Loading...
APPROVED BLD2023-1162+Structural Memo+9.14.2023_12.14.34_PM+3783290" RECEIVED Sep 14 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2023-1162 STRUCTURAL MEMO MALSAM TSANG ATTN Chris Town DATE September 8, 2023 STRUCTURAL ENGINEERING TO Town Construction & Development FROM Warren Cent 1818 178th St SW PROJECT 720 Driftwood Ln Lynnwood, WA 98037 5535-2023-01-01 T 206.947.8818 RE 720 Driftwood Ln — Renovation Design It is our understanding that there is concern with the proposed remodel intentions for the residence located at 720 Driftwood Ln and if structural review/design is required. On September 7, we met on site with the build team to review the proposed alterations to the existing residence. Upon observation of the as -built framing conditions and remodel intentions, a partial framing plan & detail, along with structural calculations and general notes have been provided to address the new beam over the kitchen & dining room spaces. It is our understanding that there was also a concern with the proposed shifting of bathroom door at the west end of the residence. Upon observation of the framing in the roof, this wall was found to be non-structural and the shifting of the door poses no structural impact. Please let us know if you have any further questions. Thank you wz__ Warren Cent CITY OF EDMONDS BUILDING DIVISION APPROVED PLAN 09/25/2023 Eri & Cr. 122 S JACKSON ST I SUITE 210 1 SEATTLE WA 98104 1 206.789.6038 EXISTING BUILDING NO STRUCTURAL CHANGES (E) CEILING AND ROOF SHEATHING HANGS TO BEAM (4)SDWS 0.22"0 x 3' (E) CEILING FRAMI] HANGS TO BEAM NEW BEAM PER PL NFW I I I.R HANC,FR I DPROVIDE MATCHING POST BELOW AND CONTRACTOR TO ALIGN 1POSTw/ (E)BEARING WALL AND DEDICATED FOOTING BELOW ROOF FRAMING PLAN -p P. ol MALSAM TSANG STRUCTURAL ENGINEERING SFAi0.{, W� �)B9 wJ2i VB9 EOa3) Q h g CWC � C 0 W Z U O J a- uj W W W 2 -J Z _j J X 31W=i -0T �87 SLA N.k JMT DATE 9S23 EXISTING BUILDING NO STRUCTURAL CHANGES (E) CEILING AND ROOF SHEATHING HANGS TO BEAM (4)SDWS 0.22"0 x 3' (E) CEILING FRAMIl HANGS TO BEAM NEW BEAM PER PLC NEW LUS HANGER L .—.—. -------------------------------- N ( MATCHING POST BELOW ANDDE CONTRACTO POSTIw/(E)BEARINGWALLAND EDICATEDFOOTI GTO ALIGN DROOF FRAMING PLAN ii MALSAM TSANG STRUCTURAL ENGINEERING 1:3 5 uP10N Si wrt olo sure, w 30eM9e0JBi Sn>99GW3i Q °w ui n- o uj z U 2 J c) (L w w Q w J z a J O z cr utit- m o W n 0 cr T O z C o G 1 di o' U) " VJ " sRrtT: S,.D Wf•ilHR JMT D�iE 9823