunications ❑ cable Xpower ❑ gas
❑ water ❑ sewer ❑ storm
Details of Work to be Completed
1. Does the utility owner have existing overhead infrastructure in the area of work?
Yes No
2. 1 Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
X
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
X
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
X
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
X
Are the additions for the purpose of serving new commercial development?
X
Are the additions for the purpose of serving a single-family residential subdivision?
X
Details
of Work to be Completed
Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
X
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
X
How many are existing? 1 4 1 How many are to be added?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
X
How many poles are existing in the project area? 2
What is the height of the existing poles? 45FT
How many poles are to be removed? 2
Are additional poles to be laced? NO
How many? I I What is the height of the additional poles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
X
How many? 1 2 1 What is the height of the poles after? 45FT
Describe the modification rebuild: LIKE FOR LIKE REPLACEMENT
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: 'R� c5. %�' DATE: 03/17/24
APPLICANT PRINTED NAME: ANDREW S. RIFE
APPLICANT TITLE: ENG TECH III
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
Aen
aHPg"ef Ii"ETd9Nr i+"cA1M: ffgpgolSSH COUNTY
LOCATION 1450 OLYMPIC VIEW DR LYNNWOODAREA
POLE NO.156 &159 SEI/4S 13 T 27 R 03 DATE 03/05/22 ORDER 100092624
REASON FOR WORK REPLACE BAD ORDER POLES ENGINEER A. RIFE OPERATION 0030
FOR PUD PRI-5 DRAFTER u.G. NO.
SCALE 1" =100'
APPROVED
IIIDATE PRINTED
DATE WORK COMPLETED
FOREMAN
FEES REQ'D OYES ONO
PRIMARY OVERHEAD
O RESIDENTIAL
O COMMERCIAL
LEO NO.
SECONDARY OVERHEAD
NESC VIOLATIONS
BASIC FEE f
O NO O YES (SEE NOTES)
PERMITS (DATE GRANTED)
O TREE TRIM
O STATE
'Qs 'ms
METER/CONV. POLE s
PRIMARY UNDERGROUND
O RESIDENTIAL
O COUNTY
O COMMERCIAL
O CITY
BASIC FEE f
O
EASEMENTS
LEU NO.
'Qs 'ms
O REOUIRED O NOT REQUIRED
SECONDARY UNDERGROUND
BASIC FEE S
DATE RELEASED
'Qs '.s
UNDERGROUND PLAT
FOREIGN CONTACTS
O JPN• 100092624
BASIC FEE s
g FT.CS '.s
O JOINT TRENCH ZIPLY & CATV
STREET LIGHTING
0JOINT BORE ZIPLY & CATV
q FT.@$ '-s
O
POLE STENCILING
WORK IN RIGHT OF WAY
FROM TO
O PRIMARY
TAKE OFF POLE
O SECONDARY
PRE-
FT.CS '.s
O THE
O SAC
TRIM O PUD LOC �_
H a oid p LOC
MISCELLANEOUS FEES
VAULT f
O ONE
pasne F uels
CAL�#nnl�AT9 �ii uI sivauaan
PERMIT f
No.
abeluoil ao sai I I n 01 96eL
f
STRE
O YES
T Irt as Ileus lueoi
f
f
M&R
AS -BUILT
f
GIS
TOTAL DUE f
DATE PAID
GIS OC
M&R
GIS Ph
JOINT USE
RECEIPT NO.
MAP PAGE 454H-4
SERVICE ORDER NO. ILOCATION
I F(;FNn:
O EXISTING POLE
0 EXISTING POLE -TO BE REMOVED
• NEW POLE
)1( NEW P 'ItT tv POLE
DATE
SUBSTATION MPL
CIRCUIT NO. 12-345 PHASE 123
ENGR'S TEL. •
425-783-8559
ENGR'S CELL •
425-783-8559
LOC A-PLI-159
SET 45FT POLE T.N.OF EXISTING POLE
SET POLE 6.5FT DEEP
FRAME POLE PER CS-12F303,12F601,12V115, AND 11,1705
TRANSFER PRI/NEUT CONDUCTORS (3)*4CU SO PRI & (1)*4CU SO NEUT
TRANSFER OVHD SEC SVC'S
INSTALL NEW 3/8"DOWNGUY AND ANCHOR 12" SINGLE HELIX ANCHOR
W/L-8FT TO E. VEG WROK REQUIRED FOR NEW ANCHOR INSTALL
TRANSFER EXISTING XFMR 25-20234 SER*
TRANSFER SL-130255
BUILD NEW 3" SEC RISER PER CS-1U705
FROM XFMR 25-20234 INSTALL 9OFT OF 350 TRIPLEX
TO PED AT LOC C.
