Loading...
APPROVED ENG RESUB 1-BLD2023-0071+TIA+5.6.2023_3.03.36_PM+3529330APPENDIX A Page 1 of 2 RESUB Transportation Impact Analysis W o r ks h e et BLD2023-0071 PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: 23902 91 st PI W Edmonds Wa 98026 Owner/Applicant 17921 Bothell -Everett Hwy Suite 100 Name 17921 Bothell -Everett Hwy Suite 100 Street/Mailing Address i -8444 State Zip Telephone: (425) 438-8444 Applicant Contact Person: Jeff Wegener Name Street/Mailing Address City State Zip Telephone: Jeff Wegener Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): RAM Engineering, Inc. Rob Long, PE Firm Name Contact Name Telephone: (425) 678-6960 1. PROJECT DESCRIPTION E-mail: RobL@RAMengineeringlnc.com a. Location - Street address: 23902 91 st PI W Edmonds Wa 98026 (Attach a vicinity map and site plan.) b. Specify existing land use: Single Family Residential c. Specify proposed type and size of development: Single Family Residential, One Lot/SFR (# of residential units and/or square footage of building) d. Date construction will begin and be completed: Start February 2023 / End October 2023 e. Define proposed access locations: Access driveway from new plat road 91 st PI W. APPENDIX A Page 2 of 2 2 f. Define proposed sight distance at site egress locations: Access driveway from new plat road 91st PI W (low volume residential road), adequate access sight distance. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. ® CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. ITE Land Use Category New Use I SFR, ITE 210 Prior Use I SFR, ITE 210 Units in Per Unit square feet, Fee Rate # of dwelling, X X vfp, etc. 1 $ 6,249.14 $ 6,249.14 1 Fee i New Use Fee: $ 6,249.14 - PXrior Use Fee: $ 6,249.14 = $ 0.00 ❑ NEW DEVELOPMENT Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use $ X ❑ OTHER MITIGATION FEE RECOMMENDATION: INDEPENDENT FEE CALCULATION: $240.00 + consultant fee $ TOTAL TRANSPORTATION IMPACT FEE $ ENGINEERING DIVISION ---- -- - DTED City of Edmonds, Engineering Division Appr Date 16/07/2022 ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.