Project: Clint Jewelers New Store Tenant Improvement
100 5' Ave N
Edmonds, WA 98020
Subject: Engineering Justifications and Calculations for the Storefront Canopy and Awning
Cc: Andy Cline, Business Owner
Curtis McGuire, Project Architect
To Whom It May Concern:
DHS Engineers, PLLC has been retained by Cline Family to assist on various structural engineering tasks
associated with the above -reference project. This memo is to provide necessary justifications via
engineering calculations for the new store front canopy and the expanded existing awning system on each
side of the canopy.
The Store Front Canopy and Its Supporting System
The store front canopy itself is a design -built item provided by the project General Contractor's supplier
that is engineered by others. The canopy itself is constructed with aluminum. The supplier was informed
that proper isolations between the aluminum and steel should take place between the canopy and the
supporting system DHS engineered on the building side to receive it. We were assured that the supplier is
aware and is very familiar with these types of conditions on all the projects they have been involved.
DHS was provided the following design information for the canopy including a store signage that will be
attached on the front of the canopy:
1. The canopy is 6ft deep and 1 Oft wide,
2. The canopy weighs 250 pounds.
3. The store signage weighs between 75 to 100 pounds.
The design snow load is 25 psf and snow drift is not anticipated if 25 psf full snow load is used for the
design. The loading information is shown in the attached canopy detail in blue. Based on the above
loading information, the reaction forces can be calculated and are shown in the attached canopy detail
with red arrows. These reaction forces are then resolved via capacities provided by various structural
components that are part of the framing detail shown in red/yellow clouds. The minimum required
RESUB
Oct 18 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
capacities are shown in dashed red arrows. It is obvious that more than adequate capacities were provided
based on the attached product data.
Awning and Its Supporting System
The existing awning framing on the west has been reused after the canvas is reskinned and then
reinstalled per the updated attached detail. The identical framing has been used for the new section on the
south. The previously city approved shop drawings are attached. The code defined the loads have not
changed since the last installation in early 2011 on the same building including the wind force.
DHS Engineers, PLLC
Dihong Shao, S.E.
Principal
Attachments:
1. Marked up Canopy and Awning Detail of Sheet No.3 of the Permit Set dated 6.21.23.
2. Awning Framing Shop Drawings that were previously submitted and approved by the city of
Edmonds.
3. Wind Force Calculations
4. Various Product Cutsheets from Simpson
5. AWC Lag Screw Capacity Tables
PC NOTES:
#1- REPLACED THE ORIGINAL SHEET IN PLAN SET
#2- KEPT ATTACHED TO THIS LETTER
#3-SEPERATE FILE
#4 SEPERATE FILE
#5 SEPERATE FILE
Awning frame material:
1 it x 2" x , i 25" aluminum tube
"Except as noted
Elio
RES U B
Oct 18 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT Typical in detail
awning
1"X Px.125"
100 5th Ave NJ I W5
24' 9" & 24' 8"
frame sections
Adjoining
frame
James Langston
F 611
C r.v a, CiiI. i1' : c1;vIC'I ;S CTR.
RES U B
Oct 18 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
s
P
100 5th Ave N.
Awning installation
Sidewalk and parking
closure area detail
Traffic control signs will
be placed 72 hrs prior
to comencement of work
aP "EOVEEC t AS NRING
aOTED
By
4.
L.
Da#
Bell St.
Sidewalk Closed sion
during awning frame
installation only.
aqk4
-Fo lzt vu#aWd if
needR.d
Y Jam..
t�
JAN 07 2010
BUILDING DEPARrWNT
CITY OF EDMONDS
6th Ave N.
Advtnced
'I515' Herring
3Irof Synems
IIN
cones at •.
shown
tu•5t�t"��a:
Sidewalk closed sign
during corner awning
frame installation only.
Relocate to corner of
5th and Main after
corner frame has been
secured to wall.
Sidewalk
Inca•
t
t
t
I
1
1
1
NAMA'S
Candy
1
Store
1
1 Garden
102•]/2
1 Gear
102
* 5th Ave N_
N4 PARKING AFTER 6AM
sig16 Wfill be posted for awning
frameilnstallation days only.
..'.,CITY Cd"%-Pv
Crosswalk
r
& .00
Sound i4ain St.
Styles
tMI
Sidewalk Closed sign
during awning frame
installation only.
See note above.
RES U B
Oct 18 2023
CITY OF E T ONDS
SERVICES
Edmonds, T l 1
#5 DEVELOPMENT SERVICES
DEPARTMENT
Sound Styles Entrance Awning Plan View
n r"II"
":.:
s' 71,
18' 1-3/8"
psi=VEi.OFMENT SERVICES C;
C:IT! np 1:11MONDS
WS Magic .lames Langston . ■.;
Awning frame material:
1" x 2" x .125" aluminum tube
"Except as noted
#1
41311
RAKC,
5"
RES U B
Oct 18 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Advanced Hearing Systems
awning detail
NTS I Magic I James LangsWn W=• t ;
DA�'E
116"
r � n ,:. ?Ct
��U J Zvi
'VELOPMENT SERVICES CT, ,
-%M! nI`, F-0mot4oS
RES U B
41 311
Adjoining
frame this end
3' 1 0'
61011
;1 Tt
E Dl
'
I)fVEl.OPMENT SERVICES i:fl--,.