STRIP Ott) POtE AND ABANDON TO COW
LOC B PLI-156
SET 45FT POLE T.S.OF EXISTING POLE
SET POLE 6.5FT DEEP
FRAME POLE PER CS-12F303 AND 12F601
TRANSFER (3)*4CU SOL PRI AND (1)*4CU SOL NEUT CONDUCTORS
N SLEEVE *4CU THROUGH.NO NEED FOR DD DEADEND
TRANSFER 1PH LATERAL TO WEST.HANG LCBU AND REFUSE
LATERAL AT 65AMPS
TRANSFER OVHD SEC SVC'S
RMV XFMR 37.5-3078 SER*
INSTALL XFMR BAG AND CAUTION TAG ON XFMR
MARK SUSPECT PCB'S ON CAUTION TAG
HANG A 1PH 37.5KVA XFMR 120/240/7200V
UTC* 37.5-
SER*
SEC V
FUSE XFMR AT 10AMPS
'a�IAOW�]�A �]]]V S�]�Od (1�O
AHllt�Fi f� � i li i 14 dl IMl d
ANV Ol NOISIADWNOIiV00_1321 'S311l-l1.L 13YG®UTV
ON djqO� -
IV2JCI aNVOHiN00 NOISO2:F (3)*4CU SOL PRI
8I NOdSAH SI H010` HiN00/2JAN2\0(1)*4CU SOL NEUT
10 RMV 37 W/PCB'S 3
aad
wI ,
V
FU65 'Z
/25
1 37.5
FU65 2 /
MPL 12-343 MPL 12-343
BEFORE AFTER
SCHEMATIC
NTS
(3)*4CU SOL PRI
(1)*4CU SOL NEUT
2 3
.ECEIVED
FEB 21 2024
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
SHEET OF
4310N S`d 43n02JddV
RECEIVED
FEB 21 2024
I HOS
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
WORK IN TRAVEL LANE
(MAINTAINING TWO-WAY TRAFFIC, 35 MPH OR LESS)
W20-1
ROAD
WORK 'r
AHEAD
X
ROAD O R
NARROWS =
X
W1-4R
N
J
m
NN
LLLLJ
U
J
O
CN
J
F-
LLJ
O
ry
-0
f-
O
(n
O
O
00
O
co
00
-O
O
O
O
10' 0 100
❑
Im
uilN
O
O
O
O
O
O
O
O
01
O
CV
J
292
X
y W1-4L
X
ROAD
i WORK
AHEAD
W20-1
CITY OF EDMONDS
Right -of -Way Application #1446032 - WO 100092624
RECEIVED
FEB 21 2024
MyBui ldi ngPermi t. com
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
Applicant
First Name Last Name Company Name
Moe Matthews Snohomish County PUD
Number Street Apartment or Suite Number E-mail Address
PO Box 1107 permits@snopud.com
City State Zip Phone Number Extension
Everett WA 98206 (425) 783-5681
Contractor
Company Name
Owner
Number Street Apartment or Suite Number
City State Zip Phone Number Extension
State License Number License Expiration Date UBI # E-mail Address
Project Location
Number Street Floor Number Suite or Room Number
T18100 ggT"PFq_\WW DR
City Zip Code County Parcel Number
EDMONDS 98026 OQJ6W80200
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions)_
Work Location
Property Owner
First Name Last Name or Company Name
[IR �fff
g4AREGG & FRASIER J ALIX Hinrichs
Number Street Apartment or Suite Number
09to @gT"PFq V49W DR
City State Zip
EDMONDS WA 98026-5209
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 2/21/2024 Submitted By: Moe Matthews
Page 1 of 2
i
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1446032 - WO 100092624
Project Contact
Company Name: PUD
Name: Andy Rife Email: asrife@snopud.com
Address: PO Box 1107 Phone #: (425) 239-8210
Everett WA 98206
Project Type
Utility Purveyor
Activity Type
Utility Work
Scope of Work
Disturbance of Surface
Project Name: WO 100092624
Description of Work: WO 100092624: PUD crews to replace BO pole. Reapplying for expired
ENG2022-0096.
Project Details
Project Information
Job Number
WO 100092624