Loading...
APPROVED ENG2024-0141 ROW PERMITOF WAY EUC PERMIT PERMIT NUMBER City of Edmonds EdmondsRIGHT •:0 www -. •. i Description: PUD - REPLACE BO POLE BORE NEW CONDUIT & INSTALL TRANSFORMER ISSUED: 05/07/2024 Address: 22807 106TH PL W EDMONDS WA 98020-6165 EXPIRES: 11/07/2024 Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00507700000600 NAME TYPE NAME ADDRESS PHONE APPLICANT MOE MATTHEWS PO BOX 1107, EVERETT WA 98206 (425)783-5681 CONTACT SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-5681 CONTRACTOR SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-4353 OWNER JAMES E & ZAVAGLIA-OL OLIVER 22807 106TH PL W, EDMONDS WA 98020-6165 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00 ENG - INSPECTIONS $252.00 $252.00 RIGHT-OF-WAY PERMIT - STANDARD $378.00 $378.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: MAJ DATE: 05/07/2024 Printed: Tuesday, May 07, 2024 5:18:45 PM 1 of 2 RIGHT OF WAY EUC PERMIT PERMIT NUMIBE City of Edmonds ....121 Sth Ave N, Edmonds WA •:0 www.edmondswa.gov • • CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START X-2 ENGINEERING FINAL** E-7 RESTOR LIMITS Printed: Tuesday, May 07, 2024 5:18:45 PM 2 of 2 WO# 100122709 of EpM04O� SECTION A RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right-of-Wgy permit Handout E6�. RECEIVED Mar 29 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A' instead of leaving blank. All fields required. Incomplete Applications will be denied. General Info Project Name BO PLI 2295 Replacement Site Address or if no site address use Property Address at NW corner of project area: 22807 106th PI W Edmonds, WA 98020 Associated Permits: BLD PLN ENG • Name of Company applicable) Snohomish County PUD Franchise Ordinance No: N/A Point of Contact Andy Tran Title Engineering Tech III Address 2320 California St city Everett State WA zip 98201 Phone 425-359-1123 Email AXTran@snopud.com Contractor and Authorized Agent of Owner Name of Company Same info as above (see note below) Contractor Contacts During Construction Primary Name Agent Name Title Title Mobile Address Email City State Zip Secondary Name Phone Title Email Mobile City of Edmonds Business License No: Email State License No: 313-005-741 Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC18.6o.o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? VOther, please specify: Pole Replacement ❑ Utility Franchise Work associated with development (check one of the above boxes as welt ❑ Traffic Control Only (no associated development) ❑ Utility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) PUD Maintenance to replace (1) single-phase deadend BO pole, (1) submersible transformer with a padmount transformer, and BO primary cable to transformer that feeds existing 6-lot short plat at 22807 106th PI W Edmonds. New 2" conduit to be installed via Trenchless road bore to replace conduit and BO cable. Existing BO cable is direct buried. Westbound lane of 106th PI W (residential road) to be closed for 4-8 hours for pole replacement between 8AM-3PM. Northbound lane of 106th PI W (residential road) to be closed for 4-8 hours for transformer replacement between 8AM-3PM. No tree trimming required. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF I x LF SF Alley 72 hours + LF Ix I LF SF Parking 72 hours + LF Ix I LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable Vpower ❑ gas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes V No 2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? V If yes, describe: New 2" bore to replace existing direct buried cable. Existing submersible transformer to be replaced with a padriounttrarisformer. 