Loading...
Building PermitType: RETAINING WALL Subtype: RESIDENTIAL RW I Status: ISSUED Parcel No: 00679200000200 Site Address: 7824 175TH ST SW EDMONDS,WA 98026-5026 Applied: 11/8/2023 Subdivision: 005944, BLA AFN 200605095004, 006792 Lot: 0 Issued: 4/22/2024 Fire Sprinklers: Lot Area: 11992 Zoning: IRS-8 Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 4/22/2026 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: JOK Scope of Work: HAMBY- RETAINING WALL PARTIAL DEMO/REBUILD- COD 2022-0120 WA State Contractor L & I #: TERRE**791CR CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT ROBIN MICHEL 3617 BELLS BEACH RD, LANGLEY (206)930-2445 RWMICHELI@ME.COM WA 98260 CONTACT MICHEL DESIGN 3617 BELLS BEACH RD, LANGLEY (206)930-2445 rwmichell@me.com WA 98260 CONTRACTOR TERREWORKS LANDSCAPING 834 INDUSTRY DR, TUKWILA (206)909-3693 KRISITIN@TERREWORKS.COM WA 98188 OWNER MICHAEL E HAMBY 7824 175TH ST SW, EDMONDS (206)660-6810 WA 98026 •' • DESCRIPTION 7BLDPERMITIT ACCOUNT AMOUNT PAID PAID DATE RECEIPT # BASE FEE 001.000.322.10.000.00 $100.00 $100.00 11/9/23 R32628 CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 11/9/23 R32628 PERMIT ENG - INSPECTIONS 001.000.345.83.400.00 $378.00 $378.00 4/22/24 R36513 RETAINING WALL - RES - PER WALL 001.000.345.83.000.00 $656.00 $656.00 4/22/24 R36513 STATE BUILDING CODE SURCHARGE 001.000.237.150 $6.50 $6.50 4/22/24 R36513 - RES TOTALS: $1,185.50 $1,185.50 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Monday, April 22, 2024 10:08:48 AM 1 of 3 RETAINING WALL Permit City of • • • - 98020 1 www.edmondswa.gov 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ESC REQUIREMENTS FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD INFORMATION REQUIREMENTS. Approval of this foundation design is conditional subject to inspection of existing site soil FOR conditions. Retaining walls must be designed and constructed to resist the lateral FOUNDATION BEARING INFORMATION pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. INSP PRIOR TO BACKFILL FOR Call for all required inspections. All work shall be inspected prior to backfill. NFORMATION INSPECTIONS FOR SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INFORMATION www.mybuildingpermit.com Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. Printed: Monday, April 22, 2024 10:08:48 AM 2 of 3 `` RETAINING WALL Permit � ' City of Edmonds PERMIT NUM _ 121 5th Ave N, Edmonds WA 98020 ALBLD2023-1421 7w-www.edmondswa.gov / 425.771.0220 INSPECTIONS INSPECTIONTYPE - Schedule Online at https://inspection.mybuildingpermit.com Ad B-1 SETBACKS DEMO A B-2 FOOTINGS B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" A-1 TESC AND MOBILIZE RET WALL DRAIN OUTFALL X-2 ENGINEERING FINAL Printed: Monday, April 22, 2024 10:08:48 AM 3 of 3