Loading...
APPROVED ENG PLN RESUB 1-BLD2023-0071+Site_Plan+5.6.2023_2.59.28_PM+3529317LEGAL DESCRIPTION LOT 7, BRACKETT'S RESERVE, ACCORDING THE THE PLAT THEREOF RECORDED UNDER RECORDING NUMBER ____--------- RECORDS OF SNOHOMISH COUNTY, WASHINGTON. SITUATE /N THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON BASIS OF BEARINGS HELD A BEARING OF NORTH 8945'00" EAST ALONG THE MONUMENTED CENTERLINE OF 240TH ST SW PER PLAT OF EDMONDS HIGHLANDS. HORIZONTAL DATUM NAD '83/'07 PER SNOHOMISH COUNTY MONUMENT DESIGNATION 1379 AT THE SOUTHWEST CORNER OF SECTION 31, TOWNSHIP 27 NORTH, RANGE 4 EAST, W.M VERTICAL DATUM NAVD '88 AS VERIFIED TO SNOHOMISH COUNTY CONTROL POINT 25. BENCH MARK SNOHOMISH COUNTY CONTROL POINT 25 FOUND INVERTED NAIL /N CONCRETE MONUMENT DOWN 1.0' IN CASE AT THE CENTERLINE OF 236TH ST SW AT THE INTERSECTION WI TH 92ND A VE W. ELEVA TION. 442. 74' IBM A' AT FOUND X' IN 1-112" BRASS DISK STAMPED "WSl 16916" IN 4'X4" CONCRETE MONUMENT DOWN 0.4' IN CASE LOCATED AT THE INTERSECTION OF 240TH ST SW & 92ND AVE W. ELEVA TION: 429.50' IBM B' AT FOUND 'X' IN 1 3/4" BRASS DISK /N 4'X4" CONCRETE MONUMENT DOWN 0.3' IN CASE LOCATED AT THE CENTERLINE RIGHT-OF-WAY FOR 240TH ST SW, SOUTH OF HOUSE NO. 9019. ELEVA TION. 455.40' JT/L/TY NOTE LL NEW UTILITIES ARE REQUIRED TO BE INSTALLED UNDERGROUND. CONSTRUCT/ON NOTE PPL/CANT SHALL REPAIR/REPLACE ALL DAMAGE TO UTILITIES OR FRONTAGE IMPROVEMENTS It C/ TY RIGHT —OF— WA Y PER Cl TY STANDARDS THA T /S CAUSED OR OCCURS DURING THE ERM/ TTED PROJECT. EASEMENT NOTE LL EASEMENTS SHOWN ON THESE PLANS WILL BE RECORDED W/ TH THE PLAT. ELECTRIC VEHICLE CHARGING STATION NOTE THE VEHICLE PARKING SPACE WITHIN THE GARAGE SHALL BE ELECTRIC VEHICLE READY. THE GARAGE SHALL INCLUDE A FULL Y— WIRED CIRCUIT W/TH LEVEL II OR LEVEL III (PER ECDC 1 Z 115) ELECTRICAL VEHICLE CHARGING RECEPTACLE OUTLET OR TERMINATION POINT, INCLUDING CONDUIT AND WIRING AND THE ELECTRICAL SERVICE CAPACITY (208 V140 AMP MINIMUM) NECESSARY TO SERVE THE RECEPTABLE, THAT ALLOWS FOR FUTURE /NSTALLA T/ON OF AN ELECTRICAL VEHICLE CHARGING STA T/ON. SE1/4, SEC 31, TWP 27N, RGE 4E, W.M. il)M CKETTffS RESERVE -LOT 7 S/TE DEVELOPMENT PLANS I I BLOCK 12 HA BURY'S SOUND VIEW TRACS V. 7 / PG.20 LOT 5 I LOT 4 II 1 1 EDMONDS SCHOOL DISTRICT 15 EXISTING FIRE HYDRANT Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. G I / / T HIGHLANDS ?00404125344 TBM B' 0 ELEV. = 455.40' OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE BLD2023-0071 4 VICINITY MAP NOT TO SCALE J"IN SCALE. 1 " = JO' 0 15 30 60 RAM ENGINEERING, INC. Civil Engineering / Land Planning 19109 36TH AVE W, SUITE 100 LYNNWOOD, WA 98036 PHONE: (425) 678-6960 WWW.RAMENGINEERINGINC.COM Ma PROJECT TEAM Z OWNER/APPLICANT LANDSCAPE PACIFIC RIDGE - DRH, LLC CRAMER DESIGN CONSULTANTS, INC. 17921 BOTHELL-EVERETT HWY,, SUITE 100 1909 242ND ST SE BOTHELL, WA 98012 BOTHELL, WA 98012 (425) 939-1162 (425) 241-6258 CONTACT. JEFF WEGENER CONTACT.- GAYLE CRAMER 'w JLWEGENER@PACIFICRIDGEHOMES.COM CDCLSAOFRONTIER.COM �+ CIVIL ENGINEER GEOTECHN/CAL O RAM ENGINEERING, INC. EARTH SOLUTIONS NW, LLC J 16531 13TH AVE W, SUITE A 108 1805 136 TH PL NE, SUITE 201 L YNNWOOD, WA 98037 BELLEVUE, WA 98005 1 (425) 578-6950 (425) 284-3300 CONTACT. ROB L. LONG, PE CONTACT.- HENRY WRIGHT, PE ROBL@RAMENG/NEERING/NC. COM HENRY. WR/GHTOEARTHSOLUTIONSNW. COM w SURVEYOR AXIS SURVEY & MAPPING 15241 NE 90TH ST Lo REDMOND, WA 98052 O O (425) 823-57 VI O CONTACT- TRAVIS BRADLEY, PLS TRA VIS@AXISMAP. COM WAN SITE DA TA Q SITE ADDRESS. 