Loading...
REVIEWED RESUB1 BLD2023-1075+DHA ENG INFO+10.18.2023_11.47.24_AM+3847685RESUE Oct 18 2M, CITY OF EDMONDS DEVELOPMENT SERVIC DEPARTMENT =:j1byze)R ]Ito]5& October 8, 2023 Cline Jewelers 105 5 h Ave S Edmonds, WA 98 REVIEWED BY CITY OF EDMONDS Project: Clint Jewelers New Store Tenant Improvement 100 5' Ave N Edmonds, WA 98020 Subject: Engineering Justifications and Calculations for the Storefront Canopy and Awning Cc: Andy Cline, Business Owner Curtis McGuire, Project Architect To Whom It May Concern: DHS Engineers, PLLC has been retained by Cline Family to assist on various structural engineering tasks associated with the above -reference project. This memo is to provide necessary justifications via engineering calculations for the new store front canopy and the expanded existing awning system on each side of the canopy. The Store Front Canopy and Its Supporting System The store front canopy itself is a design -built item provided by the project General Contractor's supplier that is engineered by others. The canopy itself is constructed with aluminum. The supplier was informed that proper isolations between the aluminum and steel should take place between the canopy and the supporting system DHS engineered on the building side to receive it. We were assured that the supplier is aware and is very familiar with these types of conditions on all the projects they have been involved. DHS was provided the following design information for the canopy including a store signage that will be attached on the front of the canopy: 1. The canopy is 6ft deep and 1 Oft wide, 2. The canopy weighs 250 pounds. 3. The store signage weighs between 75 to 100 pounds. The design snow load is 25 psf and snow drift is not anticipated if 25 psf full snow load is used for the design. The loading information is shown in the attached canopy detail in blue. Based on the above loading information, the reaction forces can be calculated and are shown in the attached canopy detail with red arrows. These reaction forces are then resolved via capacities provided by various structural components that are part of the framing detail shown in red/yellow clouds. The minimum required RESUB Oct 18 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT capacities are shown in dashed red arrows. It is obvious that more than adequate capacities were provided based on the attached product data. Awning and Its Supporting System The existing awning framing on the west has been reused after the canvas is reskinned and then reinstalled per the updated attached detail. The identical framing has been used for the new section on the south. The previously city approved shop drawings are attached. The code defined the loads have not changed since the last installation in early 2011 on the same building including the wind force. DHS Engineers, PLLC Dihong Shao, S.E. Principal Attachments: 1. Marked up Canopy and Awning Detail of Sheet No.3 of the Permit Set dated 6.21.23. 2. Awning Framing Shop Drawings that were previously submitted and approved by the city of Edmonds. 3. Wind Force Calculations 4. Various Product Cutsheets from Simpson 5. AWC Lag Screw Capacity Tables PC NOTES: #1- REPLACED THE ORIGINAL SHEET IN PLAN SET #2- KEPT ATTACHED TO THIS LETTER #3-SEPERATE FILE #4 SEPERATE FILE #5 SEPERATE FILE Awning frame material: 1 it x 2" x , i 25" aluminum tube "Except as noted Elio RES U B Oct 18 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Typical in detail awning 1"X Px.125" 100 5th Ave NJ I W5 24' 9" & 24' 8" frame sections Adjoining frame James Langston F 611 C r.v a, CiiI. i1' : c1;vIC'I ;S CTR. RES U B Oct 18 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT s P 100 5th Ave N. Awning installation Sidewalk and parking closure area detail Traffic control signs will be placed 72 hrs prior to comencement of work aP "EOVEEC t AS NRING aOTED By 4. L. Da# Bell St. Sidewalk Closed sion during awning frame installation only. aqk4 -Fo lzt vu#aWd if needR.d Y Jam.. t� JAN 07 2010 BUILDING DEPARrWNT CITY OF EDMONDS 6th Ave N. Advtnced 'I515' Herring 3Irof Synems IIN cones at •. shown tu•5t�t"��a: Sidewalk closed sign during corner awning frame installation only. Relocate to corner of 5th and Main after corner frame has been secured to wall. Sidewalk Inca• t t t I 1 1 1 NAMA'S Candy 1 Store 1 1 Garden 102•]/2 1 Gear 102 * 5th Ave N_ N4 PARKING AFTER 6AM sig16 Wfill be posted for awning frameilnstallation days only. ..'