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? X 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? X 5. Does the work involve proposed additions to an aboveground utility stem? If es: X Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: None to be added. BO Cable to be replaced. V How many are existing? I I How many are to be added? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: How many poles are existing in the project area? 1 single-phase deadend pole. What is the height of the existing poles? 45' How many poles are to be removed? None. Are additional poles to be laced? None. How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: How many? 1 1 1 What is the height of the poles after? 45'. Same height. Describe the modification rebuild: Replacement SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: A�Zar DATE: 3/28/2024 APPLICANT PRINTED NAME: APPLICANT TITLE: Engineering Tech III NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM SNO_O_I II COUNTY p T� PUBLIC UTILITY DISTRICT NO.1 OF SNOHOMISH COUNTY LOCATION 22807 106TH PL W EDMONDS, WA 98020 SOUTH COUNTYAREA POLE NO. 2295 NW1/4S 36 T 27 R 3 DATE 3/18/2024 ORDER 100122709 REASON FOR WORK PUD TO REPLACE BO POLE 2295. ENGINEER AXTRAN OPERATION 0030 DRAFTER U.G. N0, SCALE 1=100' APPROVED & I DATE PRINTED DATE WORK COMPLETED FOREMAN FEES REO'D ❑ YES ■ NO PRIMARY OVERHEAD ❑ RESIDENTIAL ❑ COMMERCIAL LEO NO. '@$ '=$ yxK�P►UL1:�il�l�:�l�[�'. BASIC FEE S METER/CONV.POLE $ PRIMARY UNDERGROUND ❑ RESIDENTIAL ❑ COMMERCIAL BASIC FEE S LEU NO. SECONDARY UNDERGROUND BASIC FEE $ UNDERGROUND PLAT BASIC FEE S CE FT.@$ STREET LIGHTING CL FT.@$ WORK IN RIGHT OF WAY ❑ PRIMARY ❑ SECONDARY (� FT.@$ _$ MISCELLANEOUS FEES VAULT $ PERMIT S TOTAL DUE S DATE PAID RECEIPT NO. SERVICE ORDER NO. F(,FNn: NESC VIOLATIONS ■ NO ❑ YES (SEE NOTES) PERMITS (DATE GRANTED) ❑ TREE TRIM ❑ STATE ❑ COUNTY ■ CITY 11 EASEMENTS ❑ REQUIRED ■ NOT REQUIRED DATE RELEASED FOREIGN CONTACTS ■ JPN# ❑ JOINT TRENCH ZIPLY & CATV ❑ JOINT BORE ZIPLY & CATV POLE STENCILING FROM TO TAKE OFF POLE PRE-CONST. REQUIRMENTS ❑ TREE TRIM ❑ PUD LOCATOR ❑ BACKHOE ❑ FLAGGING ■ ONE CALL DATE No. STREET LIGHTING ❑ YES ■ NO M&R AS -BUILT GIs GIs QC M&R GIs Ph JOINT USE LOCATION MAP PAGE 474 F1 O EXISTING POLE 0 EXISTING POLE -TO BE REMOVED • NEW POLE * NEW POLE TO REPLACE EXISTING POLE DATE SUBSTATION RPK CIRCUIT NO. 12-232 PHASE 2 ENGR'S TEL. # 425-783-8262 ENGR'S CELL # 425-359-1123 TRANSFER OF UTILITIES, REMOVAL OF POLE AND FINAL RESTORATION TO BE CONSISTENT WITH APPLICABLE POLE ATTACHMENT AGREEMENT(S) AND JOINT OWNERSHIP POLE AGREEMENT SCHEMATIC BEFORE & AFTER 10 KVA FU40 J 0 = Z O O 37 KVA A-1401 231 228TH ST SW (1)°2 ACSR PRI — 1 (ll "2 ACSR NEUT 25 KVA TO CKT RPK 12-232 C0 OA PLI# 2295, NEW PLI# ---------- SET 45' CL2 POLE W/ GND (PW2045, N0110), 3' EAST AS STAKED. SET DEPTH = 6.5' USE 5/8" GRVL BCKFLL, CMPCT IN 6" LFTS FRAME 1PH VERTICAL DEADEND (12V109). INSTL (1) 3/8" PRI DIG TO NEW (1) 8" AHR, L= 10' W (GO113, A0101). INSTL (1) 3/8" NEUT DIG TO 8" AHR (130113). FRAME 1PH UG TERMINAL FU40T (12U111). REFER TO UG DWG# 956-2 FOR UG CABLE REPLACEMENT ON OP0060. XFR EXISTING 10 KVA XFMR 10-357728. XFR SL-130624-A ON NEW 4' MAST ARM (1-0501). S;PR P A49— TCP PC C CII� /'`/ILAAAI IAII/'`ATifIAIC. I Y 2295 �2' 10-357728 1818-18/02 SL-130624-A 231 55/09 22808 1 J 2 2 3 4 - PUD TO ENFORCE POLE ATTACHMENT 22830 AGREEMENT. - PUD IS RESPONSIBLE FOR ENSURING THAT THE OLD