23902 91 ST PL W, EDMONDS, WA 98026 Q TAX ACCOUNT NUMBER(S): 00463301300400, 00463301300301, J 00463301300303, 00463JO120040J O AGENCIES/UTILITIES LU V y JURISDICTION CITY OF EDMONDS Q Z STORM DISTRICT CITY OF EDMONDS O WATER DISTRICT OLYMPIC VIEW WATER & SEWER DISTRICT SEWER DISTRICT OLYMPIC VIEW WATER & SEWER DISTRICT SCHOOL DISTRICT EDMONDS SCHOOL DISTRICT NO. 15 Q FIRE DISTRICT SNOHOMISH COUNTY FIRE DISTRICT NO. 1 Q TELEPHONE Z/PLEY ELECTRICAL SNOHOMISH COUNTY PUD NO. 1 GAS PSE 40 GARBAGE REPUBLIC SERVICE SHEET INDEX C� SITE DEVELOPMENT PLANS 1 SP-O 1 COVER SHEET 2 TP-01 SITE DEVELOPMENT PLAN 3 GN-01 GENERAL NOTES & DETAILS RETAINING WALL PLANS (TO BE CONSTRUCTED AS PART OF BRACKETT'S RESERVE PLAT - PLN2021-0037) W1 LOCK & LOAD WALL DESIGNS & NOTES W2 MODULAR BLOCK WALL DESIGN & NOTES W3 ROCKERY DESIGNS & NOTES RESUB May 08 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Know whays below. Callbefore you dig. BLD2023-0071 APPROVED FOR CONSTRUCTION CITY OF EDMONDS 6/7/2023 DATE: BY CITY ENGINEERING DIVISION �OY WASV, 38608 �'CL! CISTER�'9 ENGINEER. ROB L. LONG, PE DRAWN BY.• MIKE MORRIS ISSUE DA TE.• SCALE.• 51512J AS NOTED JOB NO: 20-024 SHEET: CV-01 SHT I OF 3 SE1/4, SEC 31, TWP 27N, RGE 4E, W.M. • / INSTALLED 2' X 2' DRYWELL APP VED AND CAP G LOCATI ( ) WITH 3/4" TO 1-112" DRAIN \ SE LAN SCA PL APPRO A • ROCK FOR FOOTING DRAIN OVWSD WATER RT P T B CK S RE ER PL CONNECT/ON (2' MIN DEPTH) SYSTEM (PL 021 037 \ A RO ERl A TO E ON S UC D A PA OF 6=175748" BR KE S R ER PL R=45.00' C NS CTI (P 20 -00 ) L=14.11' 46 FIG INSTALL 1-1/2" PE (160 P5I) SERVICE LINE FROM WATER METER TO HOUSE. • TRACER WIRE TO BE INSTALLED • • a • • • W/ TH WATER LINE. • N 4 - (1 " WATER SERVICE &METER TO BE SBL 1 \ STALLED AS PART OF BRAckETT'S -- - - - -- - ERVEPLAT.) � I LA =====1=I�-I-====----==_ \ • d=7206'02" ----- - B ��� \ R=20.00' "-�r ROOF E NO THl SH T) i • • • 6 TO 46 0 4 3.4 10' BSBL 4 A oD -N 4" PVC FOOTING rn A DRAIN TIGHTLINE \ II HEAT PUMP I I ® 1.0q MIN I ___ ____ OVWSD SE (HEAT PUMP TO BE I II -,$\STEM HUNG ON BUILDING /F I I I OVER 36" IN HEIGHT) I 453.81 % FG CHANNEL DRAIN J� 4, 537 SF TOP 453.81 (NORTH END) 449 1.49 . _ \ PROPOSED HOUSE TOP 453.71 (SOUTH END) O LOWER FF 454.37 NDS PRO CHANNEL DRAIN II CONCRETE Q OR APPROVED EQUAL III- DRI VEWA Y II U GARAGE 4" PVC SIDE SEWS p FF 454.03 I @ 2.07 MIN SLOP U I I SSCO CONNECT TO SS � lE 451.0± lE 450.Of a 6. 67 SOCO I I TOP 465. 0.TO2 /E 452.0 2.09- FG3.71 _ 4.49 11 I E 454.44 _ -- ------ - DR UTl4/TIES -�-- P�_ -- 16 -�� TOP 465.2 N89' 5'00" 10 .i00' TOE 463.4 1 8 I ICONNEICT CHANNEL 455.7 I DRAIN I TO So TIGH 6E FIG ALL CONCRETE BLOCK WALLS ARE I I I a TO AE CONSTRUCTED AS PART OF I I I 4" PVC ROOF DRAIN RACKE.'-T'S RESERVE PLAT TIGHTLINE ® 1.09 MIN. FI IST RUCTION (PLN2021-0037) CONNECT /E 450.5f TO SD STUB INSTALL FOUNDATION/FOOTING DRAIN 10' JOIN CONSTRUCT STABILIZED TEMPORARY UTILITY T IaI ALONG BUILDING PER/METER FOOTINGSI PER FOOTING DRAIN DETAIL BY EARTH CONSTRUCTION ENTRANCE PER CITY EASEMENT SOLUTIONS NW ON SHEET GN-01 OF EDMONDS STD DWG NO ER-901 (SEE DETAIL ON SHT GN-01) FOOTING DRAINS NOT TO BE TIED INTO I I aI DETENTION SYSTEM � I III ALL DISTURBED SOILS SHALL BE COMPOST AMENDED PER CITY OF a EDMONDS STANDARD DETAIL SD-642 OR APPROVED EQUAL. I I I l Ia.I OWNER/CONTRACTOR IS RESPONSIBLE FOR Applicant shall repair/replace all EROSION CONTROL AND DRAINAGE damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. BUILDING HEIGHT CALCULATIONS (AOG) SPOT ELEVAT70NS FOR HEIGHT CALCULATIONS.• ELEVA 77ON A: 466.42 ELEVATION B. 459.95 ELEVA 77ON C. 466.17 ELEVA TON D: 468.06 TOTAL: = 1860.60 AVERAGE ORIGINAL GRADE (AOG) = 465.15 FINISHED FLOOR = 454.37 ROOF AT RIDGE = 489.60 ALLOWABLE BUILDING HEIGHT = 490.15 PER CITY OF EDMONDS (465.15 + 25 FT) DA TUM REFERENCE NOTE: SEE SHEET CV-01 (SHEET 1) FOR BENCHMARK LOCATION & DESCRIPTION. LOT COVERAGE *TOTAL NET PROJECT AREA: 89,190 SF *ALLOWABLE COVERAGE (3590): 31,217 SF COVERAGE ALLOCATED TO EACH LOT 2,838 SF (31,217 SF/11 LOTS) LOT 7 ONLY ACTUAL LOT COVERAGE: 1, 728 SF (HOUSE, COVERED DECK & GARAGE) *THIS LOT /S PART OF A CONSERVARON PLAT (BRACKETT'S RESERVE PLN2021-0037). WHERE LOT COVERAGE /S CALCULATED BASED ON THE TOTAL NET PROJECT AREA ACROSS THE PARENT LOT. I I I � FRONTAGE IMPROVEMENTS PER PLN2021-0037 SHALL BE COMPLETED PRIOR TO CONSTRUCTION FINAL OF NEW SINGLE-FAMILY RESIDENCE. IMPERVIOUS AREAS L=25.17 I 4 3 ROW 20' I I I ALL