.,CITY Cd"%-Pv Crosswalk r & .00 Sound i4ain St. Styles tMI Sidewalk Closed sign during awning frame installation only. See note above. RES U B Oct 18 2023 CITY OF E T ONDS SERVICES Edmonds, T l 1 #5 DEVELOPMENT SERVICES DEPARTMENT Sound Styles Entrance Awning Plan View n r"II" ":.: s' 71, 18' 1-3/8" psi=VEi.OFMENT SERVICES C; C:IT! np 1:11MONDS WS Magic .lames Langston . ■.; Awning frame material: 1" x 2" x .125" aluminum tube "Except as noted #1 41311 RAKC, 5" RES U B Oct 18 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Advanced Hearing Systems awning detail NTS I Magic I James LangsWn W=• t ; DA�'E 116" r � n ,:. ?Ct ��U J Zvi 'VELOPMENT SERVICES CT, , -%M! nI`, F-0mot4oS RES U B 41 311 Adjoining frame this end 3' 1 0' 61011 ;1 Tt E Dl ' I)fVEl.OPMENT SERVICES i:fl--,. 2' 7" CITY OF EflRnONDS NITS Magic James Langston I . • a • • OM RES U B Oct 18 2023 t CITY OF EDMONDS �- DEVELOPMENT SERVICES DEPARTMENT 100 5th Ave N. Edmonds, OVA Site Plan ti r r ti 106' 4" r r � t r r � 4 � t r r � � � 4 HEARING SYSTEMS 4 NAMA'S CANDY STORE r GARDEN GEAR r r � r r r r � � r r � r r � � L � r 1 r 113' I1-1/2" r 45' 4" lO' awnin � Awning fi=t locatcs to ccnttr of T pillars at r door/window =3 5th Ave N. CITY OF EDMONDS rBUI WG DEPARTMENT WORK ADDRESS G1� OWNER �[1 B1-_ .OFFICIAL, 2PE7RM1T,,HUMBER Q 90' SOUND STYLES 10' sidewalk 1' �" awning arowtd eaacr NTS Magic James Langston • • MINSITA A 5;t' s p ;i 4 8 C E I V 'E D-r JEC 2 9 17-00 FiEVELOPME,'4T S'-48VIC=:7' f T :. Awning #1 RESUB Oct 18 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ADVANCED HEARING SYSTEMS N N 10'-0" Awning #2 ROUGH Graphics Layout NOT FOR PRODUCTION 0 L NAMNS CANDY STORE #2 Awning #3 24 9 111 GARDEN GEAR Awning #5 24'_8" SOvX(D STTL #51 ! 18" #3 1 ia° 18" W cx f*%v v 114 11 Y V •James LangstonAPPROVED BY ORTH G STREET TACOMA, WA CA 403 (253 ) 627-4128 DAZE FAX (253 ) 572-7781 #5 21711 2' TT 450 RES U B Oct 18 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Edmonds, WA A 1 Sound Styles Entrance Awning Plan View +.33" typ. 10' 11-3/8" Wall 18' 1-3/8" NTS 150 all 11 Olt 2' 9-1 /2" 2' 9-1 /2" 5' 7" 2' 3-1/2" 2' 3-1/2" L€_� ? s vEVELE PNIENT SERVICES C i F.. Magic James Langston ■ M M End of new awning 9' 11" RES U B Oct 18 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 4f 310 Open ends �f 6ff 6! Of' NAMNS Candy Store 24' 9" 100 5th Ave N. Edmonds, WA b8' 7- Garden Gear NT5 24' 8" Magic Awning cont nucs Sound Styles 19' 2-112" R C D"EC 2 9 2� �,,E_VELOPMENT SERVICES CITY nE FcMOR DS James Langston I As I I Sm 31 RES U B Oct 18 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 100 5th Ave N. Edmonds, WA Sound Styles Entrance Awning +-101 8° clearance NTS Magic James Langston ... DE-C 2 9 'TiO DEVELOPMENT SERVICES GTii, CITY Or, EDMONDS RES U B 100 5th Ave .",EDMONDS 8 2023 CIT Edmonds, wAE .RTMENPMENT RVICES Awning profile and clearance specification Top of cap clashing 20" area of flashing 34" tall ;brick @t2 Sound Styles entrance with purple ��� projects +- 1-1/4" from wall face and teal 12" vents 21511 8" purple stripe Top of window frames 91311 Open ends Mount +- 5" above windows 6f 011 11611 +-9' 3" at left end of awning Advanced Hearing Systems Sidewalk UB& 12" Roof joist 22" OC . 314" T&c 42 1/4it 51� fastener location 25-Vz" 16" OC 3/4" gap 2 x 6 16" OC Latho/plastcr,'/:" particleboard %a" shectrock 3" Ceiling of entry AL 1 r Lathe & :plaster Window frames ai columns 10" +- 20" purpletteal +- 34" area to top of flashing along Sound Styles entry projects approx. +-- 2-3" 1" x 2" x .125" aluminum tube borizontal top frame member. Cradle into 3/I6" x 1" zinc plated steel mounting braekots 32" CC max. Secure with 318" x 12" zinc plated steel lag 46. screw into 2 x 6 and 2 x 12. Attach bracket to frame with 1 each #10 x 3/4" Tek screw, frame (— along 4-112" brick wall 1" x 2" x.125" aluminum tube horizontal bottom name member. Drill thzu 32" OC max. Secure with 3/8" x 10" zinc plated steel lag screw into 4 x 12 header. Top of 8" stripe $" 5 it 3/8" x 5" x 5" steel IR Cam-" C: Er I V f-.:r eD DEC 2 9 4L t� i DEVELOPMENT SERVICES CTH. CITY OF E€JMONDS 15' 3 PAQ RES U B Oct 18 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 7 1 O" '71 'f 111 FAX (253) 572-7791 - 451411 10101, ------------------------------------- 91 3,1 21 011 �. m 41311 New awning location stri DATE { End of new awning 911111,