Loading...
REVIEWED BLD2023-0487+Structural_Analysis_or_Calculations+5.18.2023_8.08.13_PM+3555609REVIEWED BY CITY OF EDMONDS May 16, 2023 Shaun and Lisa Harris 8025 Cyrus PI Edmonds, WA 98026 Sent via: Email Subject: Harris Residence 8025 Cyrus PI Remodel Dear Shaun, A K E V I E W TRUCTURAL E R I N G RECEIVED May 19 2023 DEVELOPM-SERVICES DEPARTMENT BLD2023-0487 On Monday, May 15th I inspected the residence with you and Lisa at the above address. At your request I have reviewed the proposed renovations and associated documentation. This letter is intended to provide direction for the structural and non-structural modifications you have proposed. 2nd Floor modifications: The roof trusses over the 2nd floor span the full width of the house. This indicates that the trusses were designed without any interior supports and all of the 2nd floor walls are non-structural partition walls. Therefore all of the proposed wall modifications and additions will not impact the structure of the house. Main floor modifications: All of the proposed main floor modifications affect only non-structural partition walls and do not require any engineering. The proposed partition walls may be removed and new partition walls installed without impacting the structure of the house. Basement Modifications: The basement modifications propose removing the hallway walls to create an open space. These walls were framed with a 6x12 beam spanning between posts approximately 10 feet on center. The beam supports the 2x10 floor joists of the main floor. The space under the beams was filled in with stud wall framing. Based on my calculations the existing beam can span between columns under its current configuration and does not need the support of the wall framing. Therefore the wall framing may be removed provided the 6x12 beam and the support posts are kept in place. The hallway wall of the existing laundry room may also be removed as the floor joists are spanning from the exterior walls to the support beams and do not rely on this wall for support. Note that during the inspection another beam in the existing rec room spans from the fireplace to the stairwell wall. It is supported by a post at the stairwell wall. The beam has twisted slightly and is noticeably out of plumb. I recommend that during the remodel activities this beam be straightened and fastened to the post with Timberlok screws. I also recommend that the floor joists running over top of the beam be toe nailed to the beam or connected with a Simpson A34 bracket. This will provide some lateral bracing to the top of the beam and prevent it from rotating in the future. 05/16/23 11:45 PM Shaun and Lisa Harris May 16, 2023 Page 2 Please feel free to contact me if you would like to discuss any of these items in more detail or if you have any questions. You can reach me by phone at (206) 914-9536, or by email at LakeviewSE@outlook.com. Sincerely, Jon Conner, PE, SE Lakeview Structural Engineering Attachments: Beam calculations 023 05/16/23 11:45 PM Shaun and Lisa Harris Beam out of plumb May 16, 2023 Page 3 05/16/23 11:45 PM Harris Residence Structural Calculations TRUCTU RAL � G Harris Residence: - Calculate existing beam capacity and check that it can span between existing posts Ld :=10 w f:= 40 Calculate Basement beam capacity wrbl (Ld+wf) • \ 26 =650 lrbl :=10 2 12 • wrbl - lrbl Mrbl := = 97500 8 wrbl * lrbl Vrbl := = 3250 2 lrbl • 12 Orbl := = 0.25 480 Mrbl S,bl := =108 900 5 • wrbl -1rb14 •1728 Irby= = 325 384.1.8.106 • '�Arbl Floor dead load (psf) Floor live load (psf) Uniform load (Ibs) Total length (ft) Max moment (in-Ibs) Max beam shear (Ibs) Limit deflections (in) Section modulus required for stresses (in A3) Moment of inertia required for deflections (in A4) Existing 6xl2 beam OK for the 10 ft span between posts (I = 697 inA4, S = 121 inA3)