SHORT PLAT IMPROVEMENTS SHALL BE COMPLETED PRIOR TO FINAL APPROVAL OF THE SINGLE FAMILY RESIDENCE, UNLESS APPROVED OTHERWISE BY THE CITY'S ENGINEERING DIVISION. LOT 7 HOUSE+COVERED D/W, PATIO, PORCH, WALK 1,877 SF (ROOF LINE) UNCOVERED PATIO AND WALK 100 SF UNCOVERED DRIVEWAY 800 SF TOTAL = 2,777 SF STORMWATER CONTROL SUMMARY PROJECT S/TE CA TEGOR K CA TEGORY 2 DISCHARGE LOCATION. CITY MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4) TYPE OF AREA LOT 7 ONLY SQUARE FOOTAGE STORMWA TER FACILITY LA WN AND LANDSCAPE 1, 805 SF SOIL AMENDMENTS ROOFS 1,877 SF DETENTION VAULT HARD SURFACES 257. RETROFIT 900 SF 0 SF DETENT70N VAULT N.A. PROJECT CLASS/FICA T/ON PROJECT CLASSIFICATION. CATEGORY 2 EDMONDS WATERSHED BASIN: EDMONDS WAY FLOW CONTROL STANDARD. DETENT70N VAULT (MR 7 FLOW CONTROL) STORMWA TER BMPS. • POST CONSTRUCTION SOIL AMENDMENT (T5.13) �� INSPECTION REQUIRED PRIOR TO BACK FILL ALL PUBLIC ROAD IMPROVEMENTS & UTILITY STUBS SHALL BE CONSTRUCTED/INSTALLED AS PART OF BRACKETT'S RESERVE PLAT (PLN2021-0037) INSTALL TEMPORARY SEDIMENT TRAP • FOR CATCH BASINS PER CITY OF / EDMONDS STD DWG NO ER-902 (SEE DETAIL ON SHT GN-01) • N SCALE. 1" = 10' 0 5 10 20 ACCEPTABLE TIGHTLINE MATERIAL: SDR 35 SCH 40 N-12 F810 HANCOR APPROVED BY PLANNING Jun 07 2023 Zone RS-8 Corner N__. Flag ___N__ Setbacks: * Required * Actual Front 15' E = 15' - ----5-_---- N = 6.4' Side - - S = 5' Rear 10, W=10' Other Height 25' 24'-5(1/2)" Conservation subdivision setbacks applied. CONDITIONS- -Heat pump if mounted to the wall may not project more than 30" into the required setback, similar to eaves and chimneys. If unit is placed on the ground, the unit may not be more than 36" in height from original grade including pad within the required setback. -A separate permit is required for all fencing. UTILITY SEPARATION REQUIREMENTS WA TER • 18" MINIMUM COVER FOR WA TER SERVICES. • 3' MINIMUM HORIZONTAL SEPARATION BETWEEN WATER SERVICES AND ALL OTHER UTILITIES, EXCEPT SANITARY SEWER. • 10' HORIZONTAL SEPARATION BETWEEN SANITARY SEWER AND WATER MAINS OR SERVICES. • 12" MINIMUM VERTICAL SEPARATION, FOR PERPENDICULAR CROSSINGS, BETWEEN WATER MAINS OR SERVICES AND ALL OTHER UTILITIES, EXCEPT SANITARY SEWER. SANITARY SEWER • 2' MINIMUM COVER FOR SIDE SEWERS & LATERALS. • 5' MINIMUM HORIZONTAL SEPARATION BETWEEN SAN/TAR Y SEWER AND ALL OTHER UTILITIES, EXCEPT WATER. • 10' HORIZONTAL SEPARATION BETWEEN SANITARY SEWER AND WATER MAINS OR SERVICES. • 12" MINIMUM VERTICAL SEPARATION, FOR PERPENDICULAR CROSSINGS, BETWEEN SANITARY SEWER AND ALL OTHER UTILITIES, EXCEPT WATER. • 18" MINIMUM VERTICAL SEPARATION BETWEEN WATER AND SEWER, SEWER LAID BELOW WATER. STORM • 2' MINIMUM COVER FOR STORM SYSTEMS, UNLESS DUCTILE IRON PIPE IS USED. • 5' MINIMUM HORIZONTAL SEPARATION BETWEEN STORM AND ALL OTHER UTILITIES OUTSIDE AGENCY UTLI TIES • 36" MINIMUM COVER FOR JOINT GAS, ELECTRIC, TELEPHONE, CABLE TV SERVICE AND CONDUCTORS. • 36" MINIMUM COVER FOR A PRIMARY DISTRIBU77ON SYSTEM. 1,GUILDINt; EAVE NOTE TESC INSTALLATION / MA/NTENANCE NOTES 1. INSTALL AND MAINTAIN ALL TESC MEASURES ACCORDING TO APPROVED PLANS, EDMONDS STANDARD DETAILS, AND THE SWPPP. CONTRACTOR /S RESPONSIBLE FOR MAINTENANCE AND ADJUSTMENTS TO TESC MEASURES AS NEEDED. 2. CATCH BASIN INLET PROTECTION SHALL BE INSERTED AND MAINTAINED ON ALL CATCH BASINS CONSTRUCTED AS PART OF SHORT PLAT AND ALL EXISTING CATCH BASINS W/THIN 500 FEET OF THE CONSTRUCTION AREA. J. ADD/TONAL FILTER FABRIC FENCING SHALL BE ADDED AS NEEDED. FENCING TO BE INSTALLED PER CITY OF EDMONDS STD DETAIL ER-900 (SEE DETAIL ON SHT GN-01). 4. STOCKPILE SHALL TO STABILIZED BY PLASTIC COVERING. THE EXPOSED SOILS SHALL BE STABILIZED ACCORDING TO AN APPROVED TIMETABLE. (TYPICALLY, NO SOILS SHALL REMAIN EXPOSED FOR MORE THAN TWO DAYS FROM OCTOBER 1 THROUGH APRIL 30 AND NO MORE THAN SEVEN DAYS FROM MAY 1 THROUGH SEP TEMBER 30). 