Loading...
Building Permit_1Type: PLUMBING Subtype: COMMERCIAL PLUMBING I Status: ISSUED Parcel No: 00558800002500 Site Address: 20904 82ND AVE W UNIT 32 EDMONDS,WA 98026- Applied: 4/10/2024 7027 Subdivision: 003736, 005588 Lot: 0 Issued: 4/12/2024 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 4/12/2026 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: PLUMBING -REPLACE HOT WATER WA State Contractor L & I #: FASTWWH79901 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT ANTHONY DANESE 11715 N CREEK PKWY S #C106, (425)636-7054 PERMITS@FASTWATERHEATER.COM BOTHELL WA 98011 11715 N CREEK PKWY S #C106, CONTACT FAST WATER HEATER (425)636-7054 permits@fastwaterheater.com BOTHELL WA 98011 CONTRACTOR FAST WATER HEATER CO 11715 N CREEK PARKWAY #C- (425)636-7054 permits@fastwaterheater.com 106, BOTHELL WA 98011 20904 82ND AVE W, EDMONDS OWNER POTESTIVO DEBERA D WA 98026-7027 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 4/12/24 R36297 PERMIT PLUMBING BASE FEE 001.000.322.10.000.00 $57.00 $57.00 4/12/24 R36297 WATER HEATER - INC EXPANSION 001.000.345.83.000.00 $17.00 $17.00 4/12/24 R36297 TANK TOTALS: $119.00 $119.00 7 CONDITION TYPE STATUS NOTES Printed: Wednesday, April 24, 2024 10:47:51 AM 1 of 3 PLUMBING Permit City of • • • - •:� i 1 1 � www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Installation, use and maintenance of equipment and components shall be per EQUIPMENT USAGE FOR manufacturer's specifications, installation instructions, and applicable state codes. INFORMATION provide manufacture's installation instructions on site for Building Inspector. FOR In addition to the required pressure relief valve an approved listed expansion tank shall EXPANSION TANK INFORMATION be installed on all hot water tanks per UPC 608. GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. NNSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES X-0 PLUMBING FINAL" 4/18/2024 CORRECTION please call 30 min ahead 12:00:00 AM REQUIRED X-0 PLUMBING FINAL" 4/18/2024 CORRECTION Not ready. No one on site. Please reschedule through 12:00:00 AM REQUIRED mybuildingpermit.com. To avoid a reinspection fee someone needs to be on site to allow access for inspector. B-3 PLUMB ROUGH IN 4/18/2024 CORRECTION please call 30 min ahead 12:00:00 AM REQUIRED B-3 PLUMB ROUGH IN 4/18/2024 CORRECTION Not ready reschedule through mybuildingpermit.com. 12:00:00 AM REQUIRED To avoid a reinspection fee please have someone on site to perform inspection B-3 PLUMB ROUGH IN X-0 PLUMBING FINAL" we have 3 tanks, 2 at woodridge and 1 at willowbrook, are they all on the 1 permit? Printed: Wednesday, April 24, 2024 10:47:51 AM 2 of 3 Printed: Wednesday, April 24, 2024 10:47:51 AM 3 of 3