POLES ARE REMOVED. OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE 22831 22729 9 8TH ST SW U 252494 025-386829 6 E03248 32 SL-102291-A L-22807 22740 18-18- 8/02 231 5 0000l 1 22820 SL-101970-A 015-290403 277450 Q 22830 O ENGINEERING DIVISION APPROVED AS NOTED JXUJI1�z05/01 /2024 Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. RECEIVED Mar 29 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT �i Pun LAYOUT LEGEND: PAD MOUNTED TRANSFORMER ® SUBMERSIBLE TRANSFORMER Q ABOVE GROUND J-BOX 0 SUBMERSIBLE J-BOX Q SECONDARY VAULT PULLING VAULT O PAD MOUNTED SWITCH CABINET O SUBMERSIBLE SWITCH CABINET © SMALL SECONDARY PEDESTAL © LARGE SECONDARY PEDESTAL SL STREET LIGHT PEDESTAL PRIMARY UNDERGROUND CABLE -•—•—•—•—•- #350 SECONDARY UNDERGROUND CABLE - - - - - - - - 4/0 SECONDARY UNDERGROUND CABLE ........................• 1/0 SECONDARY UNDERGROUND CABLE ----�—�-STREET LIGHT CABLE SERVICE CONDUIT o POLE AND OVERHEAD LINE - - PROPERTY LINE RIGHT-OF-WAY LINE U EXISTING UNDERGROUND CABLE EXISTING DUCT — FUTURE DUCT ------- 5------ SANITARY SEWER/MANHOLE ------- D ------C STORM DRAIN/CATCH BASIN ------- W ------ WATER MAIN/METER FIRE HYDRANT } STREET LIGHT * UNDERGROUND LOCATOR MARKER SCHEMATIC: REFER TO SHEET S1 OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE CONSTRUCTION NOTES: AT PL12295 POLE TO BE REPLACED ON B-SKETCH ON OPN #0030. FRAME POLE WITH NEW 10 UGND PRIMARY RISER FU 40T (12U111). INSTALL CABLE TAG PER SCHEMATIC. AT VAULT A-1401 REMOVE EXISTING LID. REMOVE EXISTING SUBMERSIBLE 37.5 KVA XFMR. DIST P- -X SER MAKE INSTALL (1) 4'0" x 4'0" x 6" W/26" x 21" ACCESS OPENING VAULT COVER (VO307). INSTALL 2-GROUND RODS (NO304). SET (1) 37.5 KVA 120/240V XFMR (BC12P). UTC SER MAKE INSTALL (1)1/0 15KV ELBOW TERMINATION (T1105). INSTALL (1) DEADEND CAP (T1701). REMOVE EXISTING UGND SEC RED. SET (1) SM UGND SEC RED (1U801). INSTALL 11' OF 350 KCMIL AL TPX TO NEW RED (C1204). INSTALL CABLE TAG PER SCHEMATIC. CABLE ALL FOOTAGES APPROXIMATE FROM NEW POLE TO A-1401 208' OF (1) 1/0 AL 15KV CNCTRC NEUT JCKTD PRI IN 2" HDPE MAKE PO REEL FT MARK TO TOTAL FOOTAGE OF 1/0 CABLE INSTALLEDw208' 11' OF 350 KCMIL AL TPX SEC IN 3" PVC DUCT DIRECTIONAL BORE BY PUD'S CONTRACTOR OA 160' OF (1) 2" HDPE W/90° STEEL OR FIBERGLASS BEND TOTAL FOOTAGE OF 2" HDPE INSTALLED: 160' CABLE NOTES: FROM PLI 2295 TO A-1401, ABANDON PRIMARY UGND CABLE# 2023. TOTAL FOOTAGE: 208' 22725 I 1 22724 10-357728 NEW POLE ET T ON TO SE ORD#100 BEPN O#0030 PLI 2295 228TH STREET SW 1 1 I I ABANDONED UGND CABLE 22808 2023 A i 22807 I I W a LAYOUT 1" = 30' N NORTH LOCATION 22807 106TH PLACE W.EDMONOS 98020 AREA LYNNWOOD POLE No NEW POLE NW1/4S36 T27 R3 DATE 3/6/24 ORDER 100122709 REASON FOR WORK REPLACE BO CABLE FOR ENGINEER A. TRAN OPERATION 0060 VAULT A-1401 DRAFTER MGPHERSON UGND NO 956-2 APPROVED PAS SCALE NOTED a DATE WORK COMPLETED FOREMAN DATE 3/21/24 SUBSTATION RICHMOND PARK INSPECTOR CIRCUIT NO 12-232 PHASE 2 DATE FEES REOVD ❑ YES ■ NO ROAD CROSSINGS ONLY PRIMARY QVERHEA. APPV DATE I DESCRIPTION ❑ RESIDENTIAL ❑ COMMERCIAL LEO# REVISIONS .f =f APPV NO. I DATE I DESCRIPTION PRIMARY UNDERGROUND ❑ RESIDENTIAL ❑ COMMERCIAL BASIC FEE S LEU- o fi'- f SECONDARY UNDERGROUND BASIC FEES WORK IN RIGHT OF WAY ❑ PRIMARY ❑ SECONDARY FT m S = f AS -BUILT APPV NO. I DATE DESCRIPTION MISCELLANEOUS FEES VAULT S_ PERMIT S S TOTAL DUES_ DATE PAID RECEIPT• ENGINEER ANDY TRAN CUSTOMER PHONE (425) 783-8262 PHONE CELLULAR (425) 359-1123 CELLULAR DISTRICT PROJECT LEADER Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. ENGINEERING DIVISION