5. ALL DISTURBED SOILS WILL BE COMPOST AMENDED PER CITY OF EDMONDS STD DETAIL SD-642. (SEE DETAIL ON SHT GN-01). TESC NOTES 1. ESC MIN/MUM REQUIREMENT -CONSTRUCTION ACCESS ROUT, CONSTRUCTION VEHICLE ACCESS SHALL BE, WHENEVER PRACTICAL, LIMITED TO ONE ROUTE. ACCESS POINTS SHALL BE STABILIZED WITH QUARRY SPALLS OR CRUSHED ROCK TO MINIMIZE THE TRACKING OF SEDIMENT ONTO PUBLIC ROADS /F SEDIMENT IS TRANSPORTED ONTO A ROAD SURFACE, THE ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM ROADS BY SHOVELING OR SWEEPING AND BE TRANSPORTED TO A CONTROLLED SEDIMENT DISPOSAL AREA WITHIN 24 HOURS STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED /N THIS MANNER. 2. ESC MINIMUM REQUIREMENT -STABILIZATION OF EXPOSED AREAS. ALL SOILS EXPOSED BY LAND DISTURBING ACTIVITIES SHALL BE STABILIZED BY SUITABLE APPLICATION OF BMPS, INCLUDING, BUT NOT LIMITED, SOD, HYDROSEED/NG, OR OTHER VEGETATION, PLASTIC COVERING, OR MULCHING. ALL BMPS SHALL BE SELECTED, DESIGNED, AND MAINTAINED IN ACCORDANCE WITH THE MANUAL. THE EXPOSED SOILS SHALL BE STABILIZED ACCORDING TO AN APPROVED TIMETABLE. (TYPICALLY, NO SOILS SHALL REMAIN EXPOSED FOR MORE THAN TWO DAYS FROM OCTOBER 1 THROUGH APRIL 30 AND NO MORE THAN SEVEN DAYS FROM MAY 1 THROUGH SEP TEMBER 30). J. ESC MIN/MUM REQUIREMENT -PROTECTION OF ADJACENT PROPERTIES. ADJACENT PROPERTIES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION BY APPROPR/ATE USE OF VEGETATIVE BUFFER STR/PS, SEDIMENT BARRIERS OR FILTERS, DIKES OR MULCHING, OR BY A COMBINATION OF THESE MEASURES AND OTHER APPROPR/ATE BMPS. 4. ESC MIN/MUM REQUIREMENT- MA/NTENANCE. ALL EROSION AND SEDIMENT CONTROL BMPS SHALL BE REGULARLY INSPECTED AND MAINTAINED BY THE OWNER TO ENSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL MAINTENANCE AND REPAIR SHALL BE CONDUCTED /N ACCORDANCE WITH THE MANUAL. 5. ESC MINIMUM REQUIREMENT -OTHER BMPS. AS REQUIRED BY THE CITY, OTHER APPROPRIATE BMPS TO MIT/GATE THE EFFECTS OF INCREASED RUNOFF SHALL BE APPLIED. 6. EROSION AND SEDIMENT CONTROL REQUIREMENT- UNDERGROUND UTILITY CONSTRUCT/ON. THE CONSTRUCTION OF UNDERGROUND UTILITY LINES SHALL SPECIFICALLY ADDRESS THE FOLLOWING. a. EROSION CONTROL FOR EXCAVATED AND STOCKPILED MATERIALS; b. THE PLACEMENT OF EXCA VA TED MA TER/AL WHERE CONSISTENT WITH SAFETY AND SPACE CONSIDERA TIONS SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES; C. TRENCH DEWATER/NG SYSTEMS (MUST DISCHARGE INTO SEDIMENT TRAPS, SEDIMENT PONDS, OR OTHER ACCEPTABLE MEANS); d. TRACKING AND SPILLING OF MATERIALS ON STREETS DUE TO HAULING,• e. DAILY CLEANUP AND STREET MAINTENANCE. 7. ADDITIONAL ESC MIN/MUM REQUIREMENTS FOR LARGER DEVELOPMENTS. ALL NEW DEVELOPMENT AND REDEVELOPMENT THAT INCLUDED LAND DISTURBING ACTIVITIES OF GREATER THEN, OR EQUAL TO, ONE ACRE /N ADDITION TO MEETING THE MIN/MUM REQUIREMENTS SET FORTH ABOVE SHALL COMPLY WITH ESC REQUIREMENTS LISTED BELOW. 8. ESC MIN/MUM REQUIREMENT- DELINEATE CLEARING AND EASEMENT LIMITS. IN THE FIELD, MARK CLEARING LIMITS AND/OR ANY EASEMENTS, SETBACKS, SENS/T/VE/CR/TICAL AREAS AND THE BUFFERS, TREES AND DRAINAGE COURSES. 9. ESC MINIMUM REQUIREMENT -SEDIMENT TRAPPING. PRIOR TO LEAVING THE SITE, STORM WATER RUNOFF SHALL PASS THROUGH A SEDIMENT POND OR SEDIMENT TRAP, OR OTHER APPROPR/ATE BMPS. SEDIMENT PONDS AND TRAPS, PER/METER DIKES, SEDIMENT BARRIERS, AND OTHER BMPS INTENDED TO TRAP SEDIMENT ON -SITE SHALL BE CONSTRUCTED AS A FIRST STEP /N GRADING. THESE BMPS SHALL BE FUNCTIONAL BEFORE LAND DISTURBING ACTIVITIES TAKE PLACE. EARTHEN STRUCTURES, SUCH AS DAMS, DIKES, AND DIVERSIONS SHALL BE SEEDED AND MULCHED ACCORDING TO AN APPROVED TIMETABLE. 10. ESC MIN/MUM REQUIREMENT -CUT AND FILL SLOPES. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED /N A MANNER THAT WILL MINIMIZE EROSION. IN ADDITION, SLOPES SHALL BE STABILIZED IN ACCORDANCE WITH ESC REQUIREMENT NO. 2. 