2' 7"
CITY OF EflRnONDS
NITS Magic James Langston I . • a • •
OM
RES U B
Oct 18 2023
t CITY OF EDMONDS
�- DEVELOPMENT SERVICES
DEPARTMENT
100 5th Ave N.
Edmonds, OVA
Site Plan
ti
r
r
ti
106' 4" r
r �
t r
r
� 4 �
t r
r �
� � 4
HEARING SYSTEMS 4 NAMA'S CANDY STORE r GARDEN GEAR r
r �
r r
r r �
� r r
� r r
� � L
� r 1
r 113' I1-1/2" r
45' 4"
lO' awnin �
Awning fi=t locatcs to ccnttr
of T pillars at r door/window =3
5th Ave N.
CITY OF EDMONDS
rBUI WG DEPARTMENT
WORK
ADDRESS G1�
OWNER �[1
B1-_ .OFFICIAL,
2PE7RM1T,,HUMBER
Q
90'
SOUND STYLES
10' sidewalk
1' �" awning
arowtd eaacr
NTS Magic James Langston • • MINSITA
A
5;t'
s
p
;i 4 8 C E I V 'E D-r
JEC 2 9 17-00
FiEVELOPME,'4T S'-48VIC=:7' f T :.
Awning #1
RESUB
Oct 18 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
ADVANCED
HEARING SYSTEMS
N N
10'-0"
Awning #2
ROUGH Graphics Layout
NOT FOR PRODUCTION
0
L NAMNS CANDY STORE #2
Awning #3 24 9
111
GARDEN GEAR
Awning #5
24'_8"
SOvX(D STTL #51
!
18"
#3 1 ia°
18"
W cx f*%v v 114 11 Y V
•James LangstonAPPROVED BY
ORTH G STREET TACOMA, WA CA 403
(253 ) 627-4128 DAZE
FAX (253 ) 572-7781
#5
21711
2' TT
450
RES U B
Oct 18 2023
CITY OF EDMONDS DEVELOPMENT SERVICES
DEPARTMENT Edmonds, WA
A 1
Sound Styles Entrance Awning Plan View
+.33" typ.
10' 11-3/8" Wall
18' 1-3/8"
NTS
150
all
11 Olt
2' 9-1 /2"
2' 9-1 /2"
5' 7"
2' 3-1/2" 2' 3-1/2"
L€_� ? s
vEVELE PNIENT SERVICES C i F..
Magic James Langston ■ M M
End of
new
awning
9' 11"
RES U B
Oct 18 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
4f 310
Open ends
�f 6ff
6! Of'
NAMNS Candy Store
24' 9"
100 5th Ave N.
Edmonds, WA
b8' 7-
Garden Gear
NT5
24' 8"
Magic
Awning
cont nucs
Sound Styles
19' 2-112"
R C
D"EC 2 9 2�
�,,E_VELOPMENT SERVICES
CITY nE FcMOR DS
James Langston I As
I I Sm 31
RES U B
Oct 18 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
100 5th Ave N.
Edmonds, WA
Sound Styles Entrance Awning
+-101 8°
clearance
NTS Magic James Langston ...
DE-C 2 9 'TiO
DEVELOPMENT SERVICES GTii,
CITY Or, EDMONDS
RES U B
100 5th Ave .",EDMONDS
8 2023
CIT
Edmonds, wAE .RTMENPMENT RVICES
Awning profile and
clearance specification
Top of cap
clashing
20" area of
flashing 34" tall ;brick @t2 Sound Styles entrance
with purple ��� projects +- 1-1/4" from wall face
and teal
12" vents
21511
8" purple stripe
Top of window frames
91311
Open ends
Mount +- 5" above windows
6f 011
11611
+-9' 3" at left end of awning
Advanced Hearing Systems
Sidewalk
UB&
12"
Roof
joist
22"
OC .
314"
T&c
42 1/4it 51�
fastener location 25-Vz" 16" OC
3/4" gap
2 x 6 16" OC
Latho/plastcr,'/:" particleboard %a" shectrock
3"
Ceiling of entry AL
1 r Lathe &
:plaster
Window
frames ai
columns
10"
+- 20" purpletteal
+- 34" area
to top of flashing
along Sound
Styles entry
projects approx.
+-- 2-3"
1" x 2" x .125" aluminum tube
borizontal top frame member.
Cradle into 3/I6" x 1" zinc
plated steel mounting braekots
32" CC max. Secure with 318"
x 12" zinc plated steel lag
46.
screw into 2 x 6 and 2 x 12.
Attach bracket to frame with 1
each #10 x 3/4" Tek screw,
frame
(—
along
4-112" brick
wall
1" x 2" x.125" aluminum tube
horizontal bottom name member.
Drill thzu 32" OC max. Secure
with 3/8" x 10" zinc plated steel
lag screw into 4 x 12 header.
Top of 8" stripe
$"
5 it
3/8" x 5" x 5" steel
IR Cam-" C: Er I V f-.:r eD
DEC 2 9 4L t� i
DEVELOPMENT SERVICES CTH.
CITY OF E€JMONDS
15' 3
PAQ
RES U B
Oct 18 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
7
1 O" '71 'f 111
FAX (253) 572-7791 -
451411
10101,
-------------------------------------
91 3,1
21 011
�. m
41311
New awning location
stri
DATE
{ End of
new
awning
911111,