APPROVED AS NOTED VICINITY MAP PERMITS (DATE GRANTED) ❑ TREE TRIM ❑ STATE ❑ COUNTY ■ EDMONDS EASEMENTS ❑ REQUIRED E ■ NOT REQUIRED REQUEST NO. DATE APPROVED FOREIGN CONTACTS ❑ JPN- ❑ JOINT TRENCH ZIPLY & CATV ❑ JOINT BORE ZIPLY & CATV POLE STENCILING FROM TO TAKE OFF POLE PRE-CONSTR REQUIREMENTS ❑ TREE TRIM ❑ PUD LOCATOR ❑ BACKHOE ❑ ■ ONE CALL DATE STREET LIGHTING ❑ YES ■ NO M&R AS -BUILT GIS GIS QC1 M&R GIS Phl IJOINT USE LOCATION MAP PAGE 474,F1 PRINTED TAGS RECEIVED z N VAULT: EXISTING Mar 29 2024 0 CABLE: 116255 CITY OF EDMONDS (0 oa DEVELOPMENT SERVICES DEPARTMENT � 40 Jell i�Q✓.,� H, iTn?_ 05/01 /2024 LANE CLOSURE ON A LOW VOLUME ROAD (NO FLAGGER, TRAFFIC SELF-REGULATING, 35 MPH OR LESS) ROAD W20-1 WORK AHEAD N X ONE LANE if W20-4 ROAAHEAD • x • O • o • LEI• PL I 2295 • = m O • W ZQ • LoO X ONE LANE i ROAD W20-4 AHEAD X ROAD i WORK W20-1 AHEAD RECEIVED ENGINEERING DIVISION AS NOTED Mar 29 2024 jell jell LV,ii /L .'/ z 05/01 /2024 DEVELOPMENT SOERDV CES vv DEPARTMENT SNOHOMISH COUNTY TRAFFIC CONTROL PLAN [PULD PUBLIC UTILITY DISTRICT NO 1 PROJECT BO PL 1 2295 LOCATION 22807 106TH PL W EDMONDS, WA 98020 ENGINEER ANDY TRAN DATE 3/28/2024 ORDER 100122709 PHONE 425-783-8262 CELLULAR 425-359-1123 LANE CLOSURE ON A LOW VOLUVE ROAD NEAR A CULDESAC (NO FLAGGER, TRAFFIC SELF-REGULATING, 35 MPH OR LESS) W20-1 ROAD WORK AHEAD X W20-4 ONE LANE if ROAD AHED • • o • • ® A-1401 o • m • • W ZQ • _6o x ROAD i WORK W20-1 AHEAD ENGINEERING DIVISION APPROVED AS NOTED ,%ill tV l,, j $,442 vv 05/01 /2024 SNOHOMISH COUNTY TRAFFIC CONTROL PLAN LFDLLLILD PUBLIC UTILITY DISTRICT NO 1 PROJECT BO PL 1 2295 LOCATION 22807 106TH PL W EDMONDS, WA 98020 ENGINEER ANDY TRAN DATE 3/28/2024 ORDER 100122709 PHONE 425-783-8262 CELLULAR 425-359-1123 RECEIVED Mar 29 2024 CITY OF EDMONDS CITY OF EDMONDS MyBuildingPermit.com DEVELOPMENT SERVICES DEPARTMENT Right -of -Way Application #1465656 - 100122709 Applicant First Name Last Name Company Name Moe Matthews Snohomish County PUD Number Street Apartment or Suite Number E-mail Address PO Box 1107 permits@snopud.com City State Zip Phone Number Extension Everett WA 98206 (425) 783-5681 Contractor Company Name Contractor Unknown Number Street Apartment or Suite Number City State Zip Phone Number Extension State License Number License Expiration Date UBI # E-mail Address Project Location Number Street Floor Number Suite or Room Number 22807 106TH PL W City Zip Code County Parcel Number EDMONDS 98020 00507700000600 Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name James E & Zavaglia-Oliver Angela Tr Oliver Number Street Apartment or Suite Number 22807 106TH PL W City State Zip EDMONDS WA 98020-6165 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 3/29/2024 Submitted By: Moe Matthews Page 1 of 2 CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1465656 - 100122709 Project Contact Company Name: Snohomish County PUD Name: Moe Matthews Email: permits@snopud.com Address: PO Box 1107 Phone #: (425) 783-5681 Everett WA 98206 Project Type Activity Type Scope of Work Utility Purveyor Utility Work Disturbance of Surface Project Name: 100122709 PUD will replace a pole and a submersible transformer with a padmount transformer. Primary Description of cable will need to be replaced with new 2: conduit for a road bore. Existing cable is direct Work: buried. Westbound lane will be blocked for about 4-8 hours and northbound lane of 106th PL W will be blocked for 4-8 hours for the transformer replacement. Project Details Project Information Job Number 100122709 Page 2 of 2