11. ESC MIN/MUM REQUIREMENT -CONTROLLING OFF -SITE EROSION. PROPERTIES AND WATER WAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM EROSION DUE TO INCREASES IN THE VOLUME, VELOCITY, AND PEAK FLOW RATE OF STORM WATER RUNOFF FROM THE PROJECT SITE. 12. ESC MIN/MUM REQUIREMENT -STABILIZATION OF TEMPORARY CONVEYANCE CHANNELS AND OUTLETS. ALL TEMPORARY ON -SITE CONVEYANCE CHANNELS SHALL BE DESIGNED, CONSTRUCTED AND STABILIZED TO PREVENT EROSION FROM THE EXPECTED VELOCITY OF FLOW FROM A TWO-YEAR, 24-HOUR FREQUENCY STORM FOR THE DEVELOPED CONDITION. STABILIZATION ADEQUATE TO PREVENT EROSION OF OUTLETS, ADJACENT STREAM BANKS, SLOPES AND DOWNSTREAM REACHES SHALL BE PROVIDED AT THE OUTLETS OF ALL CONVEYANCE SYSTEMS. 13. ESC MIN/MUM REQUIREMENT -STORM DRAIN INLET PROTECTION. ALL STORM DRAIN INLETS MADE OPERABLE DURING CONSTRUCT/ON SHALL BE PROTECTED SO THAT STORM WATER RUNOFF SHALL NOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. 14. ESC MIN/MUM REQUIREMENT -REMOVAL OF TEMPORARY BMPS. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE TEMPORARY BMPS ARE NO LONGER NEEDED. TRAPPED SEDIMENT SHALL BE REMOVED OR STABILIZED ON SITE. DISTURBED SOIL AREAS RESULTING FROM REMOVAL SHALL BE PERMANENTLY STABILIZED. 15. EROSION AND SEDIMENT CONTROL REQUIREMENT-DEWATER/NG CONSTRUCTION SITES. DEWATERING SYSTEMS SHALL DISCHARGE INTO A SEDIMENT TRAP OR SEDIMENT POND. 16. EROSION AND SEDIMENT CONTROL REQUIREMENT -CONTROL OF POLLUTANTS OTHER THAN SEDIMENT ON CONSTRUCTION SITES ALL POLLUTANTS OTHER THAN SEDIMENT THAT OCCUR ON SITE DURING CONSTRUCTION SHALL BE HANDLED AND DISPOSED OF IN A MANNER THAT DOES NOT CAUSE CONTAM/NATION OF STORM WATER. 17. EROSION AND SEDIMENT CONTROL REQUIREMENT -FINANCIAL L/ABILITY. PERFORMANCE BONDING, OR OTHER APPROPRIATE FINANCIAL INSTRUMENTS, SHALL BE REQUIRED FOR ALL PROJECTS TO ENSURE COMPLIANCE WITH THE APPROVED EROSION AND SEDIMENT CONTROL PLAN. [ORD. 3013 1, 1995] ROOF EAVES FOR THIS BUILDING ARE 12"-18" TYPICAL. SEE ARCH/ TECTUAL PLANS FOR DETAILED DIMENSIONS. EAVES MAY PROJECT NO MORE THAN 30" INTO REQUIRED BUILDING SETBACKS. GRADING QUANTITIES CU T. f 100 CU YDS FILL: f 100 CU YDS 1) GRADING QUANTITIES INCLUDE ADDITIONAL CUT AND FILL QUANTITIES POTENT/ALLY NEEDED FOR ORGANIC SOIL AMENDMENTS /N ACCORDANCE WITH BMP T5.13 POST CONSTRUCTION SOILS QUALITY AND DEPTH. 2) GRADING QUANTITIES HAVE BEEN ESTIMATED AS SHOWN ABOVE. SITE IMPORT AND EXPORT /S BELOW 10,000 CY AND THUS NO HAUL ROUTE AGREEMENT IS REQUIRED. Ii I Know whays below. Call before you dig. RESUB May 08 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2023-0071 APPROVED FOR CONSTRUCTION CITY OF EDMONDS 6/7/2023 DATE: 0--xv BY CITY ENGINEERING DIVISION RAM ENGINEERING, INC. Civil Engineering / Land Planning 19109 36TH AVE W, SUITE 100 LYNNWOOD, WA 98036 PHONE: (425) 678-6960 WWW.RAMENGINEERINGINC.COM Ma �OY WASV, � 0� 36508 CL! ���ISTEgY'9 \SSIO>\re 1.�� ENGINEER. ROB L. LONG, PE DRAWN BY.• MIKE MORRIS ISSUE DA TE.• SCALE.• 515123 AS NOTED JOB NO: 20-024 SHEET SP-01 SHT 2 OF 3 2" x 2" WOOD/STEEL FILTER FABRIC SECURED - TO 2" x 2" 14 GA WIRE FABRIC EQUAL 0 I N \/�\ NATIVE BACKFILL MATERIAL s" I FILTER FABRIC MATERIAL IN CONTINOUS ROLLS USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE 2" x 2" WOOD/STEEL POSTS Mi WIRE MESH FENCE o TO SUPPORT FILTER I FABRIC 10 BURY BOTTOM OF FILTER N MATERIAL 8" TO 12" 6' MAX NOTES: 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN AND ENSURE PROPER EROSION CONTROL THROUGHOUT PROJECT. CITY INSPECTION REQUIRED ON 2. SILT FENCE TO BE PLACED DOWNSLOPE OF CONSTRUCTION ALL EROSION CONTROL METHODS ACTIVITY. BEFORE OTHER WORK CAN BEGIN - FILTER FABRIC FENCE REVISION DATE JANUARY 2018 CITY OF EDMONDS FILTRATION SYSTEMS STANDARD PUBLIC WORKS DEPARTMENT DETAIL \s } g E R - 9 00 APPROVED BY: R. ENGLISH Ld z J BUILDING BUILDING 1 w CLEANOUT NOT a_ z TO EXCEED 3FT 10 - FROM CLEANOUT WITH 45' a - FOUNDATION BEND AND CAP of ---, Uli ,--GENERAL CLEANOUT----..: NOT TO EXCEED 100' BETWEEN CLEANOUTS CLEANOUT (WYE W/ CAP & LAMPHOLE COVER) 12 LAMPHOLE COVER w TO MATCH EXISTING o- 0 '�' GRADE z 0- -j 12" PVC SLEEVE 6" RISER " WYE AND 45' BEND _ 6" DISTRICT STUB 4" OR 6" SIDE SEWER r12" CLEANOUT DETAIL AT ASPHALT