Loading...
DNS-BLD2023-1369+Transportation_Impact_Form+11.7.2023_11.01.47_AM+3885880OV Ff)4f APPENDIX A Page 1 of 2 Transportation Impact Analysis Worksheet PERMITTING & DEVELOPMENT ENGINEERING D I V I S 10 N 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: Brackett Court Townhouses Owner/Applicant Kautz Route, LLC Name PO Box 31097 Street/Mailing Address Seattle, WA 98103 City Telephone: State zip 206-213-0810 Applicant Contact Person: Neil Latta, PE Name 5970 Birch Point Road Street/Mailing Address Blaine, WA 98230 City State Telephone: (360) 671-7002 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Telephone: 1. PROJECT DESCRIPTION Contact Name E-mail: a. Location - Street address:23224 EDMONDS WAY #108 b. Specify existing land use:Rental Townhouses zip (Attach a vicinity map and site plan.) c. Specify proposed type and size of development: For -sale Townhouses via Unit Lot Subdivision (# of residential units andlor squarefootage of building) d. Date construction will begin and be completed:No new construction. Change of tenure only e. Define proposed access locations: f. Define DroDosed sialit distance at site earess locations: HANDOUT UPDATED 05.09.2023 APPENDIX A Page 2 of 2 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 3.36.125., except as otherwise provided for independent fee calculations in ECDC 3.36.130. Check the applicable box below and calculate the fees as necessary: X NO CHANGE CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was pertnitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 impact fee rate shall be used. Units in ITE Land Use Category Per Unit Fee square feet, Rate # of dwelling, vfp, etc. New Use $ X Prior Use $ X New Use Fee: $ - Prior Use Fee: $ FEE DUE: $ 11 NEW DEVELOPMENT ITE Land Use Category Per Unit Fee Rate New Use $ 11 INDEPENDENT FEE CALCULATION X Units in square feet, # of dwelling, vfb. etc. Impact/Mitigation Fee: $ Independent Review Fee: $296.00 (+ peer review fee) 1 $ Use Fee FEE DUE FEE DUE City of Edmonds, Engineering Division Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 05.09.2023