Building PermitType: RETAINING WALL Subtype: RESIDENTIAL RW I Status: ISSUED
Parcel No: 00679200000200 Site Address: 7824 175TH ST SW EDMONDS,WA 98026-5026 Applied: 11/8/2023
Subdivision: 005944, BLA AFN 200605095004, 006792 Lot: 0 Issued: 4/22/2024
Fire Sprinklers: Lot Area: 11992 Zoning: IRS-8 Final:
Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 4/22/2026
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: JOK
Scope of Work: HAMBY- RETAINING WALL PARTIAL DEMO/REBUILD- COD 2022-0120
WA State Contractor L & I #: TERRE**791CR
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
ROBIN MICHEL
3617 BELLS BEACH RD, LANGLEY
(206)930-2445
RWMICHELI@ME.COM
WA 98260
CONTACT
MICHEL DESIGN
3617 BELLS BEACH RD, LANGLEY
(206)930-2445
rwmichell@me.com
WA 98260
CONTRACTOR
TERREWORKS LANDSCAPING
834 INDUSTRY DR, TUKWILA
(206)909-3693
KRISITIN@TERREWORKS.COM
WA 98188
OWNER
MICHAEL E HAMBY
7824 175TH ST SW, EDMONDS
(206)660-6810
WA 98026
•' •
DESCRIPTION
7BLDPERMITIT
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
BASE FEE
001.000.322.10.000.00
$100.00
$100.00
11/9/23
R32628
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
11/9/23
R32628
PERMIT
ENG - INSPECTIONS
001.000.345.83.400.00
$378.00
$378.00
4/22/24
R36513
RETAINING WALL - RES - PER WALL
001.000.345.83.000.00
$656.00
$656.00
4/22/24
R36513
STATE BUILDING CODE SURCHARGE
001.000.237.150
$6.50
$6.50
4/22/24
R36513
- RES
TOTALS: $1,185.50
$1,185.50
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Monday, April 22, 2024 10:08:48 AM 1 of 3
RETAINING WALL Permit
City of • • • -
98020 1
www.edmondswa.gov
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
ESC REQUIREMENTS
FOR
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
INFORMATION
REQUIREMENTS.
Approval of this foundation design is conditional subject to inspection of existing site soil
FOR
conditions. Retaining walls must be designed and constructed to resist the lateral
FOUNDATION BEARING
INFORMATION
pressure of the retained material. Provisions must be made for the control and drainage
of surface water around buildings.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
INSP PRIOR TO BACKFILL
FOR
Call for all required inspections. All work shall be inspected prior to backfill.
NFORMATION
INSPECTIONS
FOR
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INFORMATION
www.mybuildingpermit.com
Sound or noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding
SOUND AND NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites and activities must comply with the noise limits of Chapter 5.30, unless a variance
has been granted pursuant to ECC 5.30.120.
FOR
All utilities shall be located prior to any excavation. New locates shall be called for if at
UTILITY LOCATES
INFORMATION
time of excavation, original locates are no longer identifiable.
Printed: Monday, April 22, 2024 10:08:48 AM 2 of 3
`` RETAINING WALL Permit
� '
City of Edmonds PERMIT NUM
_ 121 5th Ave N, Edmonds WA 98020 ALBLD2023-1421
7w-www.edmondswa.gov / 425.771.0220
INSPECTIONS
INSPECTIONTYPE
- Schedule
Online
at https://inspection.mybuildingpermit.com
Ad
B-1 SETBACKS
DEMO A
B-2 FOOTINGS
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
A-1 TESC AND MOBILIZE
RET WALL DRAIN
OUTFALL
X-2 ENGINEERING FINAL
Printed: Monday, April 22, 2024 10:08:48 AM 3 of 3