SURFACE PROPERTY LINE & BUILDING LAMPHOLE COVER 6" RISER 12" PVC SLEEVE PVC CAP. REMOVE NOTE: GASKET PRIOR TO INSTALLATION. SIDE SEWER JOINTS SHALL BE TYPICAL CLEANOUT GASKETED UNDER ASPHALT OLYMPIC VIEW WATER & SEWER DISTRICT REVISIONS STANDARD DETAIL OLYMPIC VIEW SEWER CLEANOUT DETAIL DATE SCALE DWG NO. 11 /18/21 NTS S-3 SE1/4, SEC 31, TWP 27N, RGE 4E, W.M. -LS a TH IN DE FULL WIDTH 3RES5/EGRESS DETAIL NOTES: O THE MINIMUM LENGTH SHALL BE EXTENDED AS NECESSARY TO ENSURE MATERIAL IS NOT TRACKED OFF SITE AND/Oft INTO THE PUBLIC RIGHT-OF-WAY_ O2 ATB DRIVEWAY RAMP AND/OR SITE ACCESS ROAD 15' WIDE MIN. SEE TABLE BELOW FOR REQUIRED LENGTH. NOTES: 1. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. 2. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL QUARRY SPALLS AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY MUST BE REMOVED IMMEDIATELY. 3. WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO LEAVING THE SITE. WHEN WASHING IS USED, IT SHALL BE DONE ON AN AREA STABILIZED WITH QUARRY SPALLS AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 4. INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN. PROJECT SIZE MIN LENGTH OF (FEET) QUARRY SPALLS* < 1/4 ACRE 30 < 1 ACRE 50 < 3 ACRE 100 > 3 ACRE 100 *PROVIDE ATB OR ASPHALT TRANSITION WHERE FRONTAGE ROAD IS AN ARTERIAL. LENGTH TO BE DETERMINED BY CITY INSPECTOR. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN _ REVISION DATE CITY OF EDMONDS STABILIZED CONSTRUCTION JANUARY 2018 ENTRANCE PUBLIC WORKS STANDARD DEPARTMENT DETAIL s p g 9d APPROVED BY: R. ENGLISH E R- 9 01 UNDISTURBED PLANTS UNDISTURBED TURF (LAWN) (SEE NOTE 1) AREAS (SEE NOTE 1) UNDISTURBED NATIVE VEGETATION UNDISTURBED NATIVE SOIL OPTION 1 - NO DISTURBANCE PLANTING BEDS TURF (LAWN) AREAS 2" ORGANIC MULCH UNDISTURBED TURF/LAWN/LANDSCAPE UNDISTURBED NATIVE SOIL STEEP SLOPE NOTE: AMENDED SOILS SHOULD NOT BE INSTALLED ON FINISHED SLOPES EXCEEDING 33%. AREAS EXCEEDING 337 SHALL BE STABILIZED PER THE ENGINEER/GEOTECH OF RECORD, GRASS: SEED OR SOD 3" OF COMPOST LII�II 111-II IIIL111- II�T =-Il1-1111111 TI I 1,75" OF COMPOST INCORPORATED INCORPORATED INTO 5" OF II�II=11� iI III III I �11=11�11=II�II-ill I I I I€ I IIIIIIII I I INTO 6,25 OF SITE SOIL (TOTAL SITE SOIL (TOTAL AMENDED �__ _ �= AMENDED DEPTH OF 9.5", FOR A DEPTH OF 9.5", FORA 11=III-III-11�11=111�11 HII-II-11�111-III II 11=III=11iII-E -III-III-III=1 I 11�11=III SETTLED DEPTH OF 8") SETTLED DEPTH OF 8' ') -III J11=111-1L�� III- LIJ�-III= -ill-J)L- 1 f=111-I I1=1 I I� 11-1 I-! 11 � I I 111� 11 111-III III g 11-111-11 11 I I J 1 1-11 1-I IF 11I 111 111 I I �I 1 SUBSOIL SCARIFIED 4" BELOW SUBSOIL SCARIFIED 4" BELOW COMPOST AMENDED LAYER T,\ COMPOST AMENDED LAYER (12" BELOW SOIL SURFACE) E�-- _' �/ (12" BELOW SOIL SURFACE) OPTION 2 AMEND IN PLACE OR STOCKPILE AND AMEND GENERAL NOTES: PLANTING BEDS TURF (LAWN) AREAS 1. AREAS OF NO DISTURBANCE y „/ SHALL BE FENCED AND EXISTING 2" ORGANIC GRASS: SEED VEGETATION AND SOIL SHALL BE MULCH �/ / 0" OR SOD PROTECTED FROM CONSTRUCTION LI 11illIII1 IIII11 i t i1 I I1 I I\III\IIIi I I1 i11111 l iIII11 III1 1 11 I I\I I I� I I\III\I I I IMPACTS. 6" IMPORTED I I-1 I I-1 I I-1 I I-1 I I.I I I-1 111 1 1 I I 11R.WA I-1 I L=1 I I.I I I.I I E-1 I I-11 I 1 1 1 111 6" IMPORTED 2. TO MEASURE SLTTLED DEPTH, ER 501E SUFFICIENTLY TO TOPSOIL MIX ill -III -III -III -III -III- =III -III -III -III -III- =ill=III=III=III=III-III TOPSOIL MIX FULLY SATURATE WITHOUT (COMPACTED II=III=III=III=III=III=III IIIIIHII=III11H IIHIIIIHIHII=III (COMPACTED CAUSING EROSION. DEPTH) 11IIIIIIIIIIII=III=III IILI 6 =ill=IIIIII=III=III=III =ITT DEPTH) �II1�iN-11f ]Ilr IIIr _ LI I. _III -ill -III-III 3. COMPOST SHALL MEET SPEC. REQUIREMENTS IN THE 2017 SUBSOIL IS // \, \ II / SUBSOIL IS EDMONDS STORMWATER ADDENDUM (CHECKLIST 7). SCARIFIED 6" / y\/ ���/ ,� SCARIFIED 6" BE MPORTOED �-LW\ MP 4. COMPACTION OF TOPSOIL (WHERE TOPSOIL MIX'/ / 12" ' TOPSOIL MIX REQUIRED) TO BE TO 85% (MAX) - I OF THE MAXIMUM DRY DENSITY OPTION 3 IMPORT TOPSOIL PER MODIFIED PROCTOR TEST (ASTM D1557). REVISION POST CONSTRUCTION SOIL PI�I�N2oz�E CITY OF EDMONDS QUALITY AND DEPTH PUBLIC WORKS STANDARD DEPARTMENT DETAIL FSt 189I APPROVED BY: R. ENGLISH SD-642 CATCH BASIN GRATE FILTER SOCK WITH OVER FLOW HOLES (TYP) CATCH BASIN NOTES: 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN THIS APPLICATION AT ALL TIMES DURING CONSTRUCTION PERIOD. 2. ANY SEDIMENT IN CATCH BASIN INSERT SHALL BE REMOVED WHEN INSERT 15 ONE-THIRD FULL, 3. CITY INSPECTION REQUIRED ON ALL I EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN. _ REVISION DATE CITY OF EDMONDS TEMPORARY JANUARY 2018 SEDIMENT TRAP PUBLIC WORKS FOR CATCH BASINS STANDARD DEPARTMENT DETAIL APPROVED BY: R. ENGLISH EIR-902 NOTES: • Do NOT tie roof downspouts t0 Footing Drain. • Surface Seal to consist of 12" of less permeable, suitable soil. Slope away from building. LEGEND: Surface Seal: native sail or other low -permeability material. ;.r.r.r.r 1-inch Drain Rock Perforated Rigid Drain Pipe (Surround in Drain Rock) SCHEMATIC ONLY - NOT TO SCALE NOT A CONSTRUCTION DRAWING Drwn. MRS Date 06/17/2021 Proj. No. 7610.01 Checked HTW I Date June 2021 Plate 4 6" MIN DEPTH SET DEPTH AS REQ D FOR POSITIVE FLOW FROM WALL/HOUSE FOOTING DRAIN filter fabric compacted backfill 6' .I I yOM,•i•;y ... . `�:.r�s.r_�.z.r: Washed rock 1 Y2" - 3/4" 24" -- FOOTING DRAIN DRYWELL TRENCH NOT TO SCALE GENERAL NOTES 1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS.- - CURRENT INTERNATIONAL BUILDING CODE (IBC) - CURRENT WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION 2012 WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON (AS AMENDED IN DECEMBER 2014) 2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDARD DETAILS, UNLESS NOTED OTHERWISE J. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBS/TE WHENEVER CONSTRUCTION /S /N PROGRESS. 4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL GOVERNING AUTHORITY 5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF 'AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL ASBUILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT APPROVAL. 6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION. 7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT /S THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE EXISTING UTILITIES AND SITE FEATURES PRESENTED ON THESE DRAWINGS. ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT ARISE. 8. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES LOCATION SERVICE (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. 9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OWNERS REPRESENTATIVE OF ANY DISCREPANCIES. 10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS. 11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED /N STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT. 12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT. 13. SUBGRADE SOILS IN ALL AREAS WHERE RAIN GARDENS, INFILTRATION OR PERVIOUS PAVEMENT /S TO BE PLACED SHALL BE DELINEATED AND PROTECTED AT ALL TIMES FROM COMPACTIVE ACTIVITIES (I.E. HEAVY EQUIPMENT, STOCKPILING). 14. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL. IF SOIL IS DISTURBED, SOFT, LOOSE, WET OR IF ORGANIC MATERIAL /S PRESENT AT SUBGRADE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FILL PER GEOTECHNICAL REPORT. 15. SEE SURVEY AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR EXISTING SITE FEATURES 16. SEE ARCHITECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS. FOUNDATION DRAINS SHALL BE INDEPENDENT OF OTHER SITE DRAIN LINES AND SHALL BE TIGHTLINED TO THE STORM DRAIN SYSTEM WHERE INDICATED ON THE PLANS 17. ALL REQUIRED STORMWA TER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER. 18. ALL ROOF DRAINS, CATCH BASINS AND OTHER EXTERNAL DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE. 19. ALL FOOTING DRAINS SERVING BUILDINGS, WALLS, ROCKERIES, ETC. SHALL CONNECT TO THE DRAINAGE SYSTEM OR INDIVIDUAL DRYWELLS. 20. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE IMPROVEMENTS INDICATED ON THESE DRAWINGS. 21. A SEPARATE IRRIGATION PERMIT MUST BE OBTAINED FROM THE CITY PUBLIC WORKS DEPARTMENT. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, PROVIDE TO OLYMPIC VIEW WATER & SEWER DISTRICT, A COPY OF THE BACKFLOW TEST REPORT. T R %rTS Cn ^^ r" ^^ T^ ""` ,'TT c^" GR 4" �^ T^ BACKFLOW TESTING SHALL BE COMPLETED BY THE OWNER ANNUALLY THEREAFTER. 22. AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BE RETURNED TO THE EQUIVALENT OF THEIR PRECONSTRUCTION CONDITION /N ACCORDANCE WITH APPROPRIATE REQUIREMENTS AND STANDARDS. 23. ALL DISTURBED SOIL AREAS SHALL BE COMPOST AMENDED AND SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ONSITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS. 24. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL. 25. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH EXPORT AND IMPORT OF SOIL AND ROCK MATERIALS ARE REQUIRED. 26. SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS SHOWN. 27. FINISHED GRADE SHALL SLOPE AWAY FROM BUILDING WALLS AT MINIMUM 59 SLOPE FOR A MINIMUM DISTANCE OF 10 FEET. 28. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING AS NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS, STREETS, WALKWAYS, UTILITIES AND OTHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST LOSS OF GROUND OR CAVING EMBANKMENTS. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF SHORING AND BRACING, AS REQUIRED. 29. CONTRACTOR SHALL NOTIFY OVWSD & SOUNTY COUNTY FIRE & SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR ALL WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET CLOSURES OR OTHER ACCESS RESTRICTIONS. CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST OBTAINING WRITTEN APPROVAL FROM THE FIRE MARSHAL. 30. COORDINATE AND ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY RELOCATIONS AND/OR SERVICE INTERRUPTIONS WITH THE AFFECTED OWNERS AND APPROPRIATE UTILITY COMPANIES. CONNECTIONS TO EXISTING UTILITIES SHALL BE MADE ONLY WITH ADVANCE WRITTEN APPROVAL OF THE AUTHORITIES GOVERNING SAID UTILI TIES. 31. ALL UTILITIES SHALL BE PLACED UNDERGROUND. 32. EXISTING UTILITY LINES /N SERVICE WHICH ARE DAMAGED DUE TO CONSTRUCTION WORK SHALL BE REPAIRED AT CONTRACTORS EXPENSE AND INSPECTED AND ACCEPTED BY CITY OF EDMONDS AND OWNERS REPRESENTATIVE PRIOR TO BACKF/LL/NG. 33. NEW UTILITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS ARE INDICATED, LOCATIONS MAY BE SCALED FROM DRAWINGS. FIELD ADJUSTMENTS SHALL BE APPROVED BY OWNER'S REPRESEN TA TI VE AND Cl TY. 34. FIELD STAKE ALL UTILITY STUBS AT THE PROPERTY LINE. 35. TRENCH BACKFILL OF UTILITIES LOCATED WITHIN THE CITY RIGHT-OF-WAY SHALL BE COMPACTED TO 959: COMPACTION TEST REPORTS SHALL BE PROVIDED TO THE CITY PRIOR TO PAVING. 36. WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR LESS, PLACE POLYETHYLENE PLASTIC FOAM AS A CUSHION BETWEEN THE UTILITIES. 37. SEE MECHANICAL DRAWINGS (WHERE APPLICABLE) FOR CONTINUATION OF SITE UTILITIES WITHIN THE BUILDING. 38. SEE ELECTRICAL DRAWINGS (WHERE APPLICABLE) FOR EXTERIOR ELECTRICAL WORK. 39. SEE LANDSCAPE DRAWINGS (WHERE APPLICABLE) FOR SITE IRRIGATION SYSTEM. 40. PIPE MATERIAL AND SIGNAGE SUBMITTALS SHALL BE PROVIDED TO CITY ENGINEERING DIVISION FOR APPROVAL PRIOR TO INSTALLATION. RESUB j May 08 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Know what"s beloW. Call before you dig. BLD2023-0071 APPROVED FOR CONSTRUCTION CITY OF EDMONDS 6/7/2023 DATE: BY �JC' � CITY ENGINEERING DIVISION RAM ENGINEERING, INC. Civil Engineering / Land Planning 19109 36TH AVE W, SUITE 100 LYNNWOOD, WA 98036 PHONE: (425) 678-6960 WWW.RAMENGINEERINGINC.COM 2 Z o � U N U O W Z o 0 c 0 U W W Ln C N O Lo LO Z Itz 'Z y O04 v Q �v O LU zLo W � O 2 cq�� W WQ W � 4 m d 38508 CL! ISTEg�'9 \SSIO>\re 1.�� ROB L. LONG, PE DRA WN B K MIKE MORRIS ISSUE DA TE.• SCALE.• 51512J AS NOTED JOB NOI 20-024 SHEET.• GN-01 SHT 3 OF 3